This guide aims to highlight in details the requirement for developing an Environmental Impact Assessment Study in the Emirate of Ras Al Khaimah for review and evaluation by EPDA; the competent authority in the field of environment.
In producing the report, EIA consultant should:
- Adhere to EPDA requirements and ‘Standard table of contents’ in the preparation of the EIA report.
- Verify the EIA report in line with EPDA chapter-by-chapter recommendations.
- Submit a filled and signed critique along with the EIA report.
The main purpose of an EIA report is to clearly list and describe what is assessed and recommended. Each of environmental issues defined in the TOR or identified during the EIA study, has to be assessed in relation to: (i) environmental impact, (ii) possible and recommended mitigation measures, and (iii) recommended monitoring requirements.
Of utmost importance is the effective communication of assessment findings and recommendations. The findings of an EIA study need to be documented in a clear and concise manner devoid of unnecessary technical details. The usefulness of an EIA report is measured by how the potential problems are foreseen and addressed with adequate and straightforward answers and proposals.
The EIA report is the responsibility of the EIA consultant.
The following table provides the recommended structure for an EIA report to be submitted to EPDA. Each section may be expanded to include other aspects of relevance to the project in question.
General
The report should include:
i. Title Page,
ii. Table of Contents,
iii. List of tables,
iv. List of Figures,
v. List of Pictures,
vi. List of Maps and
vii. Table of Abbreviations, which should be kept to a minimum within the body of the report.
| Chapter No | Title | Contents |
| 1 | Executive Summary |
(1.1) Project Description (1.2) Findings |
The executive summary should be regarded as a non-technical résumé of the findings and recommendations of the EIA. The executive summary should be in English and Arabic, and include the following two sections:
A short description of the proposed development project along with sufficiently detailed description of how significant environmental issues will be resolved; enough to allow the reader to grasp its importance and scope.
No general conclusion or recommendations concerning the overall development project are to be given. Findings in relation to the environmental issues defined in the TOR or identified during the EIA must be summarized in relation to:
- The assessed environmental impacts.
- Recommended mitigation measures.
- Recommended monitoring program.
Environmental impacts that irreversible or threaten Fauna or Flora, environmental quality and sustainable development should be highlighted. The overall findings may be summarized in a table or any other effective and simple visual presentations of the type and magnitude of the impacts.
This chapter should include data in relation to the undertaking of the EIA. The chapter requires three (3) sections:
Name of the firm, address, telephone and fax number, name and designation of contact person responsible for the project, other projects subject to EIA, which have been carried out, are being carried out, and/or will be carried out.
Name of the firm, address, telephone and fax number, list of team members involved in the preparation of the report and their field of expertise, list of EIA reports, which have been carried out.
Underlying principle of the project along with a review of similar projects and methods used therein to identify, predict and evaluate impacts. This section should also include the purpose and an overview of the report.
This chapter should include an explanation of the legislative basis for the EIA, including the process of under which the current EIA study is being produced. List of relevant federal and local legislation as well as international conventions and treaties maybe applicable to the project.
This chapter should include a description of the proposed project with a clear explanation for the need, content and scope of the project. The chapter is divided into four (4) sections:
Present a short argumentation for the need for the project and its compatibility with national development and environmental strategies. The argument should include identification of the clients and potential customers of the project and a listing of project activities that are likely to cause significant impacts to the environmental resources.
This section introduces the project concept and the intentions of the project proponent. Each phase of project activity should be described separately. Planned or possible future expansions should also be described. Potential accident or hazard scenarios covered in the risk assessment should be based on the characteristics of the project and the history of accidents at similar types of facilities would be an added benefit.
This section should make it possible to assess the existing location and environment in and around the project area. The section should consist mainly of location maps, timeline and other visual information, but should also include a brief site description, including the pertinent features in the project area.
The geographical and visual information provided for the location should include, as much as possible:
- Photographs of the existing environment in the project's and surrounding area.
- Location, including longitude/latitude or UTM co-ordinate and geographic boundaries of the project area and the assessment of area using the “Geographic Information Systems – Data Management Standards” published by EPDA.
- Local plan development and requirements.
