Unified UAE Legislation Database
Checked by realLaw AI

Trakhees Guidelines GB 6.0 Green Building Implementation Kit

Status

In force

Issuing Authority

Ports, Customs and Free Zone Corporation

PCFC- Entity (Business Unit) Name: Trakhees (Dept. of Planning & Development) 

Department Name: Civil Engineering Department (CED)

Section Name: Permits (Sustainability)

Document Reference Number: PCFC-TRK-CED-GB-G06

Revision Number: 01

Revision Date: December 2018

Classification: Public

 

Introduction

This document is being issued by CED Sustainability department in the interest of the stakeholders so that all the collective efforts put in till the NOC-BP process are channelled accurately as it progresses towards the actual construction and implementation stage.

Most importantly this document is to maximize the value to the client in terms of reaping the benefits intended and expected out of the proposed green building facility.

 

Scope

This general guideline is applicable to all the stakeholders involved in the Green building projects within Dubai World business units under the Ports, Customs and Free Zone Corporation (PCFC).

 

Aim

The aim of this document is to highlight the importance of certain activities integral to the shaping up of the green building projects and motivate the stakeholders into following the steps outlined under Background

 

Sections

For the sake of clarity, this document is divided into following sections

1. Design to Delivery

2. Green Briefing

3. Stakeholder's Responsibilities

4. Construction related Tasks

5. Procurement

6. Installation & Commissioning related tasks

7. Progress Reports

8. Certification

9. Green Performance

 

Design to Delivery

Now that your proposed facility has been designed to embrace sustainability it is very important to ensure that the sustainability criteria embedded up to this stage are ACTUALLY  DELIVERED AT SITE.

This requires commitment and sincerity of ALL the stakeholders.

 

Process

A project approached with this motive would bring in the desired results and assist all the stakeholders.

 

Green Briefing

This is a strategy to bring the necessary awareness to ALL relevant team members on the project, its green credentials, expectations, scope etc and renew their commitment and full support for the project.

It ensures that the green principles conceived and implemented up to the contract stage are seamlessly carried forward to the construction and operations. The exact nature of the team would vary depending on the project scope. This is an important aspect at the beginning of the project which should not be
compromised. 

a. Client's representative

b. Green Building consultant where relevant

c. Commissioning authority if applicable

d. Architectural Engineering consultantSite in charge

e. MEP consultant — site representative

f.  Main contractor

g. MEP / Building services contractor

h. Others    

 

Stakeholder's responsibilities

Please note that the development of sustainable building (Green Building) is a collective process wherein individual players have to work together to keep the link strong. In that regard each and every stakeholder has a specific role to play. This cannot be undermined. Hence you as a team are asked to

a. Assign the right responsibility in relation this project

b. Identify the deliverables

c. Ensure that those responsibilities are carried out and deliverables met

d. Have proper continuous monitoring mechanism

 

Construction related Tasks

As the project progresses from design to construction, there are additional tasks that are required at the construction site to ensure adherence to the green building regulations. Site management, Indoor air quality management, site drawing reviews, etc have to be borne in mind at appropriate stages. The responsibility should be delegated on the right team to achieve this.

 

Procurement

It is very crucial that the procurement team is fully connected with the process so that ONLY those products, systems and technologies that would help the project in complying with the green building commitments are used for the project. Inappropriate envelope including glazing and fenestration, paints, MEP equipment, ventilation systems etc can jeopardize the project and prevent it from reaching its potential in terms of achieving the committed credits and certifications. Green Building consultants, commissioning authorities, architectural consultants...