Trakhees Green Building Regulation GB 4.0: (LEED NC v3.0)

Status

In force

Issuing Authority

Ports, Customs and Free Zone Corporation

GOVERNMENT OF DUBAI
Ports, Customs and Free Zone Corporation

For projects with building permit obtained prior to DBC implementation.

PCFC-Entity (Business Unit) Name: Trakhees - Ports, Customs & Free Zone Corporation

Department Name: Civil Engineering Department (CED)

Section Name: Permit Section (Green Buildings/Sustainability)

Document Reference Number: PCFC-TRK-CED-GB-REG-04

Revision Number: 01

Revision Date: February 2013

Classification: Public

 

Regulation GB-4.1. Site Selection

4.1.1 General

This category of credits is intended to reduce environmental damage, pollution and other harmful effects due to building construction Buildings affect ecosystems in a variety of ways. Development projects must be sensitive to encroaching on agricultural lands, compromising existing wildlife habitat and exacerbating regional and local erosion.

 

4.1.2 SS Prerequisite 1: Construction Activity Pollution Prevention - Required [Mandatory]

Intent

Reduce pollution from construction activities by controlling soil erosion, waterway sedimentation and airborne dust penetration.

 

Requirements

Create and implement an erosion and sedimentation control plan for all construction activities associated with the project. The plan must conform to the local erosion and sedimentation control standards and codes.

 

The plan must describe the measures implemented to accomplish the following objectives.

a. To prevent loss of soil during construction by storm water runoff and/or wind erosion, including protecting topsoil by stockpiling for reuse.

b. To prevent sedimentation of storm sewers or receiving streams.

c. To prevent pollution of the air with dust and particulate matter.

 

Potential Technologies & Strategies

Create an erosion and sedimentation control plan during the design phase of the project. Consider employing strategies such as temporary and permanent seeding, mulching, earthen dikes, silt fencing, sediment traps and sediment basins.

 

4.1.3 SS Credit 1: Site Selection - 1 Point [MANDATORY]

Intent

Avoid development of inappropriate sites and reduce the environmental impact from the location of a building on a site.

 

Requirements

Do not develop buildings, hardscape, roads or parking areas on portions of sites that meet any one of the following criteria:

a. Prime farmland as identified by Dubai Municipality.

b. Previously undeveloped land whose elevation is lower than 5 feet above the elevation of the 100-year flood.

c. Land that is specifically identified as habitat for any species of threatened or endangered lists.

d. Within 100 feet of any wetlands and isolated wetlands or areas of special concern identified by state or local rule, OR within setback distances from wetlands prescribed in state or local regulations, as defined by local or state rule or law, whichever is more stringent.

e. Previously undeveloped land that is within 50 feet of a water body, defined as seas, lakes, rivers, streams and tributaries which support or could support fish, recreation or industrial use.

f. Land which prior to acquisition for the project was public parkland, unless land of equal or greater value as parkland is accepted in trade.

 

Potential Technologies & Strategies

During the site selection process, give preference to those sites that do not include sensitive site elements and restrictive land types. Select a suitable building location and design the building with the minimal footprint to minimize site disruption of those environmentally sensitive areas identified above.

 

4.1.4 SS Credit 2: Development Density & Community Connectivity - 5 Points

Intent

Channel development to urban areas with existing infrastructure, protect Greenfield and preserve habitat and natural resources.

 

Requirements

OPTION 1:

DEVELOPMENT DENSITY

Construct or renovate building on a previously developed site AND in a community with a minimum density of 60,000 square feet per acre net (Note: density calculation must include the area of the project being built and is based on a typical two-story downtown development).

 

OR

OPTION 2:

COMMUNITY CONNECTIVITY

Construct or renovate building on a previously developed site AND within 1/2 mile of a residential zone or neighborhood with an average density of 10 units per acre net AND within 1/2 mile of at least 10 Basic Services AND with pedestrian access between the building and the services.

 

Basic Services include, but are not limited to:

1. Bank;

2. Place of Worship;

3. Convenience Grocery;

4. Day Care;

5. Cleaners;

6. Fire Station;

7. Beauty;

8. Hardware;

9. Laundry;

10. Library;

11. Medical/Dental;

12. Senior Care Facility;

13. Park;

14. Pharmacy;

15. Post Office;

18. Restaurant;

17. School;

18. Supermarket;

19. Theater;

20. Community Center;

21. Fitness Center;

22. Museum.

 

Proximity is determined by drawing a 1/2 mile radius around the main building entrance on a site map and counting the services within that radius.

