The below Regulation requirements are to be followed while installing Pressure Testing Bay/Cell within the PCFC Jurisdiction area.
a. The minimum length of the pressure test bay must be based on the consideration of the maximum length of the tool to be tested.
b. The minimum width of the bay should be sufficient for the Forklift movement for equipment handling. If the facility has an overhead crane, then the width can be
considerably designed based on the equipment details.
a. The concrete walls and floor thickness shall be designed as per test pressure.
b. Internal side of the wall should be lined with energy absorbing material such as wood or compressed wood fiber panels.
c. The floor should be with proper drainage arrangements and with adequate slope for easy disposal of spilled fluids, floor must be covered with non-slippery material.
d. Proper anchor arrangement should be provided for blind flanges, vices and the stands have to be provided during testing process.
Sump should be provided to drain all testing fluid and the fluid should be r...