PPP PROJECTS MANUAL

INTRODUCTION

This chapter contains a set of terms mentioned in this manual and provides their definitions:

  1. If the terms are not presented exactly as they are in the glossary, they should be understood in their usual sense.

  2. For efficient searching of specific definitions, please remove the definite article “the” from the term if applicable.

  3. The terms mentioned in the glossary are interpreted as follows:

a) The singular includes the plural, and the plural includes the singular.

b) The masculine includes the feminine, and the feminine includes the masculine.

I. GLOSSARY

TERMDEFINITION
The stateThe United Arab Emirates.
The governmentThe United Arab Emirates government.
TERMDEFINITION
GDP (gross domestic product)The monetary value of all the goods and services produced within a country's borders in a specific period of time.
Project internal rate of return (IRR)The discount rate at which the net present value of all cash flows (positive and negative) from a project or investment equals zero. It is used to evaluate the attractiveness of a project or investment (in general, if the IRR exceeds the cost of capital/project hurdle rate1/project financing cost, it adds value).

II. PREFACE

Public private partnerships (PPPs) can diversify the mechanisms for developing strategic infrastructure projects and improve the quality of services. At the same time, PPPs give the government authority to supervise and evaluate quality and efficiency during the implementation of these projects.

The government strives to benefit society, the state, the private sector, and the local/national economy through strategic PPP development projects. It is also aware that implementing these projects can be challenging and complicated.

The issuance of this manual is a first step in successfully developing major strategic projects and supporting the national economy. This manual serves as an open invitation to the private sector to make a positive contribution to the state's efforts.

The ministry prepared this manual to document the general guidelines and procedures relating to partnership contracts between federal entities and the private sector. These guidelines and procedures are in line with the provisions of federal law no. (12) of 2023, which regulates PPPs.

This manual presents a high-level framework for the life-cycle of PPPs. However, a federal entity may perform more specialized and in-depth research and studies regarding financial, technical, and legal issues, including the legislative environment. The federal entity should also coordinate closely with the ministry, which assumes many responsibilities throughout the PPP project life cycle.

III. AIMS OF THIS MANUAL

This manual clarifies governance and procedures to follow when designing and implementing a PPP project. It summarizes the guidelines and processes that federal entities and potential private sector partners should follow when aiming to engage in a PPP project. This ensures clarity and consistency between stakeholders.

A. In relation to the ministry

This manual:

  • Provides clear guidelines on the ministry's involvement throughout the PPP process and its interactions with other key stakeholders.

 

 

B. In relation to the concerned federal entity

This manual:

  • Provides a clear process for conducting and implementing PPP contracts.
  • Documents and unifies the mechanisms, standards, and terms for executing PPP projects.
  • Clarifies the principles for monitoring, managing, and implementing PPP contracts.

C. In relation to the private sector

This manual:

  • Clarifies private sector partners' rights and liabilities under a PPP contract.
  • Provides guidance on the bidding and tendering process for potential private sector partners.

A. Its application

This guide is dedicated to partnership projects between federal entities and the private sector.

B. Its implementation

  • The provisions in this manual apply from the date specified in the cabinet resolution.

  • The provisions apply to all processes relating to PPP contracts outlined in this manual.

  • The relevant department in the federal entity will follow the procedures in this manual when planning or implementing a project under a PPP.

  • In the case of a conflict between the provisions in this manual or the implementation of the PPP contract and any other applicable law, the provisions of the federal law will prevail. The contract may be completed only after obtaining a formal exception or resolving the conflict.

  • Should any aspect of the manual be ambiguous or require further interpretation, it is advisable to consult the ministry for authoritative guidance.

  • The internal audit regulatory units in each federal entity and state audit institution or equivalent will be responsible for ensuring that federal entities apply the guidelines and principles in this manual. They will monitor any infringements or breaches and recommend internal controls and monitoring systems for the implementation of PPP projects.

  • Any PPP project started before the date of release of this manual should follow the previous manual. All new, planned, amended, renewed, or extended PPP projects evaluated or procured post the date of the release of this manual should follow this manual as per the law article (32).

C. Updates

The ministry will be responsible for regularly reviewing, updating, and amending the guidelines in this manual. Suggestions for updates or amendments can also be made by federal entities. If an amendment is approved, the ministry will commit to:

  • Consider additional modifications.
  • Update the relevant procedures.
  • Provide clear information to all federal entities about the updates.
  • Address any questions or inquiries about amending or updating the manual.

D. Training

To ensure the effective implementation of this manual, it is recommended that federal entities provide training for employees, either annually or when an updated version is released, whichever comes first.

Training can be provided via workshops to enhance understanding of the PPP project process.

 

 

I. OVERVIEW OF PPP

A public-private partnership is a collaborative arrangement between the public and private sectors to develop infrastructure projects and improve the quality of services being provided to the public. In a PPP, the public sector partners with a private sector partner to jointly plan, finance, construct, and/or operate/maintain an asset or service.

