Unified UAE Legislation Database
Checked by realLaw AI

Regulation PM - 15.0 Bunker Regulations

Status

In force

Issuing Authority

DPA

PCFC- Entity (Business Unit) Name: Dubai Ports Authority 

Department Name: Ports Marine Services 

Document Reference Number: PCFC-DPA-PS-REG-15 

Revision Number: 03 

Revision Date: May 2025 

Classification: Public 

 

NOTE: 

Please be informed that as decreed in Dubai Circular No. 6 of 2025 regarding the transfer of Ports and Maritime Section from the Department of Planning and Development to Dubai Ports Authority (DPA). 

 

 

15.1 Scope 

These Regulations have been developed to ensure that Bunkering Operations are conducted in a safe manner to reduce and minimize risks to personnel and the environment and apply to all parties involved with Bunkering Operations within the PCFC-DPA Ports. These regulations do not replace IMO and federal regulations. All relevant parties must apply these Regulations as a minimum standard for all Bunkering Operations within the PCFC- DPA Ports. 

 

15.2 Definitions 

15.2.1 Shipping Agent: A shipping agency or shipping agent is the designated person or agency held responsible for handling shipments and cargo, and the general interests of its customers, at ports and harbors worldwide, on behalf of ship owners, managers, and charterers. 

 

15.2.2 Applicable International Requirements: The conventions, protocols, regulations 
guidelines, resolutions, or codes of International Organizations. 

 

15.2.3 Business Units: DP World, Dry Dock World, Dubai Maritime City, P&O Maritime,   

 

15.2.4 Bunkering: An operation to supply liquid or gas intended for the main propulsion and/or operation of the auxiliary machinery of a vessel or a liquid intended for lubricating the vessel’s engine or her other machinery or equipment. 

 

15.2.5 Bunker Supply Company: A company approved by DPA Ports Services Department  to perform bunkering operations within Dubai Ports falling under PCFC – DPA  Jurisdiction. 

 

15.2.6 Bunker Vessel: Means the vessel provided by the Bunker Supply Company for the purpose of supplying bunker to the receiving vessel and approved by DPA Ports Services Department  

 

15.2.7 Bunkers: means petroleum in any form including crude oil, fuel oil, sludge, oil refuse, refined products and any noxious liquid substance (as defined in MARPOL 73/78 Annex II Chapter 1 Regulation 1) and the residues thereof when carried on board a Ship but not as cargo and liquefied natural gas fuel or any alternative fuel. 

 

15.2.8  Bunkering Operations: 

- Pipe-To-Ship (PTS) – a terminal installed on a dock supplies fuel to the ship's tanks, 

- Ship-To-Ship (STS) – fuel is transferred from one specialized ship to another. 

- Tanker-To-Ship (TTS) – tanker trucks in the dock are used to load the ship's tanks. 

 

15.2.9 Bunkering Safety Check List: means the Bunkering Safety Check List published in ISGOTT or IAPH from time to time or such other bunkering safety check list which either matches or exceeds the referred above standard. 

 

15.2.10   Bunker Tanker: A road tanker approved by DPA Ports Services Department to 
perform bunkering operations. 

 

15.2.11 Bunker Terminal: A dedicated shore tanker terminal approved by DPA Ports Services Department to perform bunkering operations. 

 

15.2.12   Bunker Facility: Bunkering Vessel, Bunker Vehicle or Bunker Terminal 

 

15.2.13   Competent Authority: Dubai Ports Authority – DPA. 
 

 

15.2.14 COA: Certificate of Approval. 

 

15.2.15 DCD: Dubai Civil Defense. 

 

15.2.16 CDI: Chemical Distribution Index.  

 

15.2.17 ERC: Emergency Release Coupling 

 

15.2.18 Harbour Master: Head of Marine Department 

 

15.2.19 IAPH: International Association of Ports & Harbors 

 

15.2.20 IGC: (International Code for The Construction and Equipment Of Ships Carrying Liquefied Gases In Bulk) 

 

15.2.21 ISGOTT: means the International Safety Guide for Oil Tankers and Terminals. 

 

15.2.22 IMO: International Maritime Organization. 

 

15.2.23 IMDG: International Maritime Dangerous Goods  

 

15.2.24 IGS: Inert Gas Systems 

 

15.2.25 LNG: Liquefied Natural Gas 

 

15.2.26 MARPOL: International Convention for the Prevention of Pollution from Ships. 

 

15.2.27 MARVS: Maximum Allowable Relief Valve Setting. 

 

15.2.28 MEPC: Marine Environment Protection Committee 

 

15.2.29 OFC: Operation Fitness Certificate. 

 

15.2.30 Officer in Charge: Means the appropriately qualified ship officer appointed by the Ship’s Master to oversee the Bunkering Operations. 

