PCFC-Entity (Business Unit) Name: Trakhees (Dept. of Planning & Development)
Department Name: Civil Engineering Department (CED)
Section Name: Permits (Sustainability)
Document Reference Number: PCFC-TRK-CED-GB-G05
Revision Number: 01
Revision Date: December 2018
Classification:Public
The Green Building Department of the Environment, Health and Safety- TRAKHEES as a competent authority and regulatory arm of Dubai World Business Units under the Ports, Customs and Free Zone Corporation (PCFC) for all Green Building activities has developed this 'Existing Buildings - Energy Efficiency Guidelines" for the purpose of assisting the stakeholders in improving the efficiency of their building/ facilities.
This general guideline is applicable to all the existing plot owners/ buildings / facilities within Dubai
World business units under the Ports, Customs and Free Zone Corporation (PCFC). This is also applicable to the energy assessors and Green Building consultants working on the green building projects within the jurisdiction who may potentially offer these services for the clients.
The aim of this document is to highlight the importance of improving the energy efficiency of existing stock of buildings and to familiarize the stakeholders with the processes and sequence of activities involved in the Energy Efficiency Improvement Program (EEIP). The document provides an understanding of the role played by independent energy auditors / energy management firms that offer the subject services and the deliverables that are generally expected. It is intended to equip the facility owners with the required tools in order to enable them to align the concept of existing building efficiency program specifically to their facilities and its operations and accordingly make an informed decision on deploying a suitable program.
Energy Efficiency and sustainability is widely talked about in the present day scenario owing to the enormous benefits they offer to ALL the stakeholders. Several sustainability/green building codes are already in practice and have been satisfactorily followed for NEW constructions at international, federal and local levels. The infrastructure for facilitation of the green building regulations/guidelines for New Construction have developed to a satisfactory level and the awareness has spread to a stage where there is keenness on the part of the developers and other stakeholders to embrace sustainability on new constructions.
However, there is a window of opportunity in relation to existing stock of buildings / facilities that have not been tapped as yet to the full potential. It is universally recognized that Existing stock of buildings and resources conservation hold the key to Environmental sustainability and is expected to play a key role in climate change adaptation. There are several existing facilities that serve as a large reserve for potential energy and peak demand saving.
It is against this backdrop that this document has been developed.
The purpose of carrying out energy improvements on existing facilities is multi fold. Besides helping the facility to reduce its operational costs it has several other benefits that can be briefly spelt out as under:
1. Identify opportunities for energy conservation specific to the organization / facility
2. Establishing an energy management program based on the valuable data generated by the program.
3. Maintain an efficient balance between a building's annual functional energy requirements and its annual actual energy consumption.
4. Reduce wastage of resources
5. Increasing profitability
6. Reduction in carbon footprint and contributing to environmental sustainability.
7. Creating awareness to other stakeholders
8. Demonstrating the commitment to the environment by conserving the resources (CSR)
The Energy Efficiency improvement program for an organization / facility is an elaborate and well-structured process that comprises series of activities predominantly comprising the following phases:
1. Auditing
2. Implementation
3. Measurement & Verification (M&V) also referred to as Monitoring
A brief explanation of these activities has been provided below while a detailed description is provided later.
Auditing also referred to as Stage-1 of the program, is the starting point of the program and comprises the activities carried out on the facility that is subject to energy efficiency improvement program. It includes data collection, analysis and reporting of the information to the client /stakeholders INCLUDING Energy Conserving measures (ECM), financial calculations, feasibility etc.
Further explanation is provided under the methodology section.
Implementation is referred to as Stage-2 of the program and refers to the actual work of taking forward the recommendations of the auditing to a practical level. This process comprises several activities such as planning, bidding, award of contract, procurement, installation and commissioning if applicable to specific systems. Management of the implementation is a key process that is included in the above phase.
Monitoring phase refers to tasks involving actual monitoring of the implemented energy conservation measures and ascertaining if they are yielding the desired results. This stage can be treated as the benchmark of the efficacy of the Energy Conservation Measure (ECM) and the overall program. This is stage-3 of the program.
The energy audit is the first task to be performed in the accomplishment of an effective energy efficiency cost control program. An energy audit consists of a detailed examination of how a facility uses energy, what the facility pays for energy, and finally, a recommended program for changes in operating practices or energy-consuming equipment that will cost effectively save on utility bills.
An energy audit brings new opportunities to light. It can reveal undetected weaknesses in the function of the building/facility, and provides the owners with options that save money. In addition to enhancing the current building performance, an energy audit will serve as a valuable tool in planning and budget preparation for future improvements.
The process begins with a qualified engineer, who performs an onsite review of the facility's energy-consuming components comprising all of but not limited to:
a. HVAC equipment - including chillers, boilers, and the air-handling system.
b. Lighting.
c. Building automation.
d. Domestic hot-water system.
e. Process loads (if any).
The proposed auditing methodology includes two major activities for conducting a successful energy audit:-
A. Energy Analysis also called the Assessment program; and
B. Energy Audit Report
A. Energy Analysis (Assessment Program)
The Analysis stage is divided into two phases depending on the nature and size of the facility:-
1. Establishment of the "Energy Committee".
The facility's management will establish an energy committee representing the facility and an independent energy auditing company. The committee may include the Administration, Finance, Production, and Engineering/ Maintenance departments of the client underlying the integrative approach. The Committee Leader is chosen by the facility management to act as a liaison between the facility management and the Energy Auditing Company, fully authorized to coordinate and manage the project effectively.
