Up to 3 habitable levels

PCFC- Entity (Business Unit) Name:Trakhees (Dept. of Planning & Development)
Department Name:Civil Engineering Department (CED)
Green Building Submission - Sample Format

REGULATION

VILLAS & RESIDENTIAL DEVELOPMENTS [upto 3 levels]

SUBMISSION PHASE

Design Submissions [NOC-BP]

Introduction

This document is being issued by Trakhees Sustainability department in the interest of the stakeholders so as to enable them to make a proper submission. Most importantly this document is to provide the stakeholders with a broad perspective of the type of evidence Trakhees Sustainability Department expects in the process of review of their submissions prior to approvals.

Scope

This general guideline is applicable to all the stakeholders involved in the Green building projects within Trakhees - PCFC / Dubai World business units

Aim

The aim of this document is to highlight the importance of supporting documentation and evidence in order to establish the fulfilment of a credit in the project. It is important that the project stakeholders comprising the client, Architectural & Engineering consultant, green building specialist(if involved in the project) and others together are able to demonstrate the compliance to the Regulation and its requirements in a clear and consistent manner. This entails supporting documentation comprising calculations, reports, photographs etc. depending on the nature of the credit

Sections

This guideline is given in the form of a several slides each representing a specific section of the regulation

Conclusion

This guideline provides a broad framework of the documentation involved in actual implementation of the green building principles and is intended purely to familiarize the client and the other stakeholders on the need to adequately demonstrate the compliance through several mechanisms. While this serves to throw light on the basic requirements, the stakeholders can exercise their option and judgment in including other forms of evidence that they feel are crucial in demonstrating the compliance

This document (Submission sample format ) has been prepared to serve as a guideline (assistance) for the consultants and contractors to prepare their submission packages to Trakhees. This should not be seen as an all inclusive requirement of Trakhees-Trakhees or as a set of instructions which if complied with would lead to automatic approval from the authority. It will be the sole responsibility of the consultant and the contractor to ascertain the actual requirements and expectations of the regulations and ensure that the submissions that they make to the authorities are complete with ALL the evidence deemed essential to demonstrate the compliance.

This guideline does not bind Trakhees in limiting its response to the elements of this document. Trakhees has the right to ask additional information / clarification / documentation that it may feel essential for demonstrating the compliance.

Should you need any assistance please do not hesitate to contact the department

GENERAL GUIDELINES
  1. Fill out the Submission Booklet
  2. Collate the evidence required as per the Regulation.
  3. Suggested formats / documentation as highlighted in this document
  4. Put together the submission package in a structured manner as illustrated
GENERAL GUIDELINES
  1. Fill out the Submission Booklet
  2. Collate the evidence required as per regulation.
  3. Suggested formats / documentation as highlighted in this document
  4. Put together the submission package in a structured manner as illustrated
SUBMISSION BOOKLET

APPLICABILITY

Regulation:GB 8. Green Building Regulations-Villas & Residential Developments up to 3 habitable Floors
Procedure:EHS-GBP-09 Procedure for NOC-BP Green Building Submission (Villas)

This booklet comprises the checklists for various elements of the green building regulations and is meant to be used by the stakeholders concerned for providing accurate information on the project. It comprises the following parts

Part-1Project Summary
Part-2Checklist for Green Building Submission

Disclaimer

This checklist has been developed for project teams to use when compiling the submission documentation for EHS Review /Assessment

A completed version of this checklist must be included within the Main Submission.

The accuracy and completeness of the submission is entirely the responsibility of the project team. EHS will not be held accountable for incorrect or incomplete submissions sent for assessment.

