(Warehouse Design Submission NOC-BP)
| PCFC- Entity (Business Unit) Name | : | Trakhees (Dept. of Planning & Development) |
| Department Name | : | Civil Engineering Department (CED) |
REGULATION
SUBMISSION PHASE
WAREHOUSE & INDUSTRIAL DEVELOPMENTS
Design Submissions [NOC-BP]
This document is being issued by Trakhees Sustainability department in the interest of the stakeholders so as to enable them to make a proper submission. Most importantly this document is to provide the stakeholders with a broad perspective of the type of evidence Trakhees Sustainability Department expects in the process of review of their submissions prior to approvals.
This general guideline is applicable to all the stakeholders involved in the Green building projects within Trakhees - PCFC / Dubai World business units
The aim of this document is to highlight the importance of supporting documentation and evidence in order to establish the fulfilment of a credit in the project. It is important that the project stakeholders comprising the client, Architectural & Engineering consultant, green building specialist(if involved in the project) and others together are able to demonstrate the compliance to the Regulation and its requirements in a clear and consistent manner. This entails supporting documentation comprising calculations, reports, photographs etc. depending on the nature of the credit
This guideline is given in the form of a several slides each representing a specific section of the regulation
This guideline provides a broad framework of the documentation involved in actual implementation of the green building principles and is intended purely to familiarize the client and the other stakeholders on the need to adequately demonstrate the compliance through several mechanisms. While this serves to throw light on the basic requirements, the stakeholders can exercise their option and judgment in including other forms of evidence that they feel are crucial in demonstrating the compliance
This document (Submission sample format ) has been prepared to serve as a guideline (assistance) for the consultants and contractors to prepare their submission packages to Trakhees. This should not be seen as an all inclusive requirement of Trakhees-Trakhees or as a set of instructions which if complied with would lead to automatic approval from the authority. It will be the sole responsibility of the consultant and the contractor to ascertain the actual requirements and expectations of the regulations and ensure that the submissions that they make to the authorities are complete with ALL the evidence deemed essential to demonstrate the compliance.
This guideline does not bind Trakhees in limiting its response to the elements of this document. Trakhees has the right to ask additional information / clarification / documentation that it may feel essential for demonstrating the compliance.
Should you need any assistance please do not hesitate to contact the department
FORM GBF-11
EHS-GBP-05
APPLICABILITY
| Regulation | : | GB 6. Green Building Regulations - Warehouses and Industrial Developments |
| Procedure | : | EHS-GBP-11 Procedure for NOC-BP Green Building Submission (Warehouse) |
This booklet comprises the checklists for various elements of the green building regulations and is meant to be used by the stakeholders concerned for providing accurate information on the project. It comprises the following parts
| Part-1 | Project Summary |
| Part-2 | Checklist for Green Building Submission |
Disclaimer
This checklist has been developed for project teams to use when compiling the submission documentation for EHS Review / Assessment
A completed version of this checklist must be included within the Main Submission.
The accuracy and completeness of the submission is entirely the responsibility of the project team. EHS will not be held accountable for incorrect or incomplete submissions sent for assessment.
| 3.0 | EHS Green Building Regulations Minimize electricity consumption | ||
| 3.1 | EHS Requirement for external envelope : Compliance with Thermal Insulation System and Best Practices Energy conservation methods for BOTH Air-conditioned and Non Air-Conditioned buildings. Solution for AC spaces: External walls : KC stated that there is several options for thermal | INFO KC | DD Stage |
PCFC-TRK-CED-GB-G10
Rev. 01 / Dec' 2018
) A formal letter from the client / developer confirming that a Green brief presentation would be a part of the Project Kick-off and the specific topics proposed to be discussed is attached to this submission.
