Unified UAE Legislation Database
Machine-read text — original PDF attached

Trakhees Guidelines GB 11.0 Guideline for Green Building Submissions (Warehouse Post Design Submission NOC BCC)

Status

In force

Issuing Authority

Ports, Customs and Free Zone Corporation
PCFC- Entity (Business Unit) Name:Trakhees (Dept. of Planning & Development)
Department Name:Civil Engineering Department (CED)
Green Building Submission - Sample Format

REGULATION

SUBMISSION PHASE

WAREHOUSE & INDUSTRIAL DEVELOPMENTS

Post Construction Submission [NOC-BCC]

Introduction

This document is being issued by Trakhees Sustainability department in the interest of the stakeholders so as to enable them to make a proper submission. Most importantly this document is to provide the stakeholders with a broad perspective of the type of evidence Trakhees Sustainability Department expects in the process of review of their submissions prior to approvals.

Scope

This general guideline is applicable to all the stakeholders involved in the Green building projects within Trakhees - PCFC / Dubai World business units

Aim

The aim of this document is to highlight the importance of supporting documentation and evidence in order to establish the fulfilment of a credit in the project. It is important that the project stakeholders comprising the client, Architectural & Engineering consultant, green building specialist(if involved in the project) and others together are able to demonstrate the compliance to the Regulation and its requirements in a clear and consistent manner. This entails supporting documentation comprising calculations, reports, photographs etc. depending on the nature of the credit

Sections

This guideline is given in the form of a several slides each representing a specific section of the regulation

Conclusion

This guideline provides a broad framework of the documentation involved in actual implementation of the green building principles and is intended purely to familiarize the client and the other stakeholders on the need to adequately demonstrate the compliance through several mechanisms. While this serves to throw light on the basic requirements, the stakeholders can exercise their option and judgment in including other forms of evidence that they feel are crucial in demonstrating the compliance

This document (Submission sample format ) has been prepared to serve as a guideline (assistance) for the consultants and contractors to prepare their submission packages to Trakhees. This should not be seen as an all inclusive requirement of Trakhees-Trakhees or as a set of instructions which if complied with would lead to automatic approval from the authority. It will be the sole responsibility of the consultant and the contractor to ascertain the actual requirements and expectations of the regulations and ensure that the submissions that they make to the authorities are complete with ALL the evidence deemed essential to demonstrate the compliance.

This guideline does not bind Trakhees in limiting its response to the elements of this document. Trakhees has the right to ask additional information / clarification / documentation that it may feel essential for demonstrating the compliance.

Should you need any assistance please do not hesitate to contact the department

GENERAL GUIDELINES
  1. Fill out the Submission Booklet
  2. Collate the evidence required as per the Regulation.
  3. Suggested formats / documentation as highlighted in this document
  4. Put together the submission package in a structured manner as illustrated
STRUCTURING THE GREEN BUILDING SUBMISSION PACKAGE

FORM TRK-CED-GB-CF(04)a

مؤسسة الموانئ والجمارك والمنطقة الحرة Ports, Customs and Free Zone Corporation Submission Booklet (Checklist for GBPP submission – NOC BCC – Warehouses & Industrial Developments) prior the Dubai Building Code Implementation APPLICABILITY Regulation : GB-06: Green Building Regulations – Warehouses & Industrial Developments POPS: TRK-CED-GB-0002-06 Procedure : Procedure for NOC-BCC Green Building Submission (Warehouses & Industrial Developments) POPS: TRK-CED-GB-CF(04a) Phase : NOC-BCC This booklet comprises the checklists for various elements of the green building regulations and is meant to be used by the stakeholders concerned for providing accurate information on the project. It comprises the following parts Part-1 Project Summary Part-2 Checklist for Green Building submission Part-3 Green Building Compliance Statement Part-4 Envelope Commitment Sheet Part-5 AC System Compliance Sheet Part-6 Energy Statement Sheet Disclaimer This checklist has been developed for project teams to see when compiling the submission documentation for Trachea, Gedea / Assessment A completed version of this checklist must be included within the Main Submission. The accuracy and completeness of the submission is entirely the responsibility of the project team. Trachea will not be held accountable for incorrect or incomplete submissions sent for assessment. TRK-CED-GB-CF(04a) Fax: 01 / Apr 2021 Page 1 of 27

