Green Building Submission - Sample Format

REGULATION

SUBMISSION PHASE

WAREHOUSE & INDUSTRIAL DEVELOPMENTS

Design Submissions [NOC-BP]

Introduction

This document is being issued by Trakhees Sustainability department in the interest of the stakeholders so as to enable them to make a proper submission. Most importantly this document is to provide the stakeholders with a broad perspective of the type of evidence Trakhees Sustainability Department expects in the process of review of their submissions prior to approvals.

Scope

This general guideline is applicable to all the stakeholders involved in the Green building projects within Trakhees - PCFC / Dubai World business units

Aim

The aim of this document is to highlight the importance of supporting documentation and evidence in order to establish the fulfilment of a credit in the project. It is important that the project stakeholders comprising the client, Architectural & Engineering consultant, green building specialist(if involved in the project) and others together are able to demonstrate the compliance to the Regulation and its requirements in a clear and consistent manner. This entails supporting documentation comprising calculations, reports, photographs etc. depending on the nature of the credit

Sections

This guideline is given in the form of a several slides each representing a specific section of the regulation

Conclusion

This guideline provides a broad framework of the documentation involved in actual implementation of the green building principles and is intended purely to familiarize the client and the other stakeholders on the need to adequately demonstrate the compliance through several mechanisms. While this serves to throw light on the basic requirements, the stakeholders can exercise their option and judgment in including other forms of evidence that they feel are crucial in demonstrating the compliance

This document (Submission sample format ) has been prepared to serve as a guideline (assistance) for the consultants and contractors to prepare their submission packages to Trakhees. This should not be seen as an all inclusive requirement of Trakhees-Trakhees or as a set of instructions which if complied with would lead to automatic approval from the authority. It will be the sole responsibility of the consultant and the contractor to ascertain the actual requirements and expectations of the regulations and ensure that the submissions that they make to the authorities are complete with ALL the evidence deemed essential to demonstrate the compliance.

This guideline does not bind Trakhees in limiting its response to the elements of this document. Trakhees has the right to ask additional information / clarification / documentation that it may feel essential for demonstrating the compliance.

Should you need any assistance please do not hesitate to contact the department

GENERAL GUIDELINES
  1. Fill out the Submission Booklet
  2. Collate the evidence required as per the Regulation.
  3. Suggested formats / documentation as highlighted in this document
  4. Put together the submission package in a structured manner as illustrated
STRUCTURING THE GREEN BUILDING SUBMISSION PACKAGE

FORM GBF-11

EHS-GBP-05

SUBMISSION BOOKLET

APPLICABILITY

Regulation:GB 6. Green Building Regulations - Warehouses and Industrial Developments
Procedure:EHS-GBP-11 Procedure for NOC-BP Green Building Submission (Warehouse)

This booklet comprises the checklists for various elements of the green building regulations and is meant to be used by the stakeholders concerned for providing accurate information on the project. It comprises the following parts

Part-1Project Summary
Part-2Checklist for Green Building Submission

Disclaimer

This checklist has been developed for project teams to use when compiling the submission documentation for EHS Review / Assessment

A completed version of this checklist must be included within the Main Submission.

The accuracy and completeness of the submission is entirely the responsibility of the project team. EHS will not be held accountable for incorrect or incomplete submissions sent for assessment.

A. GENERAL REQUIREMENTS
A1
Integrated Design Approach for achieving energy savings
Minutes of Meeting – Date stamped Photo
3.0EHS Green Building Regulations
Minimize electricity consumption
  
3.1EHS Requirement for external envelope :
Compliance with Thermal Insulation System and Best Practices Energy conservation methods for BOTH Air-conditioned and Non Air-Conditioned buildings.
Solution for AC spaces:
External walls :
KC stated that there is several options for thermal
INFO
KC
DD Stage
Minutes of Meeting Copy

PCFC-TRK-CED-GB-G10

Rev. 01 / Dec' 2018

A2 Post Contract Green Briefing

) A formal letter from the client / developer confirming that a Green brief presentation would be a part of the Project Kick-off and the specific topics proposed to be discussed is attached to this submission.

