Unified UAE Legislation Database

Trakhees Regulations PS 37.0 Building Maintenance Unit

Status

In force

Issuing Authority

Ports, Customs and Free Zone Corporation

Effective date

XX.XX.XXXX

Official Link

https://

37.1 Building with installations of BMU shall take approvals or should be incorporated on the initial submission drawings for EHS-NOC-BP that meets the following requirements- required load sustaining capabilities of platforms, building components, hoisting and supporting equipment; stability factors for carriages, platforms and supporting equipment; maximum horizontal force for movement of carriages and davits; design of carriages, hoisting machines, wire rope and stabilization systems; and design criteria for electrical wiring and equipment.

 

37.2 Once the installation is completed and prior to use EHS approved third party has to certify that the installation has been inspected, tested and maintained in compliance with the requirements and that all protection anchorages meet the requirements of the manufacturer.

 

37.3 Building anchors which extend beyond the face of the building shall be free of sharp edges or points. Where cables, suspension wire ropes and lifelines may be in contact with the building face, external building anchors shall not interfere with their handling or operation.

 

37.4 The intermittent stabilization...