A. GENERAL REQUIREMENTS

A2 Post Contract Green Briefing

Copies of Minutes of Meeting

Minutes of Meeting – (23rd March’14)

Minutes of Meeting (4th Aug’14)

Date stamped photos of the Meeting

B1

Compliance with Thermal Insulation system & Best Practices Energy Conservation

AS BUILT U Value Calculations of ALL the Envelope components

Materials&SystemsPlot No/ Area No :- 9/6/12 11:32 AM
SuppliersProject:- REVISED

B1

Compliance with Thermal Insulation system & Best Practices Energy Conservation

AS USED Material datasheets / Technical data sheet -Envelope components

Metal Roof & Wall Sandwich Panel

TR 45/250

The TR 45/250 profile produced by TigerPROFILES can be used to produce sandwich panels in a wide range of external and internal sheets of various thicknesses, coatings and colors.

The PUR/PIR insulation core is produced in varying thicknesses of respective thermal insulation values as follows:

PUR/PIR Core Thickness (mm)Overall Heat Transfer Co-efficientAdditional Value of Insulation in Corrugated Area
W/m²°CKcal/m²h°CBTU/Ft²h°F
T—300.630.520.11034%
T—400.480.400.08325%

B1

Compliance with Thermal Insulation system & Best Practices Energy Conservation

AS USED Material datasheets / Technical data sheet -Envelope components

Technical Data Sheet

Product: Triple Layered Skylight Panels

Product Material: Glass-fibre Reinforced Polyester (GRP/FGRP)

Panel Profile: AP 45/250

Panel Thickness: 75 mm [38 mm +37 mm]

Mechanical Data

Thickness : 1.5mm Top profile sheet; 1.5 mm Intermediate skin & 1.5mm Bottom liner sheet Colour : Translucent Tensile strength : 85 N/mm² Flexural strength : 140 N/mm² Impact strength : 75 mJ/mm² Shear strength : 70 N/mm² Elastic modulus : 8000 N/mm² Flexural modulus : 6000 N/mm² Hardness (Barcol) : 40 N/mm²

Thermal Data

Thermal conductivity (k-value) : 0.145 W/mK Thermal transmittance (U-value) : 1.90 W/m²K Thermal expansion coefficient : 24 x 10⁻⁶ m/°C Operating temperature : -10 °C to +90 °C Solar Heat Gain Coefficient (SHGC) : 0.56

B1

Compliance with Thermal Insulation system & Best Practices Energy Conservation

AS USED Material datasheets / Technical data sheet -Envelope components

B1

Compliance with Thermal Insulation system & Best Practices Energy Conservation

AS USED Material datasheets / Technical data sheet -Envelope components

  
 6MM PNA SOLAR-E
ARCTIC BLUE (#2)
16MM AIRSPACE
6MM CLEAR

B1

Compliance with Thermal Insulation system & Best Practices Energy Conservation

AS USED Material datasheets / Technical data sheet -Envelope components

CHARACTERISTICS6MM PILKINGTON SYP YBE 2240 (#4)
12MM AIRSPACE
6MM CLEAR
VISIBLE LIGHT 

THE ABOVE MENTIONED VALUES ARE CALCULATED USING WINDOWS 6.3 PROGRAM (SUMMER CONDITION NFRC 100-2001)

B1

Compliance with Thermal Insulation system & Best Practices Energy Conservation

AS USED Material datasheets / Technical data sheet -Envelope components

  1. Light Transmission

85 %+-5% ASTM D1494

  1. Mechanical Properties
Tensile Strength: 7.8 kn/cm^2ASTM D638
Compressive Strength: 16.2 kn/cm^2ASTM D695
  1. Physical Properties
Density: 1431.9 kg/m^3ASTM D792
Water Absorption: <0.25%ASTM D570
  1. Thermal Property
U-Value: 1.1-2.5 w/m²C°ASTM E424

B1

Compliance with Thermal Insulation system & Best Practices Energy Conservation
TEST REPORT Where applicable

REPORT ON

THERMAL TRANSMISSION PROPERTIES BY CALCULATION METHOD

ACCORDING TO BS EN ISO 6946

REFERENCE NO.