A1

Integrated Design Approach for achieving energy savings
MEETING NO. 10– DESIGN MEETING

Minutes of Meeting – Date stamped Photo

3.0EHS Green Building Regulations
Minimize electricity consumption
  
3.1EHS Requirement for external envelope :
Compliance with Thermal Insulation System and Best Practices Energy conservation methods for BOTH Air-conditioned and Non Air-Conditioned buildings.
Solution for AC spaces:
External walls :
KC stated that there is several options for thermal
INFO
KC
DD Stage

Minutes of Meeting Copy

A2 Post Contract Green Briefing

A formal letter from the client / developer confirming that a Green brief presentation would be a part of the Project Kick-off and the specific topics proposed to be discussed is attached to this submission.

Format ...Undertaking letter

Ports Costums and Free Zone Corporation Trakhees Green Building Section PO Box 17000 Dubai, United Arab Emirates

Sub: Undertaking letter for a green brief presentation as part of the Project Kick-off meeting for the Construction of

B1

Compliance with Thermal Insulation system & Best Practices Energy Conservation

Extract from Specifications

SPECIFICATION FOR INSULATION:

To be read in conjunction with Section _ and other related section of the Specification, Preliminaries / Construction Specifications and Contract Conditions.

  1. EXTERNAL WALLS
  • Insulation System:

SPECIFICATION FOR GLAZING:

To be read in conjunction with Section _ and other related section of the Specification, Preliminaries / Construction Specifications and Contract Conditions.

  1. EXTERNAL WINDOWS & DOORS:
  • Glazing system:

B1

Compliance with Thermal Insulation system & Best Practices Energy Conservation

Building details

DETAIL 1

ROOF BUILT-UP MATERIALS

R External Surface Resistance = 0.040 m2.K /W k Mineral fibre = 0.035 W/m.K k Plywood = 0.130 W/m.K k Gypsum PlasterBoard (800 kg/m3) = 0.250 W/m.I R Internal Surface Resistance = 0.125 m.K /W

Roof Built-up U value = 0.244 W/m2.K

DETAIL 2

ROOF FLOOR BUILT-UP MATERIALS

R Internal Surface Resistance = 0.125 m2.K /W k Extruded Polystyrene Foam = 0.030 W/m.K k Protective Screed (2000 kg/m3) = 1.400 W/m.K k Reinforced Concrete (2400 kg/m3) = 2.500 W/m.K k Cement Plaster (2000 kg/m3) = 1.600 W/m.K R Internal Surface Resistance = 0.125 m2.K /W

Roof Floor U value = 0.479 W/m2.K

B1
Compliance with Thermal Insulation system & Best Practices Energy Conservation
Building details
WALL BUILT-UP MATERIALS

R External Surface Resistance = 0.059 m2.K /W

k Rockwool (140 kg/m3) = 0.035 W/m.K

k Aggregate Cement Block (1400 kg/m3) = 0.63 W/m.K

k Cement Plaster (2000 kg/m3) = 1.600 W/m.K

R Internal Surface Resistance = 0.125 m2.K /W

Wall U value = 0.272 W/m2.K

BASEMENT WALL BUILT-UP MATERIALS

R External Surface Resistance = 0.050 m2.K /W

k Leveling Screed (2000 kg/m3) = 1.400 W/m.K

k Reinforced Concrete (2400 kg/m3) = 2.500 W/m.K

k Extruded Polystyrene Foam = 0.030 W/m2.K

k Polymer Bitumen Based Membrane = 0.190 W/m2.K

R Internal Surface Resistance = 0.098 m2.K /W

Foundation Floor U value = 0.57 W/m2.K

B1

Compliance with Thermal Insulation system & Best Practices Energy Conservation
Envelope U (thermal) Calculations and Sections
EXTERNAL WALL SECNO1
LAYER NOTHK. inDESCRIPTIONSDENSITY lb/ft³R °F ft².h/BtuMass lb/ft²
1.001.000Out side surface resistance0.0000.250 
442.023.4002 IN RHP (Roof APPLY.) Rigid Polyurethane Insulation Panel with Steel & Alu.facing Sandwich Panel (RH-4"Box Rib) Registered 20072.18821.3340.620
ROOFNO4
LAYER NOTHK. inDESCRIPTIONSDENSITY lb/ft³R °F ft².h/BtuMass lb/ft²
1.001.0001 IN Outside surface resistance0.0000.250 
6.002.000Terrazzo Tiles160.0000.16026.667