 

15.2.31 OCIMF: Oil Companies International Marine Forum. 

 

15.2.32 PCFC: Ports Customs & Free Zone Corporations. 

 

15.2.33 PCFC Ports: means the all the Ports under the jurisdiction of PCFC which are “Jebel Ali”, “Port Rashid”, “Port Hamriyah”, “Dubai Dry Docks”, and “Dubai Maritime City”. 

 

15.2.34 Receiving Vessel:  includes every description of watercraft, including nondisplacement craft and seaplanes, used or capable of being used as a means of transportation on water that receives bunker . 

 

15.2.35 SIGTTO: The Society of International Gas Tankers and Terminal Operators. 

 

15.2.36 Responsible Person: A responsible person who is authorized by the Receiving Vessel and Bunker Facility to execute and supervise Bunkering Operation. 

- Receiving Vessel – Master or Officer in charge (as appointed by Master). 

- Bunker Vessel – Master or Officer in charge (as appointed by Master 

- Bunker Tanker   – Driver of the tanker truck 

- Bunker Terminal – Loading Master  

 

15.2.37 ROPME: Regional Organization for the Protection of Marine Environment. 

 

15.2.38 SOPEP: means Ship Oil Pollution Emergency Plan or Shipboard Marine Pollution Emergency Plan as appropriate. 

 

15.2.39 VHF: Very High Frequency 

 

15.2.40 SIMOPS; Simultaneous Operations 

 

15.2.41  Designated Anchorage: the designated anchorage areas within PCFC-DPA jurisdiction where bunkering activity is permitted.  

 

15.3  Approval Process 

15.3.1 Prequalification 

15.3.1.1  Only Bunker Supply Companies approved by Competent Authority are permitted to perform bunkering operations within Dubai Ports and under PCFC – DPA Jurisdiction. 

15.3.1.2  Bunker Supply Companies must be prequalified and holds a valid Certificate of Approval (COA) issued by the Competent Authority in line with procedure PCFC-DPA-PS-CP-01. 

15.3.1.3 Bunker Vehicle must hold a valid Permit issued by the Competent Authority in line with procedure PCFC-DPA-PS-CP-05. 

15.3.1.4 Bunker Vessel must hold a valid Permit issued by the Competent Authority in line with procedure PCFC-DPA-PS-CP-06. 

15.3.1.5 Bunkering Terminal must hold a valid Operation Permit  (OP) issued by the Competent Authority in line with procedure PCFC-DPA-PS-CP-09. 15.3.1.6  

15.3.1.7  Bunker Tanker Driver/Helper must hold a Valid Training Card issued by the Competent Authority and Staff Name must be included in the Certificate of Approval Attachment (refer PCFC-DPA-PS-CP-01). 

 

15.3.2 DPA NOC 

15.3.2.1 Receiving Vessel Local Shipping Agent must obtain DPA NOC for Bunker Operation from Dubai Ports Authority by submitting the request through PCFC Online Services in line with procedure PCFC- DPA-PS-CP-02. 

15.3.2.2  Marine NOC shall be requested at least 1 working day in advance from the 
intended operation time. 

 

15.4 Responsibilities 

15.4.1 These Regulations do not relieve any person of the requirement to comply with any statutory Act, Order or Regulation that may apply to their vessel or operation. 

 

15.4.2 Bunkering Operations must be performed diligently, safely and without deliberate or 
undue delay. 

 

15.4.3  The Bunker Facility shall have written safety, health, environment, and quality plans (always including a pollution emergency plan and/or SOPEP) in place and shall make these available to DPA Officer upon demand during inspection. 

 

15.4.4  The Bunker Facility shall undertake risk assessments of the bunkering services that it offers within the PCFC-DPA Ports and shall make these available to the Competent Authority upon demand during inspection. 

 

15.4.5 The Bunker Facility shall have sufficient and appropriate drip containment and spill response equipment at the location of the Bunkering Operations which shall be readily available for deployment. 

 

15.4.6 Bunker Facility and Receiving Vessel Master should follow the principles of the Bunkering   Operations  guidance  procedures  as  laid  out   in 
ISGOTT/IAPH/SIGTTO/CDI/ICS/OCIMF, as amended from time to time. and Port Bye laws and Regulations, as well as General Directions for Navigation. 