The private sector partner brings in their expertise, resources, and capital to the project, while the public sector partner provides oversight and regulatory support. PPPs are commonly used to deliver infrastructure and public services. The structure of a PPP can vary, but the key characteristics include:

A Financing

PPPs often involve the private sector partner providing financing for the project, in addition to design, construction, and operation.

B Risk sharing

PPPs involve the sharing of risks between the public and private partners. Both parties assume risks which are in line with their ability and appetite.

C Long-term commitment

PPPs are typically long-term agreements, often lasting several decades. However, the duration can vary according to the risk-return profile of the selected projects.

D Innovation

PPPs often involve the private sector in bringing new ideas, technology, and best practices to a project.

E Performance-based approach

PPPs often follow performance-based contracts, with payment tied to the achievement of specific performance targets.

F Focus on the end user

PPPs have a strong focus on the end user, with the goal of providing improved services or infrastructure to the public.

II. PPP TYPES AND MODELS

A. Types of PPPs

There are many variations and types of PPP agreements which depend on the nature of the project.

For any project, an appropriate PPP model can be identified and considered by answering three questions:

1. What is the type of the project?

Greenfield: A project to develop infrastructure on previously undeveloped land or build new infrastructure such as a highway, airport, hospital, or school. A greenfield project typically involves major capital expenditure (CAPEX) because all the necessary infrastructure must be built.

Brownfield: A project to rehabilitate existing infrastructure or to add new infrastructure. This can include upgrading or renovating an existing highway, airport, hospital, or school or adding new buildings or facilities to an existing site. Brownfield projects involve less CAPEX because the existing infrastructure can be reused or re-purposed. A brownfield project can also be a service that is currently provided by the government and needs quality and efficiency improvements.

2. What are the functions of the private partner?

Nine main functions are central to defining which PPP model to follow. These functions are typically assigned during the feasibility study and laid out in the contracting model. The following are the private partner's functions:

Design (D): Includes creating a detailed project plan, outlining the project's scope, and identifying key project milestones.

Build (B): When PPPs are used for new infrastructure assets, the private partner is typically required to build the asset and install all equipment.

 

Rehabilitate (R): When a PPP involves an existing asset, the private partner may be responsible for rehabilitating or expanding the asset.

Finance (F): When a PPP includes building or rehabilitating an asset, the private partner is typically also required to finance all or part of the capital and operational expenditures.

Maintain (M): Entails maintaining the infrastructure to a specified standard throughout the duration of the contract.

Own (O): The private partner owns an asset throughout the duration of the contract.

Transfer (T): Involves transferring the asset or the operations & maintenance of a particular project.

Lease (L): In some cases, the private partner leases assets to the public entity for the duration of the contract.

Operate (Op): A private partner's operating responsibilities to a PPP can vary widely depending on the nature of the underlying asset and associated service. For example, a private partner could be responsible for:

  • Operating an asset and providing a bulk service to a government off taker; for example, a bulk water treatment plant.
  • Operating an asset and providing services directly to users; for example, a water distribution system.
  • Providing support services, with the government agency retaining responsibility for delivering the public service to users; for example, a school building that includes janitorial service.

3. How is the private partner paid?

User pays PPP: The private partner provides a service to users and generates revenue by charging users for that service (according to the partnership contract).

Government pays PPP: The government is the sole source of revenue for the private partner. Government payments can depend on the asset or service meeting contractually defined performance standards.

Hybrid payments PPP: In certain cases, particularly when the revenues collected from end users are insufficient to cover the private partner costs and desired profits, a combination of the previously mentioned payment methods is utilized.

Table 1: PPP models, based on the above functions

ModelPrivate partner rolesDescription
DBROpMOLTF
DesignBuildRehabilitateOperateMaintainOwnLeaseTransferFinance
MANAGEMENT CONTRACT   XX    Typically, the private partner assumes specific responsibilities for a service.
LEASE CONTRACT   XX  XXThe government leases infrastructure that the private partner operates and maintains. (Transfer of assets is optional).

Note: "X" marks the private partner role.

B. Models of PPPs

PPP projects can take a variety of forms in terms of construction, operation, and financial and legal structures. This means that projects can be tailored to fit specific needs and meet desired outcomes. The following are the most common PPP models:

C. Exempted contracts

The guidelines outlined in this manual do not apply to the following contracts and scenarios:

Outsourcing contracts: An outsourcing contract is a legal agreement between an entity and an external service provider (“outsourcer”) in which the outsourcer agrees to perform certain tasks or provide certain services to the government. These tasks or services are typically ones the government would otherwise perform itself but chooses to outsource to save money, improve efficiency, or focus on core competencies.

Outsourcing contracts can cover a wide range of services, including manufacturing, IT support, customer service, and research and development. They can be long-term or short-term agreements and often include specific terms and conditions for performance, payment, and dispute resolution — there is no risk sharing for these types of contracts.

Partnership contracts concluded before the entry into force of Law in 2023: Represents any feasibility study initiated for a PPP project or any ongoing contract that was issued before the law and the manual came into force. The exemption doesn’t apply to the renewal, amendment, or extension of a project agreement as per article (32) of the law.

Projects whose value is less than the defined threshold: Represents any project valued below AED 150 million, as stated in chapter 4 section 1 of this manual.