B1

Compliance with Thermal Insulation system & Best Practices Energy Consn
Envelope Sections - Wall
INSULATED BLOCK WALL DETAIL
Layer No.Thickness
mm
External WallDensity
kg/m³
Resistance
m²K/W
Mass
kg/m³
2.000 Outside Surface Film Resistance for Walls0.0000.0440.000
14.01035.00Sand Stone2000.0000.028700.000
Envelope Sections - Roof
Layer No.Thickness
mm
RoofDensity
kg/m³
Resistance
m²K/W
Mass
kg/m²
4.000 Outside Surface Film Resistance for Roofs0.0000.0550.000
Glazing Details / Sections
 SCHEDULE OF WINDOWS & WALLS DATATSUH05
TOTAL GLASS OPENING AREAFT SQ.593.86
Wall Details

Outside Surface Color ... Dark

Absorptivity ... 0.900

Overall U-Value ... 0.069 BTU/(hr-ft²·°F)

HAP Input summary sheet

Wall Layers Details (Inside to Outside)

LayersThickness
in
Density
lb/ft³
Specific Ht.
BTU / (lb - °F)
R-Value
(hr-ft²·°F)/BTU
Weight
lb/ft²
Inside surface resistance0.0000.00.000.680000.0
Roof Details

Outside Surface Color ... Dark

Absorptivity ... 0.900

Overall U-Value ... 0.043 BTU/(hr-ft²·°F)

Roof Layers Details (Inside to Outside)

LayersThickness
in
Density
lb/ft³
Specific Ht.
BTU / (lb - °F)
R-Value
(hr-ft²·°F)/BTU
Weight
lb/ft²
Inside surface resistance0.0000.00.000.250000.0
HAP Input summary sheet
Window Details:

Detailed Input No Height 11.15 ft Width 9.51 ft Overall U-Value 0.300 BTU/(hr-ft² °F) Overall Shade Coefficient 0.240

CW-1C
Window Details:

Detailed Input No Height 11.15 ft Width 22.31 ft Overall U-Value 0.300 BTU/(hr-ft² °F) Overall Shade Coefficient 0.240

W-1
Window Details:

Detailed Input No Height 8.37 ft Width 2.62 ft Overall U-Value 0.300 BTU/(hr-ft² °F) Overall Shade Coefficient 0.240

HAP Input summary sheet
Line Sizing Summary for FCU-F1

Project Name: S...

Prepared by: THOE

10/06/2014

03:13PM

Air System Information

Air System Name ... FCU-F1

Equipment Class ... CW AHU

Air System Type ... SZCAV

Number of zones ... 1

Floor Area ... 118.0 m²

Location ... Dubai, United Arab Emirates

Sizing Calculation Information

Zone and Space Sizing Method:

Zone L/s ... Sum of space airflow rates

Space L/s ... Individual peak space loads

Calculation Months ... Jan to Dec

Sizing Data ... Calculated

Zone Sizing Data
Zone NameMaximum Cooling Sensible (kW)Design Air Flow (L/s)Minimum Air Flow (L/s)Time of Peak LoadMaximum Heating Load (kW)Zone Floor Area (m²)Zone L/(s-m²)
Zone 110.3942942Jun 17000.7118.07.98
Zone Terminal Sizing Data

No Zone Terminal Sizing Data required for this system.

Space Loads and Airflows
Zone Name / Space NameMult.Cooling Sensible (kW)Time of LoadAir Flow (L/s)Heating Load (kW)Floor Area (m²)Space L/(s-m²)
Zone 1       
B2 Limiting / Reversing Thermal Bridges

Compliance Strategy:

Compliance Strategies

The following strategy has been considered in the design to minimize the thermal bridging.