: TT-198-14

ISSUE DATE

: 10/04/2014

CLIENT

: Hussain Abbas Block Factory

PRODUCT

: 200 mm thick Concrete-Polystyrene Sandwich Masonry block

PRODUCT DESCRIPTION

: Normal Weight Concrete-Polystyrene Hollow Sandwich Masonry Blocks

PRODUCT WEIGHT (kg)

: (400200200)mm with 60 mm thick Extruded polystyrene insert

PRODUCT THICKNESS (m)

: 22

(PERPENDICULAR TO HEAT FLOW

DIRECTION)

: 0.2

PRODUCT CONFIGURATION :

Product's COMPONENTSDENSITY (kg/m³)THERMAL CONDUCTIVITY (W/(m.K))CONDITION of TESTTEST REPORT / REFERENCE
% RH°C
CALCULATION RESULTSUPPER LIMITLOWER LIMITAVERAGE
THERMAL RESISTANCE (m².KW)2.5962.3602.473

Table 2 - Thermal Transmission Properties for a Single Layer

ASTM C 518 - 10

Exova Sample No.: 12-06-M0009

DescriptionResults
ValueSI UnitsValueImperial Units

Note: The results in Table 2 are calculated based on the measured results from Table 1. They are calculated assuming a linear relationship between thickness and the measured properties. This may or may not be the case.

B1 Compliance with Thermal Insulation system & Best Practices Energy Consn
Site Photographs
B1 Compliance with Thermal Insulation system & Best Practices Energy Consn
Site Photographs

B2

Limiting / Reversing Thermal Bridges

As-Built Drawings of Continuous Insulation

Photographs of Continuous Insulation

B3 Envelope Tightness (Prescriptive Based)

Letter of undertaking with proposed Timeframe for Completing the exercise

3.00 Pending Items Time frame for completion (DD/MM/YY)

  1. Thermal Imaging

28-May-2015

Letter of appointment / Contract of qualified thermographer (Only Technical scope required)

Method Statement – From Qualified Thermographer

B4 Envelope Tightness (Performance Based)

THIS IS A VOLUNTARY CREDIT ...

Blower Door Test Report

Date stamped Photographs

Details of Rectification work post test

B5

Efficient sizing of HVAC system

HVAC

Approved Material Datasheets / Technical Catalogues

LX-HWT-018--0-TLX-HWT-025--0-TLX-HWT-030--0-TLX-HWT-038--0-T
18,00025,00030,00038,000
5.287.338.7910.55

B5

Efficient sizing of HVAC system
HVAC
Approved Material Datasheets / Technical Catalogues

SPECIFICATIONS - SINGLE PHASE

General DataModel No.TSA024S4TSA030S4TSA036S4TSA048S4TSA060S4
 Nominal kW (tonnage)7.0 (2)8.8 (2.5)10.5 (3)14.1 (4)17.6 (5)

B5

Efficient sizing of HVAC system

HVAC

Approved Material Datasheets / Technical Catalogues

Specification Charts

R=10A

R=22

MODEL LX-HWT-012-0-T
COOLING CAPACITY (COOLING ONLY)btu/h12,000

B5

Efficient sizing of HVAC system

HVAC

Site Photographs

B5

Efficient sizing of HVAC system

HVAC

Site Photographs

B5

Efficient sizing of HVAC system

HVAC

As Built Drawing and As-Built Schedule of Equipment

AS BUILT

EQUIPMENT SCHEDULE

AREA SERIESCO. REF.*Carrier MODELQTY.SIZECFMWEIGHTPOWER SUPPLY-ISOLATOR
LENGTH X WIDTH X HEIGHT 
OFFICE SFGAC-1AFINISF06000811357 x 560 x 537 175080 Kg.0.6 kW, 220/1/50 Hz
OFFICE SFGAC-1BFINISF06000811357 x 560 x 537 175080 Kg.0.6 kW, 220/1/50 Hz

EQUIPMENT SCHEDULE

AREA SERIESCO. REF.*Carrier MODELCAPACITYQTY.SIZEWEIGHTPOWER SUPPLY-ISOLATOR
TXSMLENGTH X WIDTH X HEIGHT 
OFFICE SFGAC-1A380HE0900948.538.01792 x 792 x 732 102 Kg.5.8 kW, 380/3/50 Hz
OFFICE SFGAC-1B380HE0900948.538.01792 x 792 x 732 102 Kg.5.8 kW, 380/3/50 Hz

B6

Central Air-conditioning Units with Energy Recovery Units (ERV)

Approved Material Datasheets / Technical Catalogues

ModelUnitDRV 300DRV 600
Supply / Exhaust Airflow RateCMH300/270600/540
Maximum ESP RangePa200200