 

15.4.7 The Vessel Master of the receiving vessel and the Bunker Facility shall appoint a Responsible Person for the Bunkering Operations supervision. 

 

15.4.8 Responsible Person shall be responsible for complying with and adhering to the  appropriate practices and procedures laid down for their operations. 

 

15.4.9  Prior to Bunkering Operations commencing, the Responsible Persons must exchange a Bunkering Safety Check List (Refer to Appendix). Copies of the Bunkering Safety Check List must be retained by the Receiving Vessel and Bunker Facility for at least one month following completion of the Bunkering Operations and must be produced to Competent Authority upon demand during inspection. 

 

15.4.10 During Bunkering Operations, the responsible persons shall ensure that all necessary measures are taken to prevent the spillage of Bunkers into the waters or onto any quayside. 

 

15.4.11 In the event that the responsible persons cannot identify or establish communications both ways, then Bunkering Operations should not commence or if they are underway, they should cease immediately. 

 

15.4.12 Bunker Vessels undertaking Bunkering Operations must display the flags/lights as per IMO requirements. 

 

15.4.13 The responsible persons shall ensure that pumping rates and pipe/hose pressures will be maintained as agreed (within allowable limits of equipment and safe operation) and shall remain on duty close to the pipe/hose connection in order to oversee the safe bunker operation and to be able to respond to an emergency throughout the bunker delivery. Persons involved in bunkering operations, should have no other tasks assigned to them. 

 

15.4.14 The responsible persons shall ensure that Bunker Plan is available and updated in line with company/vessel ISM manual and MARPOL Regulations. 

 

15.4.15 The responsible person onboard the receiving vessel has the authority to order the pumping and to stop if necessary. 

 

15.4.16 The responsible person of the receiving vessel shall ensure not to close any valve which will restrict the flow of the product or blow/purge the line without adequate notice to the responsible person of the and bunker facility and their vessel crew will remain on duty near to the hose connection/bunker stations/tanks in order to oversee the safe bunker operation and to respond to an emergency throughout the bunkering operation. 

 

15.4.17 The responsible persons shall be responsible for hose connection/disconnection, line blow/purge/striping as per areas of responsibilities and assigned duties. 

 

15.4.18 The approved Bunker Supply Company shall ensure a Bunker Delivery Note (BDN) is produced to the Master of the Receiving Vessel. BDN shall be retained by the Vessel and Bunker Supplier and to be produced to Competent Authority as requested in accordance with MARPOL Regulations and Local Regulations. 

 

15.4.19 The approved bunker supplier shall be responsible to provide exact quantity and quality of fuel as specified in the Bunker Delivery Note (BDN) in accordance with MARPOL Regulations and Local Regulations. and should not lead to any discrepancies after supply. 

 

15.4.20 Business Units of respective areas are responsible for ensuring the requirements stipulated in these regulations are followed while bunkering at their operational areas. 

 

15.4.21 It is the obligation of the Business Units to ensure that bunkering operation does not interfere or cause any hindrances to the routine operations in their respective areas. 

 

15.4.22 Business Units are responsible for ensuring that only DPA approved bunker suppliers, bunkering vessels, bunkering vehicles are permitted inside their operational areas to perform bunkering operations. 

 

15.5 Bunker Operation Safety Checklist 

15.5.1 The responsible persons shall complete the appropriate “Bunker Operation Safety Checklist” Refer to Appendix. Bunker operation shall not commence before responsible persons have signed, confirmed, and agreed to the contents of the Bunker Operation Safety Checklist. 

 

15.5.2 These checklists shall provide adequate level of protection against spillages, 
leakages, any other unsafe acts, and unsafe conditions. Competent Authority will accept only these checklists into consideration in case of any disputes. 

 

15.5.3 Safety Officer from the respective business units shall check the Bunker Operation Safety Checklist dully filled and signed prior to commence the bunker operation. 

 

15.6 Safety Requirements 

15.6.1 For Bunker Tanker 

Bunker Tankers operating within PCFC jurisdiction shall hold a valid permit from DPA Ports, below mentioned are the minimum requirements for the trucks to have so to operate within PCFC DPA Ports jurisdiction. 