Ports Costums and Free Zone Corporation Trakhees Green Building Section PO Box 17000 Dubai, United Arab Emirates
Sub: Undertaking letter for a green brief presentation as part of the Project Kick-off meeting for the Construction of
B1
| EXTERNAL WALL SEC | NO | 1 | |||
|---|---|---|---|---|---|
| LAYER NO | THK. in | DESCRIPTIONS | DENSITY lb/ft³ | R °F ft².h/Btu | Mass lb/ft² |
| 1.00 | 1.000 | Out side surface resistance | 0.000 | 0.250 | |
| 442.02 | 3.400 | 2 IN RHP (Roof APPLY.) Rigid Polyurethane Insulation Panel with Steel & Alu.facing Sandwich Panel (RH-4"Box Rib) Registered 2007 | 2.188 | 21.334 | 0.620 |
B1
| Layer No. | Thickness mm | External Wall | Max. U = 0.57 W/m²K | Density kg/m³ | Resistance m²K/W | Mass kg/m³ |
|---|---|---|---|---|---|---|
| 2.000 | Outside Surface Film Resistance for Walls | 0.000 | 0.044 | 0.000 | ||
| 14.010 | 35.00 | Sand Stone | 2000.000 | 0.028 | 700.000 |
| Layer No. | Thickness mm | Roof | Max. U = 0.30 W/m²K | Density kg/m³ | Resistance m²K/W | Mass kg/m² |
|---|---|---|---|---|---|---|
| 4.000 | Outside Surface Film Resistance for Roofs | 0.000 | 0.055 | 0.000 |
| SCHEDULE OF WINDOWS & WALLS DATA | TSUH05 | ||||||||||
| TOTAL GLASS OPENING AREA | FT SQ. | 593.86 | |||||||||
| Plot No/Area No :- | SCHEDULE OF WINDOWS & WALLS DATA | ECU -2- | |||||||||
| Project:- | |||||||||||
Outside Surface Color ... Dark
Absorptivity ... 0.900
Overall U-Value ... 0.069 BTU/(hr-ft²·°F)
HAP Input summary sheet
Wall Layers Details (Inside to Outside)
| Layers | Thickness in | Density lb/ft³ | Specific Ht. BTU / (lb - °F) | R-Value (hr-ft²·°F)/BTU | Weight lb/ft² |
|---|---|---|---|---|---|
| Inside surface resistance | 0.000 | 0.0 | 0.00 | 0.68000 | 0.0 |
Outside Surface Color ... Dark
Absorptivity ... 0.900
Overall U-Value ... 0.043 BTU/(hr-ft²·°F)
Roof Layers Details (Inside to Outside)
| Layers | Thickness in | Density lb/ft³ | Specific Ht. BTU / (lb - °F) | R-Value (hr-ft²·°F)/BTU | Weight lb/ft² |
|---|---|---|---|---|---|
| Inside surface resistance | 0.000 | 0.0 | 0.00 | 0.25000 | 0.0 |
PCFC-TRK-CED-GB-G10
Rev. 01 / Dec' 2018
Window Details:
| Detailed Input | No | |
| Height | 11.15 | ft |
CW-1C
Window Details:
| Detailed Input | No | |
| Height | 11.15 | ft |
W-1
Window Details:
| Detailed Input | No | |
| Height | 8.37 | ft |
Compliance Strategy:
Compliance Strategies
The following strategy has been considered in the design to minimize the thermal bridging.
Thermal Bridging Concept Report .. If available
All the Non-Repeating Thermal Bridges (i.e. junctions of floor and roof with the external wall, and details around window and door openings) shall be reduced by designing all insulating building components to work in unison and by creating barrier to heat flow in building envelope. The insulation shall be reviewed in relation to its location within wall and roofs, its interface/connectivity with surrounding or penetration materials and connectivity within & between insulating components.
Following are the general strategies to be adopted at a minimum in order to achieve minimize thermal bridges:
Drawings for acceptable construction details shall be prepared by the contractor and approval has to be taken from the consultant prior to proceed for the construction in relevance to the above requirements.
Subject: Undertaking letter for Thermal Imaging
We hereby undertake that a Thermal imaging for the Air-conditioned spaces will be carried out for the project. A method statement for the proposed works before and after the test will be submitted to EHS Green Building Department, upon appointment of the Thermal Imaging sub-contractor.
Contractor shall carryout thermal imaging for the building interior to identify the building defects caused by cracks, poor insulation or shoddy construction. Appropriate corrective actions should be taken by the contractor to fix the air leaks identified by the exercise. Contractor has to prepare detailed method statement prior to and after the test and get approval from consultant.
B4 Envelope Tightness (Performance Based)
THIS IS A VOLUNTARY CREDIT ...
