| PCFC- Entity (Business Unit) Name | : | Trakhees (Dept. of Planning & Development) |
| Department Name | : | Civil Engineering Department (CED) |
REGULATION
SUBMISSION PHASE
WAREHOUSE & INDUSTRIAL DEVELOPMENTS
Post Construction Submission [NOC-BCC]
This document is being issued by Trakhees Sustainability department in the interest of the stakeholders so as to enable them to make a proper submission. Most importantly this document is to provide the stakeholders with a broad perspective of the type of evidence Trakhees Sustainability Department expects in the process of review of their submissions prior to approvals.
This general guideline is applicable to all the stakeholders involved in the Green building projects within Trakhees - PCFC / Dubai World business units
The aim of this document is to highlight the importance of supporting documentation and evidence in order to establish the fulfilment of a credit in the project. It is important that the project stakeholders comprising the client, Architectural & Engineering consultant, green building specialist(if involved in the project) and others together are able to demonstrate the compliance to the Regulation and its requirements in a clear and consistent manner. This entails supporting documentation comprising calculations, reports, photographs etc. depending on the nature of the credit
This guideline is given in the form of a several slides each representing a specific section of the regulation
This guideline provides a broad framework of the documentation involved in actual implementation of the green building principles and is intended purely to familiarize the client and the other stakeholders on the need to adequately demonstrate the compliance through several mechanisms. While this serves to throw light on the basic requirements, the stakeholders can exercise their option and judgment in including other forms of evidence that they feel are crucial in demonstrating the compliance
This document (Submission sample format ) has been prepared to serve as a guideline (assistance) for the consultants and contractors to prepare their submission packages to Trakhees. This should not be seen as an all inclusive requirement of Trakhees-Trakhees or as a set of instructions which if complied with would lead to automatic approval from the authority. It will be the sole responsibility of the consultant and the contractor to ascertain the actual requirements and expectations of the regulations and ensure that the submissions that they make to the authorities are complete with ALL the evidence deemed essential to demonstrate the compliance.
This guideline does not bind Trakhees in limiting its response to the elements of this document. Trakhees has the right to ask additional information / clarification / documentation that it may feel essential for demonstrating the compliance.
Should you need any assistance please do not hesitate to contact the department
FORM TRK-CED-GB-CF(04)a
مؤسسة الموانئ والجمارك والمنطقة الحرة Ports, Customs and Free Zone Corporation Submission Booklet (Checklist for GBPP submission – NOC BCC – Warehouses & Industrial Developments) prior the Dubai Building Code Implementation APPLICABILITY Regulation : GB-06: Green Building Regulations – Warehouses & Industrial Developments POPS: TRK-CED-GB-0002-06 Procedure : Procedure for NOC-BCC Green Building Submission (Warehouses & Industrial Developments) POPS: TRK-CED-GB-CF(04a) Phase : NOC-BCC This booklet comprises the checklists for various elements of the green building regulations and is meant to be used by the stakeholders concerned for providing accurate information on the project. It comprises the following parts Part-1 Project Summary Part-2 Checklist for Green Building submission Part-3 Green Building Compliance Statement Part-4 Envelope Commitment Sheet Part-5 AC System Compliance Sheet Part-6 Energy Statement Sheet Disclaimer This checklist has been developed for project teams to see when compiling the submission documentation for Trachea, Gedea / Assessment A completed version of this checklist must be included within the Main Submission. The accuracy and completeness of the submission is entirely the responsibility of the project team. Trachea will not be held accountable for incorrect or incomplete submissions sent for assessment. TRK-CED-GB-CF(04a) Fax: 01 / Apr 2021 Page 1 of 27
A2 Post Contract Green Briefing
Copies of Minutes of Meeting
Minutes of Meeting – (23rd March’14)
Minutes of Meeting (4th Aug’14)
Date stamped photos of the Meeting
B1
AS BUILT U Value Calculations of ALL the Envelope components
| Materials&Systems | Plot No/ Area No :- | 9/6/12 11:32 AM | ||||
| Suppliers | Project:- | REVISED | ||||
B1
AS USED Material datasheets / Technical data sheet -Envelope components
TR 45/250
The TR 45/250 profile produced by TigerPROFILES can be used to produce sandwich panels in a wide range of external and internal sheets of various thicknesses, coatings and colors.