Format ...Undertaking letter

Ports Costums and Free Zone Corporation Trakhees Green Building Section PO Box 17000 Dubai, United Arab Emirates

Sub: Undertaking letter for a green brief presentation as part of the Project Kick-off meeting for the Construction of

B. ENVELOPE & ENERGY

B1

Compliance with Thermal Insulation system & Best Practices Energy Conservation
Envelope U (thermal) Calculations and Sections
EXTERNAL WALL SECNO1
LAYER NOTHK. inDESCRIPTIONSDENSITY lb/ft³R °F ft².h/BtuMass lb/ft²
1.001.000Out side surface resistance0.0000.250 
442.023.4002 IN RHP (Roof APPLY.) Rigid Polyurethane Insulation Panel with Steel & Alu.facing Sandwich Panel (RH-4"Box Rib) Registered 20072.18821.3340.620

B1

Compliance with Thermal Insulation system & Best Practices Energy Consn
Envelope Sections - Wall
INSULATED BLOCK WALL DETAIL
Layer No.Thickness
mm
External WallMax. U = 0.57 W/m²KDensity
kg/m³
Resistance
m²K/W
Mass
kg/m³
2.000 Outside Surface Film Resistance for Walls 0.0000.0440.000
14.01035.00Sand Stone 2000.0000.028700.000
Envelope Sections - Roof
Layer No.Thickness
mm
RoofMax. U = 0.30 W/m²KDensity
kg/m³
Resistance
m²K/W
Mass
kg/m²
4.000 Outside Surface Film Resistance for Roofs 0.0000.0550.000
Glazing Details / Sections
 SCHEDULE OF WINDOWS & WALLS DATATSUH05
TOTAL GLASS OPENING AREAFT SQ.593.86
Glazing Details / Sections
Plot No/Area No :-SCHEDULE OF WINDOWS & WALLS DATAECU -2-
Project:- 
Wall Details

Outside Surface Color ... Dark

Absorptivity ... 0.900

Overall U-Value ... 0.069 BTU/(hr-ft²·°F)

HAP Input summary sheet

Wall Layers Details (Inside to Outside)

LayersThickness
in
Density
lb/ft³
Specific Ht.
BTU / (lb - °F)
R-Value
(hr-ft²·°F)/BTU
Weight
lb/ft²
Inside surface resistance0.0000.00.000.680000.0
Roof Details

Outside Surface Color ... Dark

Absorptivity ... 0.900

Overall U-Value ... 0.043 BTU/(hr-ft²·°F)

Roof Layers Details (Inside to Outside)

LayersThickness
in
Density
lb/ft³
Specific Ht.
BTU / (lb - °F)
R-Value
(hr-ft²·°F)/BTU
Weight
lb/ft²
Inside surface resistance0.0000.00.000.250000.0

PCFC-TRK-CED-GB-G10

Rev. 01 / Dec' 2018

HAP Input summary sheet

Window Details:

Detailed InputNo 
Height11.15ft

CW-1C

Window Details:

Detailed InputNo 
Height11.15ft

W-1

Window Details:

Detailed InputNo 
Height8.37ft
B2 Limiting / Reversing Thermal Bridges

Compliance Strategy:

Compliance Strategies

The following strategy has been considered in the design to minimize the thermal bridging.

  1. The continuity of polyurethane thermal insulation has been achieved between roof and wall to avoid thermal bridges in the roof and wall joint. Figure 1.a and 1.b shows cases for continuous and non-continuous insulation for Wall to ceiling.

Thermal Bridging Concept Report .. If available

Thermal Bridging Strategy

All the Non-Repeating Thermal Bridges (i.e. junctions of floor and roof with the external wall, and details around window and door openings) shall be reduced by designing all insulating building components to work in unison and by creating barrier to heat flow in building envelope. The insulation shall be reviewed in relation to its location within wall and roofs, its interface/connectivity with surrounding or penetration materials and connectivity within & between insulating components.

