| PCFC- Entity (Business Unit) Name | : | Trakhees – Ports, Customs & Free Zone Corporation |
| Department Name | : | Civil Engineering Department (CED) |
(Villas & Residential areas up to 3 habitable floors)
| Item | DESCRIPTION | TYPE | AIM / INTENT | REQUIREMENT / CRITERIA | COMPLIANCE REQUIREMENTS | EVIDENCE REQUIRED AT DESIGN STAGE NOC-BP | EVIDENCE REQUIRED AT POST-CONSTRUCTION STAGE NOC-BCC |
|---|---|---|---|---|---|---|---|
| A: GENERAL REQUIREMENTS | |||||||
| 1 | Integrated Design Approach for achieving energy savings | MANDATORY | To encourage a collaborative and integrative process for designing, constructing and operating the Villa building. | Where evidence demonstrates that ALL the key stakeholders comprising ALL of but not limited to developer / client, designers contractors and suppliers have effectively participated in the design process. | KEY stakeholders comprising all of but not limited to designers and builders should be part of integrated design development process wherein important aspects are deliberated. The process should include discussions on envelope, HVAC options, lighting schemes, innovative day lighting technologies, renewable technologies, commissioning, ease of operations & maintenance etc. as applicable for the project. | 1.Minutes of meeting of the integrated design process. 2.Date stamped photograph. 3.A briefing note on what has been accomplished. | NONE. |
(Villas & Residential areas up to 3 habitable floors)
| Item | DESCRIPTION | TYPE | AIM / INTENT | REQUIREMENT / CRITERIA | COMPLIANCE REQUIREMENTS | EVIDENCE REQUIRED AT DESIGN STAGE NOC-BP | EVIDENCE REQUIRED AT POST-CONSTRUCTION STAGE NOC-BCC |
|---|---|---|---|---|---|---|---|
| 2 | Post Contract Green Briefing. Sustainability Kick-off ( During commencement of construction ) | MANDATORY | To seek full support, cooperation and commitment from the stakeholders during the construction phase of the project. | Where evidence provided demonstrates that a program is in place to ensure commitment from all stakeholders for site level compliance of green building design.. The scope and the deliverables of KEY stakeholders from the point of view of "Green Building Regulatory Compliance" is discussed and conveyed during this Kick Off meeting. | A project specific green building presentation should be made to all the stakeholders. The presentation has to be a part of the agenda during formal "Project Kick-off" meeting. The key stakeholders should comprise ALL of but not restricted to Civil and MEP contractors, project architect and consultants, client representative and product and technology suppliers. | 1.Extract of the tender documents / specification confirming the requirement of a project specific green building presentation during the project kick-off meeting. 2.A formal letter from the client / developer confirming that a Green brief presentation would be a part of the Project Kick-off.- | 1.Copy of the Green building presentation / briefing made during the project kick-off to specifically address the green design and to assign roles various stakeholders. 2.Minutes of Meeting (MOM) to confirm attendance. 3.Date stamped photograph. |
(Villas & Residential areas up to 3 habitable floors)
| Item | DESCRIPTION | TYPE | AIM / INTENT | REQUIREMENT / CRITERIA | COMPLIANCE REQUIREMENTS | EVIDENCE REQUIRED AT DESIGN STAGE NOC-BP | EVIDENCE REQUIRED AT POST-CONSTRUCTION STAGE NOC-BCC |
|---|---|---|---|---|---|---|---|
| B: ENVELOPE & ENERGY | |||||||
| 1 | Compliance with Thermal Insulation System and Best Practices Energy conservation methods [For both Air-conditioned and Non Air-Conditioned buildings.] | MANDATORY | To reduce/control the solar heat gain through windows. To reduce conductive heat gain through opaque elements into the occupied space To encourage villa developments to achieve increased levels of performance. Sound design principles focusing on the insulation minimizes the environmental impact and thereby CO2 emissions associated with their operational energy consumption. Excessive heat gain increases the temperature within the space causing discomfort to the occupants. It also Increases the capacity of the HVAC equipment required to cater to this additional heat load being added to the space. Alongside, equipment sized higher consumes greater energy during their operations and may require greater maintenance. | Where evidence provided demonstrates an improvement in the energy efficiency of the building's fabric and services and therefore achieves lower building operational related CO2 emissions. The envelope addresses the following 1) Roofs 2) Walls 3) Slab 4) Door 5) Vertical Glazing 6) Skylight | All Villas should be designed to achieve the environmental parameters (U-values, Solar heat gain coefficients, etc.) for various components of the building Fabric/ Envelope as mentioned in Table-1 of the Annexure that is part of the Regulation. | 1. Specification documents stating types of glazing, roof and wall insulation. 