The PUR/PIR insulation core is produced in varying thicknesses of respective thermal insulation values as follows:
| PUR/PIR Core Thickness (mm) | Overall Heat Transfer Co-efficient | Additional Value of Insulation in Corrugated Area | ||
|---|---|---|---|---|
| W/m²°C | Kcal/m²h°C | BTU/Ft²h°F | ||
| T—30 | 0.63 | 0.52 | 0.110 | 34% |
| T—40 | 0.48 | 0.40 | 0.083 | 25% |
B1
AS USED Material datasheets / Technical data sheet -Envelope components
Product: Triple Layered Skylight Panels
Product Material: Glass-fibre Reinforced Polyester (GRP/FGRP)
Panel Profile: AP 45/250
Panel Thickness: 75 mm [38 mm +37 mm]
Thickness : 1.5mm Top profile sheet; 1.5 mm Intermediate skin & 1.5mm Bottom liner sheet Colour : Translucent Tensile strength : 85 N/mm² Flexural strength : 140 N/mm² Impact strength : 75 mJ/mm² Shear strength : 70 N/mm² Elastic modulus : 8000 N/mm² Flexural modulus : 6000 N/mm² Hardness (Barcol) : 40 N/mm²
Thermal conductivity (k-value) : 0.145 W/mK Thermal transmittance (U-value) : 1.90 W/m²K Thermal expansion coefficient : 24 x 10⁻⁶ m/°C Operating temperature : -10 °C to +90 °C Solar Heat Gain Coefficient (SHGC) : 0.56
B1
AS USED Material datasheets / Technical data sheet -Envelope components
B1
AS USED Material datasheets / Technical data sheet -Envelope components
| 6MM PNA SOLAR-E ARCTIC BLUE (#2) 16MM AIRSPACE 6MM CLEAR |
B1
AS USED Material datasheets / Technical data sheet -Envelope components
| CHARACTERISTICS | 6MM PILKINGTON SYP YBE 2240 (#4) 12MM AIRSPACE 6MM CLEAR |
| VISIBLE LIGHT |
THE ABOVE MENTIONED VALUES ARE CALCULATED USING WINDOWS 6.3 PROGRAM (SUMMER CONDITION NFRC 100-2001)
B1
AS USED Material datasheets / Technical data sheet -Envelope components
85 %+-5% ASTM D1494
| Tensile Strength | : 7.8 kn/cm^2 | ASTM D638 |
| Compressive Strength | : 16.2 kn/cm^2 | ASTM D695 |
| Density | : 1431.9 kg/m^3 | ASTM D792 |
| Water Absorption | : <0.25% | ASTM D570 |
| U-Value | : 1.1-2.5 w/m²C° | ASTM E424 |
B1
REPORT ON
THERMAL TRANSMISSION PROPERTIES BY CALCULATION METHOD
ACCORDING TO BS EN ISO 6946
REFERENCE NO.