Following are the general strategies to be adopted at a minimum in order to achieve minimize thermal bridges:

  • All the gaps between ceiling and walls shall be sealed with either plaster, adhesive or flexible sealant.
  • All the gaps between walls and floor shall be sealed with either plaster, adhesive or flexible sealant.
  • All the penetrations through air barrier shall be sealed by using a flexible sealant.
  • All the penetrations around windows & door openings shall be sealed by using a flexible sealant.
  • Partially filled insulation shall be secured firmly against inner leaf of wall.
  • Provide full depth insulation between and over joists extending to inner edge of wall.
  • Cavities shall be kept clean of mortar snots and other debris during construction.
  • Provide a continuous air barrier of masonry inner leaf with wet-finish plaster alongside of internal wall, floor and ceilings. Apply flexible sealant to all interfaces between internal air barriers and window/door frames.

Drawings for acceptable construction details shall be prepared by the contractor and approval has to be taken from the consultant prior to proceed for the construction in relevance to the above requirements.

B3 Envelope Tightness (Prescriptive Based)
Letter of Undertaking

Subject: Undertaking letter for Thermal Imaging

We hereby undertake that a Thermal imaging for the Air-conditioned spaces will be carried out for the project. A method statement for the proposed works before and after the test will be submitted to EHS Green Building Department, upon appointment of the Thermal Imaging sub-contractor.

Method Statement – From Qualified Thermographer
Extract from Specification
2.7 Thermal Imaging

Contractor shall carryout thermal imaging for the building interior to identify the building defects caused by cracks, poor insulation or shoddy construction. Appropriate corrective actions should be taken by the contractor to fix the air leaks identified by the exercise. Contractor has to prepare detailed method statement prior to and after the test and get approval from consultant.

B4 Envelope Tightness (Performance Based)

THIS IS A VOLUNTARY CREDIT ...

Letter of Undertaking

Method Statement – From Qualified Thermographer

Extract from Specification

B5

Efficient sizing of HVAC system

HVAC

Heat Load Calculations

Office-1

  1. General Details:

Floor Area ... 82.9 ft² Avg. Ceiling Height ... 13.2 ft Building Weight ... 80.0 lb/ft²

1.1. OA Ventilation Requirements:

Space Usage ... User-Defined OA Requirement 1 ... 19.0 CFM OA Requirement 2 ... 0.0 CFM Space Usage Defaults ... ASHRAE Std 62.1-2004

  1. Internals:

2.1. Overhead Lighting:

Fixture Type ... Recessed (Unvented) Wattage ... 1.86 W/ft² Ballast Multiplier ... 1.25 Schedule ... Lighting

2.2. Task Lighting:

Wattage ... 0.00 W/ft² Schedule ... None

2.3. Electrical Equipment:

Wattage ... 0.0 Watts Schedule ... None

2.4. People:

Occupancy ... 2.0 People Activity Level ... Office Work Sensible ... 245.0 BTU/hr/person Latent ... 205.1 BTU/hr/person Schedule ... People

2.5. Miscellaneous Loads:

Sensible ... 0 BTU/hr Schedule ... None Latent ... 0 BTU/hr Schedule ... None

ROOF-G
Roof Details

Outside Surface Color ... Dark

Absorptivity ... 0.900

Overall U-Value ... 0.244 W/(m²·°K)

Roof Layers Details (Inside to Outside)

LayersThickness
mm
Density
kg/m³
Specific Ht.
kJ / (kg - °K)
R-Value
(m²·°K)/W
Weight
kg/m²
Inside surface resistance0.0000.00.000.120640.0
WALL-G
Wall Details

Outside Surface Color ... Dark

Absorptivity ... 0.900

Overall U-Value ... 0.272 W/(m²·°K)

Wall Layers Details (Inside to Outside)