 

Potential Technologies & Strategies

During the site selection process, give preference to urban sites with pedestrian access to a variety of services.

 

4.1.5 SS Credit 3: Brownfield Redevelopment - 1 Point

Intent

Rehabilitate damaged sites where development is complicated by environmental contamination, reducing pressure on undeveloped land.

 

Requirements

OPTION 1: 

Develop on a site documented as contaminated (by means of an ASTM E1903-97 Phase II Environmental Site Assessment or a local Voluntary Cleanup Program).

 

OR

OPTION 2: 

Develop on a site defined as a Brownfield by a local, state or federal government agency.

 

Potential Technologies & Strategies

During the site selection process, give preference to Brownfield sites. Identify tax incentives and property cost savings. Coordinate site development plans with remediation activity, as appropriate.

 

4.1.6 SS Credit 4.1: Alternative Transportation: Public Transportation Access - 6 Points

Intent

Reduce pollution and land development impacts from automobile use.

 

Requirements

OPTION 1:

Rail Station Proximity

Locate project within 1/2 mile of an existing, or planned and funded, commuter rail, light rail or subway station.

 

OR

OPTION 2:

Bus Stop Proximity

Locate project within 1/4 mile of one or more stops for two or more public or campus bus lines usable by building occupants.

 

Potential Technologies & Strategies

Perform a transportation survey of future building occupants to identify transportation needs. Site the building near mass transit.

 

4.1.7 SS Credit 4.2: Alternative Transportation: Bicycle Storage & Changing Rooms - 1 Point

Intent

Reduce pollution and land development impacts from automobile use.

 

Requirements

CASE 1:

For commercial or institutional buildings: 

- provide secure bicycle racks and/or storage (within 200 yards of a building entrance) for 5% or more of all building users (measured at peak periods);

- provide shower and changing facilities in the building, or within 200 yards of a building entrance, for 0.5% of Full-Time Equivalent (FTE) occupants.

 

OR

CASE 2:

For residential buildings:

- provide covered storage facilities for securing bicycles for 15% or more of building occupants in lieu of changing/shower facilities.

 

Potential Technologies & Strategies

Design the building with transportation amenities such as bicycle racks and showering/changing facilities.

 

4.1.8 SS Credit 4.3: Alternative Transportation: Low Emitting & Fuel Efficient Vehicles - 3 Points

Intent

Reduce pollution and land development impacts from automobile use.

 

Requirements

OPTION 1: 

Provide low-emitting and fuel-efficient vehicles for 3% of Full-Time Equivalent (FTE) occupants AND provide preferred parking for these vehicles.

 

OPTION 2: 

Provide preferred parking for low-emitting and fuel-efficient vehicles for 5% of the total vehicle parking capacity of the site.

 

OPTION 3: 

Install alternative-fuel refueling stations for 3% of the total vehicle parking capacity of the site (liquid or gaseous fueling facilities must be separately ventilated or located outdoors).

 

For the purposes of this credit, low-emitting and fuel-efficient vehicles are defined as vehicles that are either classified as Zero Emission Vehicles (ZEV) by the California Air Resources Board or have achieved a
minimum green score of 40 on the American Council for an Energy Efficient Economy (ACEEE) annual vehicle rating guide.

 

"Preferred parking" refers to the parking spots that are closest to the main entrance of the project (exclusive of spaces designated for handicapped) or parking passes provided at a discounted price.

 

Potential Technologies & Strategies

Provide transportation amenities such as alternative fuel refueling stations. Consider sharing the costs and benefits of refueling stations with neighbors.

 

4.1.9 SS Credit 4.4: Alternative Transportation: Parking Capacity - 2 Points [MANDATORY]

Intent

Reduce pollution and land development impacts from single occupancy vehicle use.

 

Requirements

CASE 1:

Non-Residential Projects

 

OPTION 1: 

Size parking capacity must meet but not exceed minimum local zoning requirements. Provide preferred parking for carpools or vanpools for 5% of the total parking spaces.

 

OR

OPTION 2: 

For projects that provide parking for less than 5% of full-time equivalent (FTE) building occupants:

Provide preferred parking for carpools or vanpools, marked as such, for 5% of total parking spaces. Providing a discounted parking rate is an acceptable substitute for preferred parking for carpool or vanpool vehicles. To establish a meaningful incentive in all potential markets, the parking rate must be discounted at least 20%. The discounted rate must be available to all customers (i.e., not limited to the number of customers equal to 5% of the vehicle parking capacity), publicly posted at the entrance of the parking area, and available for a minimum of 2 years.