: TT-198-14
ISSUE DATE
: 10/04/2014
CLIENT
: Hussain Abbas Block Factory
PRODUCT
: 200 mm thick Concrete-Polystyrene Sandwich Masonry block
PRODUCT DESCRIPTION
: Normal Weight Concrete-Polystyrene Hollow Sandwich Masonry Blocks
PRODUCT WEIGHT (kg)
: (400200200)mm with 60 mm thick Extruded polystyrene insert
PRODUCT THICKNESS (m)
: 22
(PERPENDICULAR TO HEAT FLOW
DIRECTION)
: 0.2
PRODUCT CONFIGURATION :
| Product's COMPONENTS | DENSITY (kg/m³) | THERMAL CONDUCTIVITY (W/(m.K)) | CONDITION of TEST | TEST REPORT / REFERENCE | |
| % RH | °C | ||||
| CALCULATION RESULTS | UPPER LIMIT | LOWER LIMIT | AVERAGE |
| THERMAL RESISTANCE (m².KW) | 2.596 | 2.360 | 2.473 |
Table 2 - Thermal Transmission Properties for a Single Layer
ASTM C 518 - 10
Exova Sample No.: 12-06-M0009
| Description | Results | |||
| Value | SI Units | Value | Imperial Units | |
Note: The results in Table 2 are calculated based on the measured results from Table 1. They are calculated assuming a linear relationship between thickness and the measured properties. This may or may not be the case.
B2
Limiting / Reversing Thermal Bridges
As-Built Drawings of Continuous Insulation
Photographs of Continuous Insulation
Letter of undertaking with proposed Timeframe for Completing the exercise
3.00 Pending Items Time frame for completion (DD/MM/YY)
28-May-2015
Letter of appointment / Contract of qualified thermographer (Only Technical scope required)
Method Statement – From Qualified Thermographer
B4 Envelope Tightness (Performance Based)
THIS IS A VOLUNTARY CREDIT ...
Blower Door Test Report
Date stamped Photographs
Details of Rectification work post test
B5
Efficient sizing of HVAC system
HVAC
Approved Material Datasheets / Technical Catalogues
| LX-HWT-018--0-T | LX-HWT-025--0-T | LX-HWT-030--0-T | LX-HWT-038--0-T |
|---|---|---|---|
| 18,000 | 25,000 | 30,000 | 38,000 |
| 5.28 | 7.33 | 8.79 | 10.55 |
B5
SPECIFICATIONS - SINGLE PHASE
| General Data | Model No. | TSA024S4 | TSA030S4 | TSA036S4 | TSA048S4 | TSA060S4 |
| Nominal kW (tonnage) | 7.0 (2) | 8.8 (2.5) | 10.5 (3) | 14.1 (4) | 17.6 (5) |
B5
Efficient sizing of HVAC system
HVAC
Approved Material Datasheets / Technical Catalogues
Specification Charts
R=10A
R=22
| MODEL | LX-HWT-012-0-T | |
| COOLING CAPACITY (COOLING ONLY) | btu/h | 12,000 |
B5
Efficient sizing of HVAC system
HVAC
Site Photographs
B5
Efficient sizing of HVAC system
HVAC
Site Photographs
B5
Efficient sizing of HVAC system
HVAC
As Built Drawing and As-Built Schedule of Equipment
AS BUILT
EQUIPMENT SCHEDULE
| AREA SERIES | CO. REF. | *Carrier MODEL | QTY. | SIZE | CFM | WEIGHT | POWER SUPPLY-ISOLATOR | |
|---|---|---|---|---|---|---|---|---|
| LENGTH X WIDTH X HEIGHT | ||||||||
| OFFICE SF | GAC-1A | FINISF060008 | 1 | 1357 x 560 x 537 | 1750 | 80 Kg. | 0.6 kW, 220/1/50 Hz | |
| OFFICE SF | GAC-1B | FINISF060008 | 1 | 1357 x 560 x 537 | 1750 | 80 Kg. | 0.6 kW, 220/1/50 Hz | |
EQUIPMENT SCHEDULE
| AREA SERIES | CO. REF. | *Carrier MODEL | CAPACITY | QTY. | SIZE | WEIGHT | POWER SUPPLY-ISOLATOR | ||