LayersThickness
mm
Density
kg/m³
Specific Ht.
kJ / (kg - °K)
R-Value
(m²·°K)/W
Weight
kg/m²
Inside surface resistance0.0000.00.000.044030.0
B6 Central Air-conditioning Units with Energy Recovery Units (ERV)
Ventilation / Exhaust Air Calculations

CALCULATIONS OF OUTDOOR AIR VENTILATION RATES

Zone IdentificationStandard Case: ASHRAE Std 62.1 –2007 Verification Rate Procedure
SL NOZone (AHU's)Area (SQFT)Occupancy (Nos.)People Outdoor Air rate (cfm / person)People Outdoor Air Qty (cfm)Breathing Zone Outdoor Air Flow Vbz / (cfm)Table 6-2 Zone air distribution effectiveness*Zone Outdoor air flow Voz / (cfm)Table 6-3 System Ventilation Efficiency EvOutdoor Air intake Flow Vot/cfmOutdoor Air intake Flow ( Required ) Vot/cfm
BUILDING -1 A
GROUND FLOOR ZONE
B6 Central Air-conditioning Units with Energy Recovery Units (ERV)
Energy Recovery Table with Efficiency details
B7 Selection of Air-conditioning Units with HIGH Energy Efficiency Ratio (EER)
EQUIPMENT NO 100SUMMARY OF THERMAL LOAD CALCULATIONS
TYPE OF BUILDINGELECTRICAL LOAD DEMAND FOR A/C UNITS
TYPE OF A/C COOLED SYSTEMAIR COOLED
LOCATIONUNIT TYPEELECT. DB NO NAMEAREA FT²CALCULATEDFIRST SELECTIONCOOL
COOLING LOADCHECK FIGURESCOOLING LOADPOWER KwEERPUFCOOL
TMBHSMBHCFMBtu/HrCFM/FT²TMBHSMBHCFMin unitout unit
MESS HALLPACKAGED11480.00113.5077.602639.0076.691.78117.1094.604150.00 10.9510.691.12110110
PRAYER HALLPACKAGED1756.0046.0048.201176.0060.85 48.2038.601585.00 4.5410.621.1313.113.1

Selection of efficient sizing Air-Conditioning equipments to be done as per the Heat load calculations provided for the conditioned area and AC units should also meet the minimum Energy Efficient Ratio (EER) value as per ASHRAE 90.1-2007/EHS Annexure Table 3.

Submission Sample

B8

Energy Efficient Auxiliary Systems of HVAC – Blowers and Pumps

B9

Interior Lighting Levels

Lighting Drawing along with Notes / Legend

The Legend should clearly indicate the Watts of the luminaire

LEGEND

SYMBOLDESCRIPTIONMOUNTING HEIGHT (mm)
DBDISTRIBUTION BOARD2000 (TOP)
SMDBSUB MAIN DISTRIBUTION BOARD- DO -
B9 Interior Lighting Levels
LPD Calculation and Reduction Chart
OCK
Sl No.ZoneArea sqftAs DesignedASHRAE RequirementsEHS Requirements
WattsLPDLPDWattsLPDWatts
1Below Mezzanine2414.9910080.421.12656.490.81,931.99
2Upholstry772.856720.870.9695.570.5386.43
MEZZANINE FLOOR OFFICE BLOCK
Sl No.ZoneArea sqftWattsLPDLPDWattsLPDWatts
1Curtain Upholstry1351.36720.500.91216.170.7945.91
2Office516.673360.651.1568.340.5258.34
Total Wattage6,25411,2317,783
Total Percentage of Savings compared to ASHRAE44.31%
Total Percentage of Savings compared to EHS19.64%
Notes
  1. The light power densities indicated above are improvements over those levels mentioned in ASHRAE 90.1-2007.
  2. Submissions should comprise LPD tables for the project comprising the proposed values in relation to Trakhees specified values for different areas
B9 Interior Lighting Levels
LPD Calculation and Reduction Chart
Interior Lighting Levels
Sl.No.Room NameArea (m2)EHS recommended LPD (W/sq.ft)As per Actual design LPD (W/sq.ft)As per actual design LPD (W/m2)Achieved WattsEHS Watts
Ground floor
1Spare-1130.81.0010.8140110.97
B9 Interior Lighting Levels
LPD Calculation and Reduction Chart
Interior Lighting Levels
Sl.No.Room NameArea (m2)EHS recommended LPD (W/sq.ft)As per Actual design LPD (W/sq.ft)As per actual design LPD (W/m2)Achieved WattsEHS Watts
First floor (Contd.)
9Finance Manager130.81.0010.8140110.97