In addition to carrying out the energy analysis as per the basic Audit requirement, the scope of Energy auditing Company may extend beyond such as to oversee the implementations, to assist the project in establishing an energy mandate / Corporate Energy Policy, as a tool to transfer the management's energy efficiency commitment to the facility's operators and personnel.
The committee's role would be:-
a. Review and follow up the action plan set for the project.
b. Provide and facilitate data required for the Energy Audit.
c. Follow up the project's progress/results presented in the committee's periodic meetings.
d. Management should support the Energy Committee, follow up, and recognize the Committee's achievements and results.
2. Implementation of a systematic energy use management process. From the very beginning of any energy study, and for the purpose of a proper review of designs,
a systematic energy-related costs analysis is performed. All aspects of hypothetical energy related consumption are verified, value being determined by building a model based on new proposed activities, partially based on current behaviour, and patterns of consumption in similar facilities.
Model consumption's will be verified, analyzed and compiled using established, proven analysis software or similar other standard computing methods.
This exercise enables the establishment of a "reference year", for the energy consumption which will serve as a benchmark for assessing savings in the future.
Such a detailed Energy efficient study is divided into three main sections:
(2a) Analysis of each facility's operational characteristics
(2b) Evaluation of Energy Uses by equipment / sector and
(2c) Preparation of a summary and Energy Balance
These are further explained in the section below.
2.a. Analysis of Each Facility's Operational Characteristics
This activity allows the analysis of the facility's operational characteristics in terms of energy consumption.
The facility's operational characteristics are analyzed based on the details provided such as drawing plans and equipment specifications. Additional surveys, measures taken on site
and discussions with those in charge of operating the facilities permit a more accurate evaluation.
The first step is to collect and analyze the information, which is directly related to energy consumption. To do so, the following subjects are addressed:
I. Identification of each facility sector
II. Service Schedule
III. Characteristics are fine tuned
2.b. Evaluation of Energy Uses by Equipment / Sector
The establishment of an energy consumption reference year, as well as the identification of adjustment factors that might affect the consumption may also be included in the
study.
The energy consumption reference year for each facility gives a picture of energy consumption before the implementation of the Energy Conservation Program and allows
further monitoring. This activity consists of an energy consumption identification, which is linked to equipment and operating methods. Information on the level of operation is also included in the definition of this reference year. In summary, the reference year provides the details on energy that will be spent for each category of the energy consumption in the buildings.
To determine precisely the savings resulting from the implementation of an Energy Conservation Program, it is necessary to adjust the reference year in the light of factors
affecting consumption.
These factors include, among others the level of activities and establishment of adjustment factors which make the reference year dynamic and allow adjustments on the
basis of monthly conditions.
2.c. Establishment of the Energy Balance
The above two activities allow the establishment and the understanding of the relationship between the pattern of operation of the energy consuming equipment and
the energy bill.
The collected data will be used to design a model representing energy consumption in the facility.
The model will simulate the energy bill under different influencing factors such as;
temperature, occupancy, working hours, etc., and compare results with past energy bill to validate data adopted in the study. This will be shown as a graph called the Energy
Balance, which verifies the actual electricity consumption of the facility as against the one that is charged by the utility.
B. Energy Audit Report (Results)
The following details the items to be included in the Energy Audit Reporting activity.
1. Identification of appropriate energy saving measures
This activity represents the core of the study. It includes the selection of conservation measure and the formulation of technical and financial parameters for each of these measures.
The measures to be evaluated come from different sources that will be considered during the audit process. The Energy Auditing Team should have an in depth knowledge of conservation measures relating to building services, and follows closely the development of new technologies.
Calculation tools used to evaluate savings will be chosen on the basis of the scope and type of planned measures.
The Energy Auditing Company should have a solid expertise in the use of building simulation software. The format of calculation results is also very important to future management of the program results.
Unlike normal energy auditing practices, which supply only annual results, the specialized energy auditing company should calculate conservation measures in a way to identify, on a monthly basis, expected variation in all parameters affecting energy savings. This method guarantees a more precise calculation of savings and also makes it easier to verify, on a monthly basis, whether anticipated results will be achieved or not.
All the expected savings in demand and consumption are computable in the computer 'Energy Model' in order to prepare results monitoring. Savings are calculated on a monthly basis using the 'reference year' as a starting point, and using a cascade method taking into account the exact rate structure.
The profitability of each measure will be evaluated individually, based on savings, implementation costs, expected rises of energy rates, and the starting month of the Energy Conservation Program.
All the low cost/ no cost measures will be addressed and tabulated in the same table.
2. Preparation of the "Energy Audit Report"
During this activity, results of the various energy conservation measures selected for implementation are consolidated. Every measure is analyzed to determine whether it presents
significant possibilities for reducing energy consumption. The most promising measures are then subject to a detailed cost benefit analysis based on the following criteria:-
- Annual Savings
- Percentage of Energy Conservation
- Monetary Savings
- Cost of Implementation
- Payback period
Where several options for one measure are considered, each scenario is evaluated. A complete pay back scenario for all selected measures is also produced.
Finally, the energy balance showing the reference year and the forecast year is supplied in the form of a table and a graph.
3. Presentation to the Management of the facilities and establishment of the Action Plan
A preliminary report is prepared and presents, as precisely as possible, the expected energy savings versus the implementation cost of each measure.
Each energy saving measure will be provided with its standard Monitoring & Verification (M&V) method. This will be identified and proposed. The monitoring and verification method details how savings are verified for savings calculation purposes.
4. Establishment of the Financial Calculations
A preliminary financial calculation sheet detailing; the "Total Cost of Implementation-TCI", generated savings and the payback period shall be prepared in the form of a "cash flow" table, showing a forecast of investment stages and how savings will pay back...