2. Calculations demonstrating average U-values and other thermal characteristics specified for the project. 3. Typical sections of the envelope for both conditioned and non-conditioned spaces. 4. These Envelope values must be used in the heat load estimation and sizing of the AC Equipment. Accordingly the heat load estimate should demonstrate these inputs. 5. The Envelope details MUST be confirmed by filling the envelope commitment sheet of part of the GBF-09 submission booklet. | 1. As-Built envelope details i.e. glazing, roof and wall to confirm compliance to design values. These must be reflected in the submission booklet 2. Contractor's material data sheets for the envelope elements. 3. Date stamped photographic evidence as applicable. NOTE: For specific situations, the compliance to these specific requirements may be required to be physically verified during the final check. |
(Villas & Residential areas up to 3 habitable floors)
| Item | DESCRIPTION | TYPE | AIM / INTENT | REQUIREMENT / CRITERIA | COMPLIANCE REQUIREMENTS | EVIDENCE REQUIRED AT DESIGN STAGE NOC-BP | EVIDENCE REQUIRED AT POST-CONSTRUCTION STAGE NOC-BCC |
|---|---|---|---|---|---|---|---|
| 2 | Limiting / Reversing Thermal Bridges [Continuous Insulation / Associated Strategies] | MANDATORY | To minimize the thermal bridges and maximize the Insulations' effectiveness between the enclosed space (Interior) and external (ambient) space through careful design and good construction practices. Heat flow through conductive components in an otherwise well-insulated assembly, results in disproportionately significant heat gain into the space. Thermal Bridges in a building can be expensive and cost prohibitive besides causing excessive heat gain and in some cases condensation as well. | Where evidence provided demonstrates that continuity of the thermal insulation is achieved to the practical extent possible Where thermal bridges do occur, care should be taken to minimize their effects right at the design stage through proper design review. | All Insulating building components must be designed and installed to work in unison and create a continuous barrier to heat flow in the building envelope. The insulation should be reviewed in relation to • Its location within the walls and Roofs • Its interface / connectivity with surrounding or penetration materials • Connectivity within and between insulating components. | 1. Statement on strategies adopted to reduce Thermal bridging. 2. Supporting documents such as drawings / extract of specifications to demonstrate such strategy. | 1. As Built drawings showing the strategies followed on site for limiting the thermal bridging. 2. Date stamped site photographs where relevant. |
(Villas & Residential areas up to 3 habitable floors)
| 3 | Envelope Tightness (Prescriptive based) THERMAL IMAGING TECHNIQUE [Only for Air Conditioned Spaces] | MANDATORY | To discover defects in the Building Envelope and rectify them on time prior to operations so as to avoid loss of precious energy through leakages in the envelope (flow of air through gaps and cracks in the fabric of a building). To eliminate the air leakage paths through the fabric except through intentional openings. To ascertain if there are any inadequacies hidden in and around walls, ceilings, windows, doors and air ducts of the development as these are potential areas for wastage of energy and raising the energy costs of the proposed facility. Thermal Imaging This principle is used to ascertain the continuity of the insulation in accordance with the construction drawing and to identify patterns of heat loss from the property that are invisible to the naked eye. It is conducted by a qualified thermographer using infrared cameras which is able to determine the pattern of heat loss through the fabric of the building and HVAC systems. | Where evidence provided demonstrates that the project has 1. Carried out interior Thermal Imaging for the Air-Conditioned / climate controlled spaces to identify the building defects caused by cracks, poor insulation or shoddy construction. 2. Used the results of the above Thermal Imaging exercise to improve the energy efficiency of the facility by appropriate corrective actions to locate and fix the leaks and gaps identified. 3. The tests and the reports should comply with specific conditions. Details as per Table-2 of Annexure | 1. The envelope tightness should be ascertained by thermal imaging being carried out by a qualified thermographer. 2. The thermography report should highlight the leakage spots noticed in the space and provide recommendations for rectifications 3. The defects in the building envelope as detected and reported by the thermographer should be rectified. 