|---|---|---|---|---|---|---|---|---|---|
| TX | SM | LENGTH X WIDTH X HEIGHT | |||||||
| OFFICE SF | GAC-1A | 380HE09009 | 48.5 | 38.0 | 1 | 792 x 792 x 732 | 102 Kg. | 5.8 kW, 380/3/50 Hz | |
| OFFICE SF | GAC-1B | 380HE09009 | 48.5 | 38.0 | 1 | 792 x 792 x 732 | 102 Kg. | 5.8 kW, 380/3/50 Hz | |
B6
Approved Material Datasheets / Technical Catalogues
| Model | Unit | DRV 300 | DRV 600 |
|---|---|---|---|
| Supply / Exhaust Airflow Rate | CMH | 300/270 | 600/540 |
| Maximum ESP Range | Pa | 200 | 200 |
B6
Energy Recovery Table with Efficiency details
Roof Layout indicating the Air to Air Heat Exchanger / ERV
Catalogue / Technical datasheet showing the EER
Nominal Conditions R-410A / R-407C
| TYPE | Refrigerant Gas | INDOOR | OUTDOOR | Cooling Capacity | Air Flow Turbo / Hi / Med / Lo / Quiet (CFM) | EER | Power Input (kW) | ||
|---|---|---|---|---|---|---|---|---|---|
| TON | kW | W/W | Btu/W | ||||||
Date stamped photographs of the AC units
B8
Pump / Motor Performance Curves and Selection point
B8
Approved Material Datasheets / Technical Catalogues
| Sl No. | Zone | Area sqft | As Designed | ASHRAE Requirements | EHS AS-BUILT DETAILS | |||
|---|---|---|---|---|---|---|---|---|
| Watts | LPD | LPD | Watts | LPD | Watts | |||
| 1 | Below Mezzanine | 2414.99 | 1008 | 0.42 | 1.1 | 2656.49 | 0.8 | 1,931.99 |
| 2 | Upholstry | 772.85 | 672 | 0.87 | 0.9 | 695.57 | 0.5 | 386.43 |
| Sl No. | Zone | Area sqft | Watts | LPD | LPD | Watts | LPD | Watts |
|---|---|---|---|---|---|---|---|---|
| 1 | Curtain Upholstry | 1351.3 | 672 | 0.50 | 0.9 | 1216.17 | 0.7 | 945.91 |
| 2 | Office | 516.67 | 336 | 0.65 | 1.1 | 568.34 | 0.5 | 258.34 |
| Total Wattage | 6,254 | 11,231 | 7,783 |
| Total Percentage of Savings compared to ASHRAE | 44.31% |
| Total Percentage of Savings compared to EHS | 19.64% |
| Interior Lighting Levels | |||||||
|---|---|---|---|---|---|---|---|
| Sl.No. | Room Name | Area (m2) | EHS recommended LPD (W/sq.ft) | As per Actual design LPD (W/sq.ft) | As per actual design LPD (W/m2) | Achieved Watts | EHS Watts |
| Ground floor | |||||||
| 1 | Spare-1 | 13 | 0.8 | 1.00 | 10.8 | 140 | 110.97 |
B9 Interior Lighting Levels
Catalogue of ALL Installed Lamps
FRDL - VITA 1 SERIES
FRATER Downlights are suitable for single or twin compact fluorescent lamp and HID. Lar
Application: Suitable for offices, reception areas, corridors, hotel lobbies, shops and com ly made compatible where there is restriction of height between ceilings & the roof or duct
Material & Finish:
Housing: CRCA sheet steel reinforced structure finished with off-white powder coating in are provided for easy installation & suitable for all applications.
Trim: Off white powder coated sheet steel trim.
Reflector: High purity spun aluminium with vacuum metalized coating to provide a high li
Lamp holders: Horizontally mounted with G24 base, for cfl lamps with flame-retardant P tants and porcelain holders for HID lamps.