Procurement contracts related to national security: Represents contract related to defence equipment and technology, cybersecurity solutions, intelligence and surveillance systems, critical infrastructure, emergency services and supplies, and research and development.

Federal entities, sectors, and projects that are excluded by cabinet decision: Represents any project or category of projects that have been officially excluded by the cabinet.

Privatization: Refers to full ownership of assets and services by the private partner. The following table highlights the main differences between PPP projects and privatization — there is full transfer of risk in privatization.

Table 2: Conditions of ownership of an asset under privatization versus a PPP

TERMDEFINITION
The stateThe United Arab Emirates.
The governmentThe United Arab Emirates government.

Differentiating between outsourcing, privatization, and a PPP

PPP projects are the middle ground between privatization and outsourcing. The following highlights each player's level of participation in different types of projects.

 

 

 

I. OVERVIEW

A well-defined governance structure with clear roles and responsibilities for stakeholders and their interactions is essential for enhancing transparency, promoting accountability, and ensuring that private sector involvement provides the maximum benefits to society.

The organization for economic cooperation and development recommends following three principles for the public governance of PPPs:

  • Establish a clear, predictable, and legitimate institutional framework supported by competent and well-resourced authorities.
  • Ground the selection of public private partnerships in value for money.
  • Use the budgetary process transparently to minimize fiscal risks and ensure the integrity of the procurement process.

II. GOVERNANCE STRUCTURE

The governance structure in this manual covers only federal and federal-local projects. It aligns with federal law no. (12) of 2023, which regulates partnerships between the federal public sector and the private sector.

The state adopts a central governance model for its federal and federal-local projects. In each project, the stakeholders are the cabinet, the general budget committee, the ministry, the PPP section working under the ministry, the concerned federal entity and the project team.

 

 

III. INSTITUTIONAL ROLES AND RESPONSIBILITIES

Each entity is assigned multiple roles and responsibilities throughout the PPP project life cycle.

Table 1: Roles and responsibilities

TERMDEFINITION
GDP (gross domestic product)The monetary value of all the goods and services produced within a country's borders in a specific period of time.
Project internal rate of return (IRR)The discount rate at which the net present value of all cash flows (positive and negative) from a project or investment equals zero. It is used to evaluate the attractiveness of a project or investment (in general, if the IRR exceeds the cost of capital/project hurdle rate1/project financing cost, it adds value).

LEGEND: I Informed C Consulted A Accountable R Responsible

A. Cabinet

The cabinet:

  • Decides on the final approval or rejection of the PPP plan.
  • Decides on the final approval or rejection of the feasibility study of PPP projects.
  • Decides on the final approval or rejection of the selected bidder(s).
  • Grants additional incentives or exemptions to concerned federal entities and private sector players.

B. General budget committee

The general budget committee:

  • Decides on the approval or rejection of the PPP plan, including budget allocation if required.
  • Decides on the approval or rejection of the feasibility study, only in case additional budget is required.
  • Decides on the approval or rejection of selected bidder(s), only in case additional budget is required.

C. Ministry

The ministry:

  • Prepares, issues, and amends manuals and all forms and documents related to PPP projects.

  • Suggests updates to the legislation regulating PPP projects in accordance with international best practices.

  • Works to provide the appropriate environment to attract the private sector to participate in PPP projects and overcome difficulties that may hinder the success of PPP projects.

  • Acts as an intermediary between the concerned federal entity, general budget committee and cabinet.

  • Assists federal entities offering PPP projects in accordance with the law, if necessary, and encourages them to consider all projects for PPP.

  • Assigns a point of contact to give project teams guidance, relevant tools and templates, and to ensure the guidelines are being followed.

  • Proposes PPP projects to concerned federal entities to enable them to list potential PPP projects.

  • Reviews project prioritization.

  • Reviews pre-feasibility studies and overall PPP plan.

  • Studies and evaluates offers and feasibility studies submitted by the federal entities and the private sector and determines the feasibility of offering them as PPP projects.

  • Directs concerned federal entities with regard to the mechanism for preparing feasibility studies and other studies related to evaluating PPP projects.

  • Advises concerned federal entities in relation to offering and implementing PPP projects.

  • Develops a data record for PPP projects.

  • Periodically measures the success of PPP projects and submits reports to the general budget committee.

  • Acts as a knowledge center, collating and disseminating information about PPPs, thus ensuring that knowledge is shared across federal entities and made available to the public.

  • Prioritizes the concerned federal entity to start rolling out PPP plans development.

D. Concerned federal entities

The concerned federal entities:

  • Identify potential PPP projects and assess them against various criteria.

  • Prioritize PPP projects and develop pre-feasibility studies.

  • Set up a project team, including members from the relevant federal entity, that will be responsible for developing project's feasibility studies and procurement documents.

  • Suggest PPP projects and prepare all necessary studies to evaluate financial, economic, technical, and social feasibility, risks, and effects. This is done in accordance with the requirements of this manual. (These analyses should be performed by the project team and reviewed by the concerned federal entity).

  • Prepare the initial budget for the PPP project in cooperation with the...