FUJAIRAH MUNICIPALITY BUILDING MATERIAL & RESEARCH LABORATORY

 

 

LIST OF REPORT DURATION

 

S.No.NAME OF TESTREPORTING DURATION (After payment)
1SITE VISIT05 DAYS (DEPEND ON THE LOCATION)
2TRIAL PIL08 DAYS (DEPEND ON THE JECIPI)
3SOIL INVESTIGATION15 DAYS (DEPEND ON THE BOREHOLE)
4PROCTOR & DENSITY5 DAYS
5DENSITYURGENT (3DAYS)
5 DAYS
6PLATE ROAD TEST3 DAYS
7AGGREGATE TESTDEPEND ON THE SAMPLE & TET REQUIRED
8MIX DESIGN10 DAYS
9CUBE TESTURGENT 1 DAY
4 DAYS
10SCHMIDT HAMMER3 DAYS
11CORE TEST1 WEEK
12STEEL TEST05 DAYS

 

 

 

PREPARED BY:

 

CHECKED BY:

 

 

 