GOVERNMENT OF DUBAI
Ports, Customs and Free Zone Corporation
For projects with building permit obtained prior to DBC implementation
|
PCFC-Entity (Business Unit) Name
Department Name
Section Name
Document Reference Number
Revision Number
Revision Date
Classification |
:
:
:
:
:
:
: |
Trakhees - Ports, Customs & Free Zone Corporation
Civil Engineering Department (CED)
Permit Section (Green Buildings/Sustainability)
PCFC-TRK-CED-GB-REG-06
04
August 2016
Public |
|
Item |
DESCRIPTION |
TYPE |
AIM / INTENT |
REQUIREMENT / CRITERIA |
COMPLIANCE REQUIREMENTS |
EVIDENCE REQUIRED AT DESIGN STAGE NOC-BP |
EVIDENCE REQUIRED AT POST-CONSTRUCTION STAGE NOC-BCC |
|
A: GENERAL REQUIREMENTS | |||||||
|
Building Element |
Parameter |
Requirements |
|
Warehouse Structure (NON Conditioned Space) | ||
Notes:
a. The values indicated above are applicable to the full development comprising warehouse, offices and associated areas.
b. Compliance to the above should be demonstrated by submitting relevant sections with Calculations.
INFRARED THERMOGRAPHYEligibility Requirements of Thermographers 1. The thermographer should be suitably qualified/trained/certified - Level 1. 2. Affiliated to ATTMA/BINDT. 3. Minimum 2 years of demonstrable experience. 4. The testing technician should be competent enough to do the test according to the proper procedure and should be able to locate any leakages as well. 5. The technician should be equipped with sensitive and calibrated equipment to test the building according to the procedure.
CV should be submitted to Trakhees-CED (Green Building section) for review and approval.
Test Conditions The conditions (measurement circumstances) should follow the protocol of the referenced standard and should further ensure the following requirements are fulfilled.
1. Atmospheric circumstances and the temperature difference. 2. Wind speed and direction relative to the building. 3. An evenly distributed pressure across the area.
Reporting The report should be comprehensive and of good quality that helps the professionals to make use of the information for proper corrective measures. It should follow the protocols of the standards and as a minimum comprise the following: 1. Background to the objective and principles of the test. 2. Location, orientation, date and time of survey. 3. Brief description of the construction of the building based on drawings or other available documentation. 4. Type(s) of surface material(s) used in the structure and the estimated value(s) of emissivity of this (these) materials(s). 5. A unique identifying reference. 6. Thermographer’s name, affiliation and qualifications. 7. Type of construction. 8. Weather conditions, wind speed and direction, last precipitation, sunshine, degree of cloud cover. 9. Ambient temperatures inside and outside before, at the beginning of the survey and the time of each image. Air temperature and radiant temperature should be recorded. 10. Inside air temperature and air temperature difference across the envelope during the examination. 11. Inside Relative Humidity data and outside Relative Humidity data for the duration of the test. 12. Precipitation, direction of the wind, and velocity of the wind during the examination. 13. Statement of any deviation from relevant test requirements. 14. Sketches and/or photographs of the building showing the positions of the thermographs. 15. Specification of the equipment used, including make, model and serial number , last calibration date, any known defects. 16. Thermographs indicating temperature levels obtained from the test, showing parts of the building where thermal anomalies have been detected, with indications of their respective positions, and the position of the IR camera with respect to the measurement target, and with comments on the appearance of the thermal images, if possible with reference to parts of the building envelope with acceptable performance. 17. Date and signature and professional seal. 18. Type, extent and position of each observed defect. 19. Results of any supplementary measurements and investigations. |
BLOWER DOOR TESTINGEligibility Requirements of testing company 1. A blower door testing training certificate provided by an ATTMA/BINDT Certified testing organization of suitable Level required for undertaking the tests. 2. Minimum 2 years of demonstrable experience. The testing technician should be competent enough to do the test according to the proper procedure and should be able to locate any leakages as well. CV should be submitted to Trakhees for review and approval. 3. The technician should be equipped with sensitive and calibrated equipment to test the building according to the procedure.