OR

OPTION 3: 

Provide no new parking.

 

CASE 2: 

Residential Projects

 

OPTION 1: 

Size parking capacity to meet but not exceed minimum local zoning requirements.

Provide infrastructure and support programs to facilitate shared vehicle use such as carpool drop-off areas, designated parking for vanpools, car-share services, ride boards and shuttle services to mass transit.

 

OR

OPTION 2: 

Provide no new parking.

 

CASE 3:

Mixed Use (Residential with Commercial/Retail) Projects

 

OPTION 1: 

Mixed-use buildings with less than 10% commercial area must be considered residential and adhere to the residential requirements in Case 2. For mixed-use buildings with more than 10% commercial area, the commercial space must adhere to non-residential requirements in Case 1 and the residential component must adhere to residential requirements in Case 2.

 

OR

OPTION 2: 

Provide no new parking.

 

"Preferred parking" refers to the parking spots that are closest to the main entrance of the project (exclusive of spaces designated for handicapped) or parking passes provided at a discounted price.

 

Potential Technologies & Strategies

Minimize parking lot/garage size. Consider sharing parking facilities with adjacent buildings. Consider alternatives that will limit the use of single occupancy vehicles.

 

4.1.10 SS Credit 5.1: Site Development-Protect or Restore Habitat - 1 Point [MANDATORY]

Intent

Conserve existing natural areas and restore damaged areas to provide habitat and promote biodiversity.

 

Requirements

CASE 1:

Greenfield Sites

Limit all site disturbances to the following parameters:

- 40 feet beyond the building perimeter;

- 10 feet beyond surface walkways, patios, surface parking and utilities less than 12 inches in diameter;

- 15 feet beyond primary roadway curbs and main utility branch trenches;

- 25 feet beyond constructed areas with permeable surfaces (such as pervious paving areas, storm water detention facilities and playing fields) that requires additional staging areas to limit compaction in the constructed area.

 

CASE 2:

Previously Developed Areas or Graded Sites

Restore or protect a minimum of 50% of the site (excluding the building footprint) or 20% of the total site area (including building footprint), whichever is greater, with native or adapted vegetation. Projects earning SS Credit 2: Development Density and Community Connectivity may include vegetated roof surface in this calculation if the plants are native or adapted, provide habitat, and promote biodiversity.

 

Potential Technologies & Strategies

Survey Greenfield sites to identify site elements and adopt a master plan for developing the project site. Carefully site the building to minimize disruption to existing ecosystems and design the building to minimize its footprint. Strategies include stacking the building program, tuck-under parking and sharing parking facilities with neighbors. Establish clearly-marked construction boundaries to minimize disturbance of the existing site and restore previously degraded areas to their natural state. For previously developed sites, use local and regional governmental agencies, consultants, educational facilities and native plant societies as resources for the selection of appropriate native or adapted plants. Prohibit plants listed as invasive or noxious weed species. Once established, native/adapted plants require minimal or no irrigation; do not require active maintenance such as mowing or chemical inputs such as fertilizers, pesticides or herbicides; and provide habitat value and promote biodiversity through avoidance of monoculture plantings.

1. Greenfield sites are those that are not previously developed or graded and remain in a natural state.

2. Previously developed areas are those that previously contained buildings, roadways, parking lots or were graded or altered by direct human activities.

3. Native or adapted plants are plants indigenous to a locality or cultivars of native plants that are adapted to the local climate and are not considered invasive species, or noxious weeds.

 

4.1.11 SS Credit 5.2: Site Development: Maximize Open Space - 1 Point

Intent

Provide a high ratio of open space to development footprint to promote biodiversity.

 

Requirements

CASE 1:

Sites with Local Zoning Open Space Requirements

Reduce the development footprint 1 and/or provide vegetated open space within the project boundary such that the amount of open space exceeds local zoning requirements by 25%.

 

CASE 2:

Sites with No Local Zoning Requirements (e.g. some university campuses, military bases)

Provide a vegetated open space area adjacent to the building that is equal in area to the building footprint.

 

CASE 3:

Sites with Zoning Ordinances but No Open Space Requirements

Provide vegetated open space equal to 20% of the project site area.

 

ALL CASES

For projects in urban areas that earn SS Credit 2: Development Density and Community Connectivity, vegetated roof areas can contribute to credit compliance.