- Location of nearby land owned or leased by the project proponent.
- Land use and existing environment of project site and surrounding area.
- Ongoing developments in the same area.
- Position and distance of nearest protected area/sensitive or undisturbed habitat.
- Drainage/hydrology.
- Slope map derived from 1:10.000 topographic map or larger.
The consultant is also expected to provide additional information such as:
- Project plan.
- Visualization, for example before/after.
- Other land ownership in surrounding areas.
This section should include an exact description of the status of implementation of the project. Is the project on the planning stage? Has implementation begun and I so, which activities have been undertaken when and where? The section should also include a concise overview of the approval procedures for the project. What approvals are needed and when? What approvals have already been received submitted and/or will be submitted, and for which authority?
This chapter should include a description of the current status of the environment with specific emphasis on the components that maybe affected by several or any of the project's activities. The chapter is divided into two (2) sections:
Description of the relevant existing physical, biological and socio-economic conditions within the project area supported by maps and photographs that can be utilized as a reference of the spatial data presented in this chapter. “General Guidelines for Submission of Baseline Environmental Data” pamphlet issued by EPDA should be adhered to as far as the data collection methods, quality and ownership while surveying as well as data formats and elements while reporting on different fields.
Description of all environmental components those are likely to be significantly affected by the execution of the project. This should include direct and indirect effects on the components of concern.
This chapter should include impact assessments of the environmental issues identified by the scoping exercise and laid down in the TOR for the EIA. If additional environmental issues are identified during the EIA study, they should also be included and assessed. The chapter contains three (3) sections:
This section outlines and describes in brief the impacts that have been evaluated to be the most likely and significant environmental impacts of the project. The top key impacts included in this section are later evaluated and documented in detail in section (iii) of this chapter.
This section includes the EIA matrix and provides an overview of all significant environmental impacts evaluated in the EIA study. EIA should be divided according to the project cycle, i.e. (i) exploration and construction/implementation phase, (ii) operation, production and maintenance phase, and (iii) decommissioning phase.
All of the environmental impacts include in the EIA study should be assessed according to the criteria below and the scores shown in a matrix or a figure:
- The magnitude of change/effect, which is a measure of the importance in relation to the spatial boundaries. The following scale should be used: (1) change/effect only within the project site, (2) change/effect to local conditions and/or to areas immediately outside, (3) regional/national/international change/effect. Before each number place a + if the impact would beneficial.
- The permanence of the impact, which defines whether the condition is temporary or permanent. Scale: (1) no change/not applicable, (2) temporary;
(3) permanent. Before each number place a + if the impact would be beneficial.
- The reversibility of the condition, which defines whether the condition can be changed and is a measure of the control over the effect of the condition. Scale:
(1) no change/not applicable, (2) reversible, (3) irreversible.
- To what extent the impact is cumulative, which is a measure of whether the effect will have a single direct effect or whether there will be a cumulative effect over time, or a synergistic effect with other conditions. Scale: (1) no change/not applicable, (2) non-cumulative/single, (3) cumulative. Before each number place + if the impact would be beneficial.
It is essential to note that no further ranking and/or manipulation of the scores given will be accepted. Values in cells are rankings (the scales are ordinal and impacts should not be added, subtracted, multiplied or divided), therefore, comparison of cells and attempts to add or mathematically transform these ordinal scores must be avoided. For example, a score of 10 in one cell is of higher rank than the score of 5 in another cell, but it is not valid to conclude that the former is twice as important. The prime value of an interaction matrix is illustrative rather than analytical.
Each of the environmental impacts listed in the EIA matrix should be assessed in this section.
The top listed impacts (in section 6.1) should be prioritized and assessed in detail (i.e. documentation of the cause and effect, relationships between most- impact- generating project activities and the environmental component, identification of secondary or higher order effects, with clearly defined pathways of impacts from higher order effects, etc.), while the remaining impacts listed in the matrix should be assessed in less detail.
For each environmental impact, the specific methodology of review, data collection and analysis should be described and the results of the analysis and conclusions of the assessment presented.
The methodologies used for the review, data collection and analysis are to be clearly stated and documented.