15.6.1.1  Equipment in Cabin 

15.6.1.1.1  Fire extinguisher 

1. If a tanker is used for the transport of fuel or its derivatives, which is classified as dangerous good, the vehicle must be equipped with a fire extinguisher or fire extinguishers in accordance Dubai Civil Defense Code 

15.6.1.1.2 Driver safety kits (Personal Protective Equipment and Safety Equipment) 

1. Driver safety kits means equipment available to lend protection to the driver of the vehicle, e.g. Safety goggles, chemical resistant gloves, chemical resistant overalls, chemical resistant boots, eye wash, respirator, electric torch 

2. Provision must be made in the cabin for the storage of driver safety kits (personal protective equipment and safety equipment). 

15.6.1.1.3 Emergency information and holder 

1. Emergency Procedure Guide: which outlines the procedures to be followed in the case of an emergency shall be made available and kept at the emergency Information Holder 

2. An emergency information holder is a holder of a size and shape suitable for carrying. 

3. emergency information and documentation; and marked with words “Emergency Procedure Guides” or “Emergency Information” in red letters at least 10 mm high on a white background. 

4. An emergency information holder must be securely placed on a vehicle either on the inside of a door of the cabin; or if the construction of the vehicle does not allow the holder to be attached to the door, in a conspicuous position adjacent to the door. 

5. Copy of SDS (Safety data Sheet) for the type of fuel transported shall be kept at the Holder. 

15.6.1.1.4  Fire Shield 

1. Driver’s cabin backside facing the tank shall be protected with fire shield so to protect the driver from any accidental fire or explosion. 

15.6.1.1.5 Electrical 

1. The battery must be firmly secured to prevent movement in the event of vehicle overturn and must be ventilated. It shall be in an accessible position and must have a substantial and secured acid-resistant cover, electrically insulated on the side adjacent to the battery terminals. 

15.6.1.1.6 Marking and Placarding 

1. Marking and placarding of vehicle shall be as per Dubai Municipality Guideline No 43 “Placarding of Vehicles Carrying Dangerous Goods.” 

15.6.1.1.7 Spill Kit 

1. The vehicle must be equipped with a spill kit consisting of a container or stock of material, which would enable a small spill, leak or escape of the prescribed fuel being transported to be safely, and effectively cleaned up e.g. broom, shovel, sealable bucket, absorbent material. 

2. The spill kit carried on a vehicle must be stowed in an accessible position. 

15.6.1.1.8  Tank 

1. The tank must be free of any defect that is likely to create a risk in transporting the fuel. At the time of inspection, a “hydrostatic test report” may be requested. 

2. The tank must be clean. 

3. Relation to construction of the tank, The materials of construction of those parts of the tank and its fittings that are likely to come into contact with the cargo during transit, loading or unloading must be

4. Substantially immune from attack by the cargo and 

5. Lined with a material which is substantially immune from attack by the cargo. 

6. The tank container must be secured on the vehicle using either four engaged twist locks: or another equally effective method for securing the container. 

7. Every tank must be provided with roll-over protection (unless this is not provided by external frame members) which shall comply with the following requirement as appropriate: - 

8. A guard in the form of inverted U-comings, the thickness of which must not be less than 5mm. 

9. Any guard, dome or coaming must project at least 25mm above the top of the fitting, which it projects. 

10. Discharge connection must be rigidly attached to the tank and must not be lower than 40mm below centerline axles. 

11. Provisions must be made for protection of valves and fittings in case of collision or overturn unless external frame members provide this. 

12. The valves must be marked with “open” and “shut” signs. 

13. Pump shut-off valves must effectively operate when the tank is full. 

14. Tank must be fitted with a level indicator. 

15. The diameter of Manholes must be at least 400mm. 

16. Manhole covers must be leak proof and fully secured. 

17. Pressure / vacuum reliving devices must be as per standard requirements. 

15.6.1.1.9 Outlet 

1. Internal & external valves shall be labelled to indicate on/off position. 

2. Dust (leak proof) caps shall be provided with captive chains. 

15.6.1.1.10 Bumper 

1. Bumper clearance should be at least 150 mm and it should extend to full width of the tank. 

2. Attached to sub frame/chassis (not tank) 

15.6.1.1.11  Hoses and Fittings 

1. All hoses shall be tested and certified by an EIAC approved body. A tag with number and date shall be punched or plated on to the hose connection flange on both ends. 

2. Copy of the hose certificate shall be made available at the driver’s cabin. 

3. Hoses shall be kept at dedicated storage area and must be watertight and must have a drain valve with either a bung or tap fitted. 

4. All hoses must have end caps. 

 

15...