B6

Central Air-conditioning Units with Energy Recovery Units (ERV)

Energy Recovery Table with Efficiency details

Roof Layout indicating the Air to Air Heat Exchanger / ERV

B7 AC SELECTION WITH HIGH EER

Catalogue / Technical datasheet showing the EER

Nominal Conditions R-410A / R-407C

TYPERefrigerant GasINDOOROUTDOORCooling CapacityAir Flow
Turbo / Hi / Med / Lo / Quiet (CFM)
EERPower Input (kW)
TONkWW/WBtu/W
B7 AC SELECTION WITH HIGH EER

Date stamped photographs of the AC units

B8

Energy Efficient Auxiliary Systems of HVAC – Blowers and Pumps

Pump / Motor Performance Curves and Selection point

B8

Energy Efficient Auxiliary Systems of HVAC – Blowers and Pumps

Approved Material Datasheets / Technical Catalogues

B9 Interior Lighting Levels
AS-BUILT LPD Chart
GROUND FLOOR OFFICE BLOCK
Sl No.ZoneArea sqftAs DesignedASHRAE RequirementsEHS AS-BUILT DETAILS
WattsLPDLPDWattsLPDWatts
1Below Mezzanine2414.9910080.421.12656.490.81,931.99
2Upholstry772.856720.870.9695.570.5386.43
MEZZANINE FLOOR OFFICE BLOCK
Sl No.ZoneArea sqftWattsLPDLPDWattsLPDWatts
1Curtain Upholstry1351.36720.500.91216.170.7945.91
2Office516.673360.651.1568.340.5258.34
Total Wattage6,25411,2317,783
Total Percentage of Savings compared to ASHRAE44.31%
Total Percentage of Savings compared to EHS19.64%
B9 Interior Lighting Levels
AS-BUILT LPD Chart
Interior Lighting Levels
Sl.No.Room NameArea (m2)EHS recommended LPD (W/sq.ft)As per Actual design LPD (W/sq.ft)As per actual design LPD (W/m2)Achieved WattsEHS Watts
Ground floor
1Spare-1130.81.0010.8140110.97
B9 Interior Lighting Levels
Date Stamped Photographs of ALL Luminaries

B9 Interior Lighting Levels

Catalogue of ALL Installed Lamps

RECESSED DOWNLIGHT

FRDL - VITA 1 SERIES

FRATER Downlights are suitable for single or twin compact fluorescent lamp and HID. Lar

Application: Suitable for offices, reception areas, corridors, hotel lobbies, shops and com ly made compatible where there is restriction of height between ceilings & the roof or duct

Material & Finish:

Housing: CRCA sheet steel reinforced structure finished with off-white powder coating in are provided for easy installation & suitable for all applications.

Trim: Off white powder coated sheet steel trim.

Reflector: High purity spun aluminium with vacuum metalized coating to provide a high li

Lamp holders: Horizontally mounted with G24 base, for cfl lamps with flame-retardant P tants and porcelain holders for HID lamps.

B9 Interior Lighting Levels
Catalogue of ALL Installed Lamps

Electronic ballasts for fluorescent lamps Standard ECG

PC T8 TOP, 18 – 58 W T8 fluorescent lamps

Product description

  • Average life = 50,000 hours (at max ta. with a failure rate ≤ 0.2 % per 1,000 hours)
  • Large temperature range (for values see table)
  • Safety shutdown at end of life
  • Automatic start after replacement of defective lamps
  • Constant luminous flux irrespective of fluctuations in mains voltage
  • For luminaires of protection class 1 and protection class 2
  • Temperature protection as per EN 61347-2-3 C5e
  • For product data sheet go to www.tridonic.com, or available on request

Technical data

AC voltage range198 – 264 V
DC voltage rangeNot supported
B9 Interior Lighting Levels
Catalogue of ALL Installed Lamps

Specification Sheet : H13-230-400HSC For 400W Metal Halide Lamps 220-240V 50/60Hz Electronic

CE

Mechanical Data:

As-BUILT Drawings

CASE LENGTH167mm - 6.57"
CASE WIDTH127.5mm - 5.02"

Electrical Data:

LAMP 
NUMBER1 400W MH

Wiring Diagram:

Ballast Case must be grounded

B9 Interior Lighting Levels
As-BUILT Drawings with Legends
Legends should incorporate the Wattages