The results of the analysis and conclusion of the assessments have to be presented in a clear and concise manner. The conclusion must clearly and specifically summarize the results of the analysis and must correspond to the scores given in the EIA matrix. It is important in the analysis and conclusions to use and refer to existing environmental guidelines and published literature/case studies.
This chapter should include recommended and possible mitigation measures for the environmental impacts assessed in chapter 6 of the EIA report. Adverse impacts that cannot be mitigated must be highlighted. The chapter includes three (3) sections:
The section should include a priority list of the most important mitigation measures that the project proponent should adopt, as recommended by the consultant. It is important that the EIA consultant works closely with the project proponent in preparing the shortlist of recommended mitigation measures in order to ensure that the recommendations are practical, cost-effective and at the same time sufficient to mitigate the impact.
The recommended mitigation measures will provide the basis for environmental conditions and mitigation measures to be agreed upon by the project proponent and EPDA.
Each recommended mitigation measure should be described in detail. This includes for example when and how the recommended mitigation measures should be incorporated into the detailed project design and in the construction contract documents, and information regarding its prior effective use, the range of environmental conditions under which it is effective, and the level of skill required to operate or maintain the technology.
Recommendations such as 'a proper handling and responsible management of fertilizer and pesticides' or ' proper management of effluent from the factory' Are Not Acceptable.
Cost-estimations for all proposed mitigation measures have to be provided, as well as a comparison of each option to the other options. Documentation on the review, data collection and analysis and assessment of the recommended mitigation measures needs to be provided. The existing environmental guidelines available at EPDA, FEA and other sources should be referred to.
Justification for the recommended option(s) must include an explanation of how its cost was weighed against the projected reduction in value of environmental resource.
In this section, additional mitigation measures should be described. These additional mitigation measures includes measures that:
- Should be implemented, even though they are directed towards adverse environmental impacts of a minor significance.
- Have been analyzed and assessed, but for some reasons, e.g. cost- effectiveness, were considered inappropriate to implement.
- Are indirectly linked to the development project, for example, rehabilitation efforts in adjacent areas.
Where a potential impact has been identified, a full and detailed Environmental Management Plans (EMPs) and corresponding commitment aimed at managing that impact to an acceptable performance level is to be included in this section. The EMP and commitment statement should describe:
1. the nature of the work to be undertaken.
2. the objectives to met.
3. who is responsible for the EMP/commitment?
4. who will undertake the work?
5. when, or at which stage of Project development, the work is to be undertaken.
6. where the work is to be undertaken.
7. who is responsible for monitoring and recording that the EMP/commitment is properly fulfilled?
8. Who is responsible for reporting that the EMP/commitment has been met?
Each EMP/commitment should be numbered in the body of the report. It should also be designed to allow interested parties to determine whether all relevant issues have been addressed. The EMPs/commitments should be indexed to permit quick referral to the relevant sections in the body of the report.
This chapter should enlist alternatives to the main technology/philosophy used in the project. All assumptions must be clearly stated in the entire alternative considered. At lease, two alternatives must be explored in depth while others could be covered in lesser detail. No-Development option and Alternative Route/Design/Location Options must be presented.
Justification of the recommended option/design/location must be offered in terms of technology, cost-effectiveness and implementation period along side the predicted environmental impacts.
This chapter should describe the recommended schedule and monitoring program for:
- Compliance of the recommended mitigation measures (as described in section 6.1).
- The residual impacts of the project on the environment. This chapter includes two (2) sections:
This section clearly outlines methods to monitor the compliance of all the recommended mitigation measures. The methods should be designed in such a way that it will be possible for the project proponent to demonstrate that the mitigation measures are effectively implemented. The methods should include detail on how compliance of the recommended mitigation measures should be monitored, by whom and how often.
The recommended methods should include:
- The location of mitigation measures and monitoring sites maps and photographs.
- Time schedule for monitoring program, including frequency of site visits in relation to the project duration.
- Requirements of periodic reporting.
- How and when audit/review of results should be undertaken.
- How to check that actual implementation of recommended mitigation measures has taken place.
This section should clearly describe a recommended monitoring program that will measure key residual environmental impacts of the project...