B10

Exterior Lighting Levels

LPD Calculation and Reduction Chart

Lighting Drawing along with Notes / Legend

The Legend should clearly indicate the Watts of the luminaire

B10

Exterior Lighting Levels

LPD Calculation and Reduction Chart

Proposed Watts Consumption

Fixture Typeno.of lightsTotal Watts
250 Watts Flood Lights205000
100 Watts bulk head light111100

Baseline Watts Consumption

Fixture TypeArea / Linear footAllowable Lighting PowerTotal Watts
Façade Lighting40292 sq.ft0.2 W/sq.ft8058.4
Other doors (building entrance and exits)3.28 lineat foot of door width * 16 nos.20 W/linear foot577.28
% Reduction29.4%

B10

Exterior Lighting Levels
LPD Calculation and Reduction Chart
ASHRAEPROPOSED DESIGN
 Area (sqft.)ASHRAE LPD (w/sqft)Total wattsProposed reduction (w/sqft)
Less 20%
Proposed LPD (w/sqft) / WATTSFixture Power WattsTotal FixturesTotal Power WattsLPD Value w/sfActual LPD ReductionCompliance Yes/No
TRADABLE SURFACES
Uncovered Parking Areas (hardscape)

B10

Exterior Lighting Levels

LPD Calculation and Reduction Chart

S. NOROOM NAMEAREA IN SQ.MTAREA IN SQ.FT.TYPE OF FIXTUREBALLAST TYPELAMP WATTAGETOTAL WATTAGEQTYPROPOSED CASEBASE CASE
TOTAL LOAD WATTSTOTAL WATTS /SQ.FTAS PER EHS W/SQ.FTTOTAL WATTSAS PER ASHRAE W/SQ.FTTOTAL WATTS
1OPEN SHED3400.0036597.60TYPE GELECTRONIC1X250W250358750.000.240.414639.040.932937.84
2MESS HALL34.00365.98TYPE AELECTRONIC4X14W564224.000.610.7256.180.9329.38

Submission Sample

NOTES (FOR GREEN BUILDING)

1,- ENERGY SAVING HIGH PERFORMANCE LAMPS SUCH AS CFL, DIMMER TYPE HALOGEN LAMPS, LINEAR / CIRCULAR HUORESCENT LAMPS, HIGH PRESSURE SODIUM & METAL HALIDE LAMPS ARE USED. 2,- ELECTRONIC BALLAST USED. 3,- SWITCHING LIGHTING DEVICES BY USING SWITCHES, MOTION CONTROL DEVICES, OCCUPANCY SENSORS, TIMER / DIMMER CONTROL DEVICES, ETC.

Notes in Electrical Drawing

B11

Use of Renewable Sources of Energy for domestic heating

Extract from Specification

SOLAR WATER HEATER

Solar collectors are used to absorb energy from the sun, supplying heat to Fluid circulated through them. The collectors are typically installed on the roof of the facility in which the system is used.

A pump is used to circulate closed circuit fluid between the Heat Store storage tank and the solar collectors. This solar circulation pump is controlled by an intelligent differential controller with optional data logging capability. This differential controller measures the temperature in the solar collector array and the storage tank. When the solar collector array temperature is sufficiently higher than the storage tank temperature, the differential controller...