4. Note The types of issues that are usually found are improperly insulated access panels, air leaks at room corners and around windows and door frames, missing or compacted wall insulation, air infiltration at lighting fixtures and a host of other energy-wasting defects | 1. Extract from the specification highlighting this requirement. 2. Specification documents stating the strategy proposed to be deployed for checking the tightness of the envelope and the description of the system. 3. Detailed Method statement for the proposed works before and after the test. | 1. Report of the thermography test undertaken clearly tabulating the identified inconsistencies / leakage areas in the envelope. 2. Report of corrective actions undertaken to rectify the defects. Thermal image should be provided to demonstrate compliance (before and after rectification). 3. Copy of the contract with the specialist, providing a definitive time frame for completing all the sub elements. It also becomes legally binding on their part to submit the report on or before the committed date 4. Date stamped photographs |
(Villas & Residential areas up to 3 habitable floors)
| 4 | Envelope Tightness (Performance based) BLOWER DOOR TEST TECHNIQUE | VOLUMETARY | To discover defects in the Building Envelope and rectify them on time prior to operations so as to avoid loss of precious energy through leakages in the envelope (flow of air through gaps and cracks in the fabric of a building) To ascertain if there are any inadequacies hidden in and around walls, ceilings, windows, doors and air ducts of the development as these are potential areas for wastage of energy and rising energy costs of the proposed facility. Subjecting the development to blower door testing which is a diagnostic tool to measure how much infiltration is occurring in the built facility. | Where evidence provided demonstrates that the building / facility 1. has installed an airtight envelope; 2. has taken the measures to identify the defects / leakages in the envelope by subjecting it to door blower test 3. The air leakage is contained within maximum of 10m3/hr /m2 @ 50 Pascal. 4. Details as per Table-2 | The principal contractor accounts for the door blower test within the programme of works and this comprises at a minimum the following tasks: 1. Setting up the blower door. 2. Preparing the building for the Pre blower door test. 3. Performing the blower door test. 4. Recording the results on performance testing form 5. Reporting the result to the contractor. These test need to be conducted with the use of a blower door to measure the amount of leakage of an object (thereby ascertaining the envelope tightness) which can in turn be extended with the use of techniques such as thermography and smoke simulations to locate any excessive leakages. | 1. Specification documents stating the strategy proposed to be deployed for checking the tightness of the envelope, the description of the system and the numerical values proposed to be met. 2. Detailed method statement by the appointed specialist 3. Copy of the contract / purchase order to support the appointment of the specialist for the subject work | 1. Test Report demonstrating compliance / corrective actions undertaken to seal the envelope. The report should include all of but not limited to the following a. Executive summary of the air tightness test b. Test objective c. Test Methodology d. Test details e. Formal test Report – Positive pressurisation test f. Test Envelope description and Fan diagram g. Date stamped Photographs as evidence. 2. Copy of the contract with the specialist, providing a definitive time frame for completing all the sub elements. It also becomes legally binding on their part to submit the report on or before the committed date. |
(Villas & Residential areas up to 3 habitable floors)
| Item | DESCRIPTION | TYPE | AIM / INTENT | REQUIREMENT / CRITERIA | COMPLIANCE REQUIREMENTS | EVIDENCE REQUIRED AT DESIGN STAGE NOC-BP | EVIDENCE REQUIRED AT POST-CONSTRUCTION STAGE NOC-BCC |
|---|---|---|---|---|---|---|---|
| 5 | Efficient SIZING of the HVAC systems | MANDATORY | To encourage optimum use of resources by an Engineering approach to sizing and selection of HVAC equipment and systems. To Reduce Cooling loads and Energy use of the facility. | Where evidence provided demonstrates that the equipment and systems have been selected after carrying out proper engineering calculation in line with the internationally accepted practices. | Heat load calculations should be carried out for all the conditioned areas of the building and the results of these calculations should be used as the basis for selecting the Air-conditioning equipment. Where heat recovery units are being used, a proper ventilation calculations should be carried out (areas such as kitchen, toilet etc. requiring ventilation) and the results of such calculations should be used for sizing the fresh air systems, exhaust systems and Energy Recovery Units etc. | 1. Heat load calculations for conditioned area incorporating the right envelope thermal characteristics ( as confirmed in point 1) 2. Fresh air / ventilation calculation. 3. Schedule of equipment with the capacities 4. Confirmation of air balance for energy recovery system | 1. Technical submittals / material data sheets for the installed equipment. 2. Date stamped photograph. |