  1. The continuity of polyurethane thermal insulation has been achieved between roof and wall to avoid thermal bridges in the roof and wall joint. Figure 1.a and 1.b shows cases for continuous and non-continuous insulation for Wall to ceiling.

Thermal Bridging Concept Report

Thermal Bridging Strategy

All the Non-Repeating Thermal Bridges (i.e. junctions of floor and roof with the external wall, and details around window and door openings) shall be reduced by designing all insulating building components to work in unison and by creating barrier to heat flow in building envelope. The insulation shall be reviewed in relation to its location within wall and roofs, its interface/connectivity with surrounding or penetration materials and connectivity within & between insulating components.

Following are the general strategies to be adopted at a minimum in order to achieve minimize thermal bridges:

  • All the gaps between ceiling and walls shall be sealed with either plaster, adhesive or flexible sealant.
  • All the gaps between walls and floor shall be sealed with either plaster, adhesive or flexible sealant.
  • All the penetrations through air barrier shall be sealed by using a flexible sealant.
  • All the penetrations around windows & door openings shall be sealed by using a flexible sealant.
  • Partially filled insulation shall be secured firmly against inner leaf of wall.
  • Provide full depth insulation between and over joists extending to inner edge of wall.
  • Cavities shall be kept clean of mortar snots and other debris during construction.
  • Provide a continuous air barrier of masonry inner leaf with wet-finish plaster alongside of internal wall, floor and ceilings. Apply flexible sealant to all interfaces between internal air barriers and window/door frames.

Drawings for acceptable construction details shall be prepared by the contractor and approval has to be taken from the consultant prior to proceed for the construction in relevance to the above requirements.

B3 Envelope Tightness (Prescriptive Based)
Letter of Undertaking

Subject: Undertaking letter for Thermal Imaging

We hereby undertake that a Thermal imaging for the Air-conditioned spaces will be carried out for the project. A method statement for the proposed works before and after the test will be submitted to EHS Green Building Department, upon appointment of the Thermal Imaging sub-contractor.

Method Statement – From Qualified Thermographer
Extract from Specification
2.7 Thermal Imaging

Contractor shall carryout thermal imaging for the building interior to identify the building defects caused by cracks, poor insulation or shoddy construction. Appropriate corrective actions should be taken by the contractor to fix the air leaks identified by the exercise. Contractor has to prepare detailed method statement prior to and after the test and get approval from consultant.

B4 Envelope Tightness (Performance Based)

THIS IS A VOLUNTARY CREDIT ...

Letter of Undertaking

Method Statement – From Qualified Thermographer

Extract from Specification

B5

Efficient sizing of HVAC system

HVAC

Heat Load Calculations

Office-1

  1. General Details:

Floor Area ... 82.9 ft² Avg. Ceiling Height ... 13.2 ft Building Weight ... 80.0 lb/ft²

1.1. OA Ventilation Requirements:

Space Usage ... User-Defined OA Requirement 1 ... 19.0 CFM OA Requirement 2 ... 0.0 CFM Space Usage Defaults ... ASHRAE Std 62.1-2004

  1. Internals:

2.1. Overhead Lighting:

Fixture Type ... Recessed (Unvented) Wattage ... 1.86 W/ft² Ballast Multiplier ... 1.25 Schedule ... Lighting

2.2. Task Lighting:

Wattage ... 0.00 W/ft² Schedule ... None

2.3. Electrical Equipment:

Wattage ... 0.0 Watts Schedule ... None

2.4. People:

Occupancy ... 2.0 People Activity Level ... Office Work Sensible ... 245.0 BTU/hr/person Latent ... 205.1 BTU/hr/person Schedule ... People

2.5. Miscellaneous Loads:

Sensible ... 0 BTU/hr Schedule ... None Latent ... 0 BTU/hr Schedule ... None

B5 Efficient sizing of HVAC system
ROOF-G
Roof Details

Outside Surface Color ... Dark

Absorptivity ... 0.900

Overall U-Value ... 0.244 W/(m²·°K)

Heat load estimate should provide proof of the ENVELOPE U values being used in the project.