Letter of Undertaking
Method Statement – From Qualified Thermographer
Extract from Specification
B5
Efficient sizing of HVAC system
HVAC
Heat Load Calculations
Office-1
Floor Area ... 82.9 ft² Avg. Ceiling Height ... 13.2 ft Building Weight ... 80.0 lb/ft²
1.1. OA Ventilation Requirements:
Space Usage ... User-Defined OA Requirement 1 ... 19.0 CFM OA Requirement 2 ... 0.0 CFM Space Usage Defaults ... ASHRAE Std 62.1-2004
2.1. Overhead Lighting:
Fixture Type ... Recessed (Unvented) Wattage ... 1.86 W/ft² Ballast Multiplier ... 1.25 Schedule ... Lighting
2.2. Task Lighting:
Wattage ... 0.00 W/ft² Schedule ... None
2.3. Electrical Equipment:
Wattage ... 0.0 Watts Schedule ... None
2.4. People:
Occupancy ... 2.0 People Activity Level ... Office Work Sensible ... 245.0 BTU/hr/person Latent ... 205.1 BTU/hr/person Schedule ... People
2.5. Miscellaneous Loads:
Sensible ... 0 BTU/hr Schedule ... None Latent ... 0 BTU/hr Schedule ... None
Outside Surface Color ... Dark
Absorptivity ... 0.900
Overall U-Value ... 0.244 W/(m²·°K)
Roof Layers Details (Inside to Outside)
| Layers | Thickness mm | Density kg/m³ | Specific Ht. kJ / (kg - °K) | R-Value (m²·°K)/W | Weight kg/m² |
|---|---|---|---|---|---|
| Inside surface resistance | 0.000 | 0.0 | 0.00 | 0.12064 | 0.0 |
Outside Surface Color ... Dark
Absorptivity ... 0.900
Overall U-Value ... 0.272 W/(m²·°K)
Wall Layers Details (Inside to Outside)
| Layers | Thickness mm | Density kg/m³ | Specific Ht. kJ / (kg - °K) | R-Value (m²·°K)/W | Weight kg/m² |
|---|---|---|---|---|---|
| Inside surface resistance | 0.000 | 0.0 | 0.00 | 0.04403 | 0.0 |
CALCULATIONS OF OUTDOOR AIR VENTILATION RATES
| Zone Identification | Standard Case: ASHRAE Std 62.1 –2007 Verification Rate Procedure | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| SL NO | Zone (AHU's) | Area (SQFT) | Occupancy (Nos.) | People Outdoor Air rate (cfm / person) | People Outdoor Air Qty (cfm) | Breathing Zone Outdoor Air Flow Vbz / (cfm) | Table 6-2 Zone air distribution effectiveness* | Zone Outdoor air flow Voz / (cfm) | Table 6-3 System Ventilation Efficiency Ev | Outdoor Air intake Flow Vot/cfm | Outdoor Air intake Flow ( Required ) Vot/cfm |
| BUILDING -1 A | |||||||||||
| GROUND FLOOR ZONE | |||||||||||
| EQUIPMENT NO 100 | SUMMARY OF THERMAL LOAD CALCULATIONS | ||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| TYPE OF BUILDING | ELECTRICAL LOAD DEMAND FOR A/C UNITS | ||||||||||||||||
| TYPE OF A/C COOLED SYSTEM | AIR COOLED | ||||||||||||||||
| LOCATION | UNIT TYPE | ELECT. DB NO NAME | AREA FT² | CALCULATED | FIRST SELECTION | COOL | |||||||||||
| COOLING LOAD | CHECK FIGURES | COOLING LOAD | POWER Kw | EER | PUF | COOL | |||||||||||
| TMBH | SMBH | CFM | Btu/Hr | CFM/FT² | TMBH | SMBH | CFM | in unit | out unit | ||||||||
| MESS HALL | PACKAGED | 1 | 1480.00 | 113.50 | 77.60 | 2639.00 | 76.69 | 1.78 | 117.10 | 94.60 | 4150.00 | 10.95 | 10.69 | 1.12 | 110 | 110 | |
| PRAYER HALL | PACKAGED | 1 | 756.00 | 46.00 | 48.20 | 1176.00 | 60.85 | 48.20 | 38.60 | 1585.00 | 4.54 | 10.62 | 1.13 | 13.1 | 13.1 | ||
Selection of efficient sizing Air-Conditioning equipments to be done as per the Heat load calculations provided for the conditioned area and AC units should also meet the minimum Energy Efficient Ratio (EER) value as per ASHRAE 90.1-2007/EHS Annexure Table 3.