| 6 | Central air conditioning units equipped with Energy Recovery Units and regulated air intake system (Where Applicable) | MANDATORY | To prevent loss of energy brought about by exhausting conditioned air from the space to the outside and to reuse it for productive purposes. To encourage good design principles in optimizing energy where appropriate and feasible. | Where evidence demonstrates that the project has incorporated strategies to avoid energy loss brought about by exhausting conditioned air to the atmosphere. | Energy recovery systems should be used in all combined supply & extract air handling units where applicable and found practical in terms of 1. Quantity of air extracted. 2. Availability of ERV systems for that capacity. 3. Assessment of the benefits. | 1. Extract from specifications on the of heat recovery units. 2. Schedule of equipment 3. Design drawing highlighting the layout of heat recovery units. | 1. Approved material data sheets / technical submittals for the installed equipment. 2. Date stamped photograph of the installed units. |
(Villas & Residential areas up to 3 habitable floors)
| Item | DESCRIPTION | TYPE | AIM / INTENT | REQUIREMENT / CRITERIA | COMPLIANCE REQUIREMENTS | EVIDENCE REQUIRED AT DESIGN STAGE NOC-BP | EVIDENCE REQUIRED AT POST-CONSTRUCTION STAGE NOC-BCC |
|---|---|---|---|---|---|---|---|
| 7 | Selection of A/C unit with HIGH Energy Efficiency Ratio (EER) | MANDATORY | To optimize the energy consumption of Air Conditioning units proposed to be used in the project. | Where the evidence provided demonstrates that the energy efficient AC equipment has been procured for the project. NOTE. The selected unit should be consistent with the capacities indicated in the Point no 5 under "Efficient Sizing of the HVAC system" | All Air Conditioning units should meet the Minimum Energy Efficiency Ratio (EER) as mentioned in Table-3 of the Annexure. For those units that do not find mention in the Table-3, the Energy Efficiency Ratio (EER) should follow the requirements set out in ASHRAE 90.2/ASHRAE 90.1 as applicable for the project. | 1. Extract from Specification highlighting the requirements on EER. 2. Schedule of AC equipment alongside committed EERs. 3. Confirmation by filling the EER table in part 5 the submission booklet GBF-09 | 1. Approved material data sheets / technical submittals for the installed equipment. 2. Confirmation by filling the EER table in part 5 the submission booklet GBF-10 3. Date stamped photograph of the installed units. This should include the nameplate of units which covers type refrigerant used, total Kw & refrigerant charge. |
| 8 | Energy Efficient Auxiliary Systems of HVAC systems- Blowers and Pumps | NA | NOT APPLICABLE | ||||
(Villas & Residential areas up to 3 habitable floors)
| Item | DESCRIPTION | TYPE | AIM / INTENT | REQUIREMENT / CRITERIA | COMPLIANCE REQUIREMENTS | EVIDENCE REQUIRED AT DESIGN STAGE NOC-BP | EVIDENCE REQUIRED AT POST-CONSTRUCTION STAGE NOC-BCC |
|---|---|---|---|---|---|---|---|
| 9 | INTERIOR LIGHTING LEVELS | MANDATORY | To optimize the energy consumption of Interior Lighting in order to reduce the lighting energy use as well as cooling loads for the conditioned spaces of the villas. Note Even If the areas are not climate controlled, the comfort level would be enhanced by eliminating / reducing unnecessary lighting. | Where evidence demonstrates that the interior lighting levels are improved and NOT exceed those limits prescribed by Table-4 / Equivalent International Guideline | The Interior lighting levels of villas should comply with the limits specified in the Table -4 of the Annexure. For those units that do not find mention in the table, the lighting levels specified should be at least 20% lesser than those levels prescribed in ASHRAE90.1 - 2007 | 1. Proposed specifications on the lighting levels. 2. A comparative table with the LPD values for TRAKHEES case and the proposed case scenario for various areas of the project including the overall savings achieved. | 1. As built calculations to confirm the design values / lighting values required in the regulation 2. As built drawings. 3. Date stamped photos of the installation |
| 10 | EXTERIOR LIGHTING LEVELS | MANDATORY | To optimize the energy consumption of exterior Lighting in order to reduce the total lighting related energy use of the Villas. | Where evidence demonstrates that the exterior lighting levels are improved and NOT exceed those limits prescribed by Table-4. | The Exterior lighting levels in the Villa development should comply with the limits specified in the Table -4 of the Annexure of the Regulation. For those units that do not find mention in... |