Input sheet of the software can be submitted

Roof Layers Details (Inside to Outside)

LayersThickness
mm
Density
kg/m³
Specific Ht.
kJ / (kg - °K)
R-Value
(m²·°K)/W
Weight
kg/m²
Inside surface resistance0.0000.00.000.120640.0
WALL-G
Wall Details

Outside Surface Color ... Dark

Absorptivity ... 0.900

Overall U-Value ... 0.272 W/(m²·°K)

Wall Layers Details (Inside to Outside)

LayersThickness
mm
Density
kg/m³
Specific Ht.
kJ / (kg - °K)
R-Value
(m²·°K)/W
Weight
kg/m²
Inside surface resistance0.0000.00.000.044030.0
B5 Efficient sizing of HVAC system
Schedule of Equipment
8.11.1. SCHEDULE OF VRF FRESH AIR HANDLING UNITS
FAHU REFSPACE SERVEDSUPPLY AIR FLOWESPAIR ON COIL - DB / WBAIR OFF COIL - DB / WBTOTAL COOLING CAPACITYSENSIBLE COOLING CAPACITYQTYTYPE & SPEED CONTROL
L/sPa°C°CKWKWNos.
FAHU-01GROUND & FIRST FLOOR38015046.0 / 30.013.0 / 12.622.011.001CONSTANT
NOTES:
  1. External Static pressure mentioned are indicative only, MEP contractor to recalculate the same as per exact site duct routing installation and get the approval of the consultant prior to placing order of the equipment.
  2. All AHUs / FAHU exposed to ambient shall also be of 50 mm double skin construction. All the units shall have the following sections complying with specification documentation to their respective area of concern. i. Supply Fan section complete with fan section, fan motor, drive & belts, flexible connections, vibration isolators, inside light(s). ii. Coil section with cooling coil as detailed. iii. Filters as per Schedule and Specification
  3. Noise levels should not exceed the specified and the contractor shall provide for attenuators and vibration isolation to achieve the specified NC levels inside the occupied spaces.
  4. All Air Handling Units shall have double skin drain pans with outlets at the bottom
  5. Provide filter manometers and audible/visual alarms for filter dirty indication for all Pre, Panel and Bag filters.
  6. Cooling coils shall not be oversized and shall be copper / aluminium construction and shall be pressure rated suitably for the application.
  7. Fans shall be capable of producing +10% more air of the peak design air volumes at the required static & the fan motor should be selected accordingly. Selected Fan duty point should be in the middle of Fan Performance Curve. Sand trap louvers for fresh air shall be provided with plasticized wire mesh & Pre-filter.

B6

Central Air-conditioning Units with Energy Recovery Units (ERV)
Ventilation / Exhaust Air Calculations

CALCULATIONS OF OUTDOOR AIR VENTILATION RATES

Zone IdentificationStandard Case: ASHRAE Std 62.1 -2007 Verification Rate Procedure
SL NOZone (AHU's)Area (SQFT)Occupancy (Nos.)People Outdoor Air rate (cfm / person)People Outdoor Air Qty (cfm)Breathing Zone Outdoor Air Flow Vbz / (cfm)Table 6-2 Zone air distribution effectiveness*Zone Outdoor air flow Voz / (cfm)Table 6-3 System Ventilation Efficiency EvOutdoor Air intake Flow Vot/cfmOutdoor Air intake Flow ( Required ) Vot/cfm
Air Balancing Calculations / Table

AIR BALANCING CALCULATION

S.NoDescriptionFCU Ref.Floor Area
Sqm
Occupants
Nos
Fresh Air as per...