 

For projects in urban areas that earn SS Credit 2: Development Density and Community Connectivity, pedestrian-oriented hardscape areas can contribute to credit compliance.

 

For such projects, a minimum of 25% of the open space counted must be vegetated.

Wetlands or naturally designed ponds may count as open space and the side slope gradients average 1:4 (vertical: horizontal) or less and are vegetated.

 

Potential Technologies & Strategies

Perform a site survey to identify site elements and adopt a master plan for developing the project site. Select a suitable building location and design the building footprint to minimize site disruption. Strategies include stacking the building program, tuck-under parking and sharing parking facilities with neighbors to maximize the amount of open space on the site.

 

4.1.12 SS Credit 6.1: Storm water Design-Quantity Control - 1 Point

Intent

To limit disruption of natural hydrology by reducing impervious cover, increasing on-site infiltration, reducing or eliminating pollution from storm water runoff and eliminating contaminants.

 

Requirements

CASE 1:

Sites with Existing Imperviousness 50% or Less

 

OPTION 1: 

Implement a storm water management plan that prevents the post development peak discharge rate and quantity from exceeding the predevelopment peak discharge rate and quantity for the 1- and 2-year 24-hour design storms.

 

OR

OPTION 2: 

Implement a storm water management plan that protects receiving stream channels from excessive erosion. The storm water management plan must include stream channel protection and quantity control strategies.

 

CASE 2:

Sites with Existing Imperviousness Greater Than 50%

Implement a storm water management plan that results in a 25% decrease in the volume of storm water runoff from the 2-year 24-hour design storm.

 

Potential Technologies & Strategies

Design the project site to maintain natural storm water flows by promoting infiltration. Specify vegetated roofs, pervious paving and other measures to minimize impervious surfaces. Reuse storm water for non-potable uses such as landscape irrigation, toilet and urinal flushing, and custodial uses.

 

4.1.13 SS Credit 6.2: Storm water Design-Quality Control - 1 Point

Intent

Limit disruption and pollution of natural water flows by managing storm water runoff.

 

Requirements

Implement a storm water management plan that reduces impervious cover, promotes infiltration and captures and treats the storm water runoff from 90% of the average annual rainfall using acceptable best management practices (BMPs). BMPs used to treat runoff must be capable of removing 80% of the average annual post development total suspended.

 

Solids (TSS) load based on existing monitoring reports. BMPs are considered to meet these criteria if:

- They are designed in accordance with standards and specifications from a state or local program that has adopted these performance standards; or

- There exists infield performance monitoring data demonstrating compliance with the criteria.

 

Potential Technologies & Strategies

Use alternative surfaces (e.g.. vegetated roofs, pervious pavement, grid pavers) and nonstructural techniques (e.g., rain gardens, vegetated swales, disconnection of imperviousness, rainwater recycling) to reduce imperviousness and promote infiltration and thereby reduce pollutant loadings.

 

Use sustainable design strategies (e.g.. low-impact development, environmentally sensitive design) to create integrated natural and mechanical treatment systems such as constructed wetlands, vegetated filters and open channels to treat storm water runoff.

 

4.1.14 SS Credit 7.1: Heat Island Effect-Non Roof - 1 Point [MANDATORY]

Intent

To reduce heat islands 1 to minimize impacts on microclimates and human and wildlife habitats.

 

Requirements

OPTION 1: 

Use any combination of the following strategies for 50% of the site hardscape (including roads, sidewalks, courtyards and parking lots):

- Provide shade from the existing tree canopy or within 5 years of landscape installation. Landscaping (trees) must be in place at the time of occupancy.

- Provide shade from structures covered by solar panels that produce energy used to offset some nonrenewable resource use.

- Provide shade from architectural devices or structures that have a solar reflectance index2 (SRI) of at least 29.

- Use hardscape materials with an SRI of at least 29.

- Use an open-grid pavement system (at least 50% pervious).

 

OR

OPTION 2: 

Place a minimum of 50% of parking spaces under cover. Any roof used to shade or cover parking must have an SRI of at least 28, be a vegetated green roof or be covered by solar panels that produce energy used to offset some nonrenewable resource use.

 

Heat islands are defined as thermal gradient differences between developed and undeveloped areas.

 

* The solar reflectance index (SRI) is a measure of the constructed surface's ability to reflect solar heat, as shown by a small temperature rise. It is defined so that a standard black surface (reflectance 0.05, emittance 0.90) is 0...