Electronic ballasts for fluorescent lamps Standard ECG
PC T8 TOP, 18 – 58 W T8 fluorescent lamps
Product description
Technical data
| AC voltage range | 198 – 264 V |
| DC voltage range | Not supported |
Specification Sheet : H13-230-400HSC For 400W Metal Halide Lamps 220-240V 50/60Hz Electronic
CE
Mechanical Data:
As-BUILT Drawings
| CASE LENGTH | 167mm - 6.57" |
| CASE WIDTH | 127.5mm - 5.02" |
Electrical Data:
| LAMP | |
| NUMBER | 1 400W MH |
Wiring Diagram:
Ballast Case must be grounded
B9
Interior Lighting Levels
As-BUILT Drawings with Legends
Legends should incorporate the Wattages
ASBUILT
| ELECTRICAL LEGENDS | |
|---|---|
| 2x18W DOWN LIGHT(ELECTRONIC BALLAST) | |
B10
Catalogue of ALL Installed Exterior Lamps
Date Stamped Photographs of ALL Luminaries
B10
| ELECTRICAL LEGENDS | |
|---|---|
| ⬆ | 2x18W DOWN LIGHT(ELECTRONIC BALLAST) |
| ⬇ | 4X18W FLUORESCENT LIGHT(ELECTRONIC BALLAST) |
B11
B11
Catalogue of the Installed Solar Thermal System
Date Stamped Photograph of the installation
Commissioning Report
B12
Catalogue of the Installed Solar Thermal System
Date Stamped Photograph of the installation
As-BUILT Drawings
Solar PV system layout
Notes in the Electrical Drawing
Commissioning Report
B13
SMDB-WH-3 TCL 103.75KW MAX.DMD=93.38KW (AT-.9)
B13
| S.N O | METER NAME | RELATED DB. | TOTAL KW | ELECTRIC LOAD TYPE | DB LOCATION | REMARKS |
|---|---|---|---|---|---|---|
| 1 | ENERGY METER 1 | DB-1-GF | 15.60 KW | LIGHT & POWR | GF RECEPTION | |
| 2 | ENERGY METER 2 | DB-1-GF-AC | 10.99 KW | AC | GF RECEPTION |
EM306-C(96x96)
EM306(96x96)
6 digit 7 segment LED display. (\succ) User programmable CT primary. Memory retention. Potential free Pulse output for energy.
90 to 270V AC/DC auxiliary supply. RS485 communication (MODBUS Protocol) (Applicable for EM306-C Only)
6 digit 7 segment LED display. Height 0.5"
INT - Integration of energy
X10 - Resolution is 10
REV - Reverse connected CT warning
B14
Commissioning Report
Photographic evidence as applicable for the commissioned systems
| PROJECT | DATE 10/10/2015 | |||
| CONSULTANT | ||||
B15
General
A copy of the AS BUILT Energy Modeling Report
TABLE OF CONTENTS
| 1.0 | INTRODUCTION | 2 |
| 2.0 | PROJECT SIMULATION METHODOLOGY | 2 |
APPENDIX A: BUILDING SIMULATION FILES
A copy of the Simulation output from software
B15
A copy of the AS BUILT Building Simulation Results
| Project Name | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| Alternative | Electrical End-use in kWh | Cost in USD | Energy Savings w.r.t Base case | |||||||
| Lights | Equipment | Heating | Cooling | Fans | Hot Water | Ext. Lights | Total | |||
| Base case Average | 313485 | 252975 | 22347 | 478666 | 37742 | 4847 | 34493 | 1144554 | 114752 | |
| Proposed case | 199207 | 252975 | 6385 | 312266 | 78370 | 4847 | 23827 | 877877 | 87552 | 23.3% |
| Alternative | Lights | Equipment | Heating | Cooling | Pumps | Fans | Hot water | Ext. Lights | Ext. Equip. | Total Energy |
|---|---|---|---|---|---|---|---|---|---|---|
| kWh/Annum | Ton-hr | kWh/Annum | ||||||||
| Base Case | 185,696 | 56... | ||||||||