Test Conditions 1. The ambient atmospheric conditions (measurement circumstances) should be measured before and after the tests and should follow the CIBSE TM23 - “Testing of buildings for air leakage" protocol and the referenced standard. Measurements taken for following are to be within acceptable limits as described in the CIBSE TM23 guidelines: a. Temperature. b. Humidity. c. Wind speed. d. Barometric pressure.
2. 2 Bias pressure readings to be taken before and after test and averaged as described in the CIBSE TM23 guidelines.
Reporting The report should be comprehensive and of good quality that helps the professionals to make use of the information for proper corrective measures. It should follow the protocols of the standards and as a minimum comprise the following: 1. Background to the objective and principles of the test. 2. Location, orientation, date and time of the test. 3. Brief description of the construction of the building based on drawings or other available documentation. 4. Description of the activities, measurement conditions and if applicable any notes about closed or opened doors etc. 5. Presentation of the measurement-results as well as any digital (visual) images of the object. 6. In case the building doesn’t pass the test: evidence of leakage provided with the use of visual or thermal images. 7. Conclusions and recommendations. |
SPLIT AND PACKAGED UNITS
|
S. No. |
Capacities |
EER (Minimum) |
|
1. |
Less than 2.5TR |
11.8 |
CASSETTE TYPE UNITS EER ≥ 11.5
Notes:
1. The above table stipulates the minimum HVAC energy efficiency requirement (system performance and has taken into consideration the minimum requirements of ASHRAE 90.1 stipulated vide its Table 6.8.1A and the high energy optimization needs of the jurisdiction. This also reiterates that under no circumstances would the EER be less that the ASHRAE stipulated values.
2. It is a well-known fact that HVAC systems consume up to 75% of the building energy consumption especially during summer. These basic EER requirements in conjunction with integrated design principles and other adequate green measures taken during design and construction stages of the project would greatly enhance the operational sustainability of the facility through efficient performance of the HVAC systems.
|
S. No. |
Area / Zone |
Light Power Density(LPD) Watt / Ft2 |
|
1. |
Open Offices |
0.8 |
|
Synod |
Area / Zone |
Light Power Density(LPD) Watt / Ft2 |
|
1. |
Canopies and overhangs |
0.5 |
Notes:
a. The light power densities indicated above are improvements over those levels mentioned in ASHRAE 90.1-2007.
b. Submissions should comprise LPD tables for the project comprising the proposed values in relation to Trakhees specified values for different areas.
|
Fixture Type |
Requirements |
REMARKS |
|
Water Closets |
3/6 l/flush |
Dual flush type |
Notes:
1. The table provides an outline/guidance on the flow and flush fixture requirements to be used in the project. This however does not stop a project from seeking higher efficiencies.
2. It should be ensured that laundry equipment , dish washers etc. that have not been mentioned in the above table are selected from energy star/equivalent accredited products for achieving maximum water savings.
PAINTS:
Interior Coatings:
|
Coating Type |
VOC weight in grams/liter of product minus water |
|
Non-flat |
150 |
Exterior Coatings:
|
Coating Type |
VOC weight in grams/liter of product minus water |
|
Non-flat |
200 |
ANTI-CORROSIVE PAINTS:
|
Coating Type |
VOC weight in grams/liter of product minus water |
|
Gloss |
250 |
CLEAR WOOD FINISHES:
|
Coating Type |
VOC weight in grams/liter of product minus water |
|
Varnish |
350 |
FLOOR COATINGS: 100g/l
SEALERS:
|
Coating Type |
VOC weight in grams/liter of product minus water |
|
Waterproofing sealers |
250 |
SHELLAC:
|
Coating Type |
VOC weight in grams/liter of product minus water |
|
Clear |
730 |
STAINS: 250g/l
|
Architectural Applications |
VOC Limit (g/L less water) |
Specialty Applications |
VOC Limit (g/L less water) |
|
indoor carpet adhesives |
50 |
PvC welding |
510 |
NOTES:
a. The above tables provide prescriptive criteria through which a development is expected to comply with the minimum requirements specified therein.
b. While the table indicates the minimum level, it does not discourage/restrict the stakeholder in seeking higher levels of performance.
c. It is strongly suggested the consultants undertake building energy simulation to demonstrate improvement in building performance by optimizing various factors.
d. It is inherent that significant importance is to be attached to the performance of the villas based on the actual utility and requirement which exceeds the basic requirement set by the prescriptive approach.