B9

Interior Lighting Levels

As-BUILT Drawings with Legends

Legends should incorporate the Wattages

ASBUILT

ELECTRICAL LEGENDS
 2x18W DOWN LIGHT(ELECTRONIC BALLAST)

B10

Exterior Lighting Levels

Catalogue of ALL Installed Exterior Lamps

Date Stamped Photographs of ALL Luminaries

B10

Exterior Lighting Levels
As-BUILT Drawings with Legends
Legends should incorporate the Wattages
ELECTRICAL LEGENDS
⬆2x18W DOWN LIGHT(ELECTRONIC BALLAST)
⬇4X18W FLUORESCENT LIGHT(ELECTRONIC BALLAST)

B11

Use of Renewable Sources of Energy for domestic heating
As-BUILT Drawings

B11

Use of Renewable Sources of Energy for domestic heating

Catalogue of the Installed Solar Thermal System

Date Stamped Photograph of the installation

Commissioning Report

B12

Use of Renewable Sources of Energy for Power

Catalogue of the Installed Solar Thermal System

Date Stamped Photograph of the installation

As-BUILT Drawings

Solar PV system layout

Notes in the Electrical Drawing

Commissioning Report

B13

Energy Metering
AS-BUILT Single Line Diagram Indicating Meters
AS BUILT DRAWING

SMDB-WH-3 TCL 103.75KW MAX.DMD=93.38KW (AT-.9)

B13

Energy Metering
AS-BUILT Metering Schedule
ENERGY METER TABLE
S.N
O
METER NAMERELATED
DB.
TOTAL
KW
ELECTRIC LOAD
TYPE
DB LOCATIONREMARKS
1ENERGY METER 1DB-1-GF15.60 KWLIGHT & POWRGF RECEPTION 
2ENERGY METER 2DB-1-GF-AC10.99 KWACGF RECEPTION 
NOTES:
  1. DB GUARD ROOM IS VERY SMALL LOAD (3.59 KW) ONLY THAT IS WHY ENERGY METER MAY BE NOT REQUIRED
  2. FOR DB PUMP ROOM, & TEL. THE ELECTRIC CONSUMPTION LOAD IS USUALLY OFF., AND IT WILL BE USED IN THE EMERGENCY CASE ONLY THAT IS WHY ENERGY METER MAY BE NOT REQUIRED
B13
Energy Metering
Catalogue of Installed Sub Meters

EM306-C(96x96)

EM306(96x96)

FEATURES

6 digit 7 segment LED display. (\succ) User programmable CT primary. Memory retention. Potential free Pulse output for energy.

90 to 270V AC/DC auxiliary supply. RS485 communication (MODBUS Protocol) (Applicable for EM306-C Only)

SPECIFICATIONS
DISPLAY

6 digit 7 segment LED display. Height 0.5"

LED INDICATIONS

INT - Integration of energy

X10 - Resolution is 10

REV - Reverse connected CT warning

Date Stamped Photos – Sub Meters

B14

COMMISSIONING

Commissioning Report

Photographic evidence as applicable for the commissioned systems

  1. Letter of Undertaking for Commissioning
  2. Timeline for commissioning
B14
COMMISSIONING
Commissioning Report
PROJECT DATE 10/10/2015
CONSULTANT  

B15

BUILDING ENERGY SIMULATION REPORT [Conditioned areas > 2000 m2]

General

  1. GB consultant to follow same requirements as LEED based regulation.
  2. GB should be from Trakhees re qualified list.

A copy of the AS BUILT Energy Modeling Report

TABLE OF CONTENTS

1.0INTRODUCTION2
2.0PROJECT SIMULATION METHODOLOGY2

APPENDIX A: BUILDING SIMULATION FILES

A copy of the Simulation output from software

B15

BUILDING ENERGY SIMULATION REPORT [areas > 2000 m²]

A copy of the AS BUILT Building Simulation Results

Project Name
AlternativeElectrical End-use in kWhCost in USDEnergy Savings
w.r.t Base case
LightsEquipmentHeatingCoolingFansHot WaterExt. LightsTotal
Base case Average31348525297522347478666377424847344931144554114752 
Proposed case1992072529756385312266783704847238278778778755223.3%
AlternativeLightsEquipmentHeatingCoolingPumpsFansHot waterExt. LightsExt. Equip.Total Energy
kWh/AnnumTon-hrkWh/Annum
Base Case185,69656...