Submission Sample
B8
B9
Interior Lighting Levels
Lighting Drawing along with Notes / Legend
The Legend should clearly indicate the Watts of the luminaire
LEGEND
| SYMBOL | DESCRIPTION | MOUNTING HEIGHT (mm) |
|---|---|---|
| DB | DISTRIBUTION BOARD | 2000 (TOP) |
| SMDB | SUB MAIN DISTRIBUTION BOARD | - DO - |
| Sl No. | Zone | Area sqft | As Designed | ASHRAE Requirements | EHS Requirements | |||
|---|---|---|---|---|---|---|---|---|
| Watts | LPD | LPD | Watts | LPD | Watts | |||
| 1 | Below Mezzanine | 2414.99 | 1008 | 0.42 | 1.1 | 2656.49 | 0.8 | 1,931.99 |
| 2 | Upholstry | 772.85 | 672 | 0.87 | 0.9 | 695.57 | 0.5 | 386.43 |
| Sl No. | Zone | Area sqft | Watts | LPD | LPD | Watts | LPD | Watts |
|---|---|---|---|---|---|---|---|---|
| 1 | Curtain Upholstry | 1351.3 | 672 | 0.50 | 0.9 | 1216.17 | 0.7 | 945.91 |
| 2 | Office | 516.67 | 336 | 0.65 | 1.1 | 568.34 | 0.5 | 258.34 |
| Total Wattage | 6,254 | 11,231 | 7,783 |
| Total Percentage of Savings compared to ASHRAE | 44.31% |
| Total Percentage of Savings compared to EHS | 19.64% |
| Interior Lighting Levels | |||||||
|---|---|---|---|---|---|---|---|
| Sl.No. | Room Name | Area (m2) | EHS recommended LPD (W/sq.ft) | As per Actual design LPD (W/sq.ft) | As per actual design LPD (W/m2) | Achieved Watts | EHS Watts |
| Ground floor | |||||||
| 1 | Spare-1 | 13 | 0.8 | 1.00 | 10.8 | 140 | 110.97 |
| Interior Lighting Levels | |||||||
|---|---|---|---|---|---|---|---|
| Sl.No. | Room Name | Area (m2) | EHS recommended LPD (W/sq.ft) | As per Actual design LPD (W/sq.ft) | As per actual design LPD (W/m2) | Achieved Watts | EHS Watts |
| First floor (Contd.) | |||||||
| 9 | Finance Manager | 13 | 0.8 | 1.00 | 10.8 | 140 | 110.97 |
B10
Exterior Lighting Levels
LPD Calculation and Reduction Chart
Lighting Drawing along with Notes / Legend
The Legend should clearly indicate the Watts of the luminaire
B10
Exterior Lighting Levels
LPD Calculation and Reduction Chart
Proposed Watts Consumption
| Fixture Type | no.of lights | Total Watts |
|---|---|---|
| 250 Watts Flood Lights | 20 | 5000 |
| 100 Watts bulk head light | 11 | 1100 |
Baseline Watts Consumption
| Fixture Type | Area / Linear foot | Allowable Lighting Power | Total Watts |
|---|---|---|---|
| Façade Lighting | 40292 sq.ft | 0.2 W/sq.ft | 8058.4 |
| Other doors (building entrance and exits) | 3.28 lineat foot of door width * 16 nos. | 20 W/linear foot | 577.28 |
| % Reduction | 29.4% |
B10
| ASHRAE | PROPOSED DESIGN | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Area (sqft.) | ASHRAE LPD (w/sqft) | Total watts | Proposed reduction (w/sqft) Less 20% | Proposed LPD (w/sqft) / WATTS | Fixture Power Watts | Total Fixtures | Total Power Watts | LPD Value w/sf | Actual LPD Reduction | Compliance Yes/No | |
| TRADABLE SURFACES | |||||||||||
| Uncovered Parking Areas (hardscape) | |||||||||||
B10
Exterior Lighting Levels
LPD Calculation and Reduction Chart
| S. NO | ROOM NAME | AREA IN SQ.MT | AREA IN SQ.FT. | TYPE OF FIXTURE | BALLAST TYPE | LAMP WATTAGE | TOTAL WATTAGE | QTY | PROPOSED CASE | BASE CASE | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| TOTAL LOAD WATTS | TOTAL WATTS /SQ.FT | AS PER EHS W/SQ.FT | TOTAL WATTS | AS PER ASHRAE W/SQ.FT | TOTAL WATTS | |||||||||
| 1 | OPEN SHED | 3400.00 | 36597.60 | TYPE G | ELECTRONIC | 1X250W | 250 | 35 | 8750.00 | 0.24 | 0.4 | 14639.04 | 0.9 | 32937.84 |
| 2 | MESS HALL | 34.00 | 365.98 | TYPE A | ELECTRONIC | 4X14W | 56 | 4 | 224.00 | 0.61 | 0.7 | 256.18 | 0.9 | 329.38 |
Submission Sample
NOTES (FOR GREEN BUILDING)
1,- ENERGY SAVING HIGH PERFORMANCE LAMPS SUCH AS CFL, DIMMER TYPE HALOGEN LAMPS, LINEAR / CIRCULAR HUORESCENT LAMPS, HIGH PRESSURE SODIUM & METAL HALIDE LAMPS ARE USED. 2,- ELECTRONIC BALLAST USED. 3,- SWITCHING LIGHTING DEVICES BY USING SWITCHES, MOTION CONTROL DEVICES, OCCUPANCY SENSORS, TIMER / DIMMER CONTROL DEVICES, ETC.
Notes in Electrical Drawing
B11
Extract from Specification
SOLAR WATER HEATER
Solar collectors are used to absorb energy from the sun, supplying heat to Fluid circulated through them. The collectors are typically installed on the roof of the facility in which the system is used.
A pump is used to circulate closed circuit fluid between the Heat Store storage tank and the solar collectors. This solar circulation pump is controlled by an intelligent differential controller with optional data logging capability. This differential controller measures the temperature in the solar collector array and the storage tank. When the solar collector array temperature is sufficiently higher than the storage tank temperature, the differential controller...