Unified UAE Legislation Database
Machine-read text — original PDF attached

Guide for Tire Repair Workshops

Status

In force

Issuing Authority

RAK Environment Protection and Development Authority

The department is responsible for the maintenance and repair of tyres in a clean and safe environment, in accordance with the following safety requirements:

Frame repair:

  • We repair any dents in the car’s bodywork before setting off on a long journey.
  • The tyre must be removed from the wheel to check for any internal damage, in order to detect any sudden tyre failure.
  • The use of external seals to prevent liquid leakage is not always necessary.
  • British Standard BS AU 159 stipulates that the frame must be removed from the metal structure to ascertain whether it is sound; the use of the ‘Seline’ liquid frame is not compatible with this assessment but is considered suitable for permanent repair.

The metal frame structure:

  • Not every wheel rim is suitable for use without an inner tube and an inner tube.
  • For every tubular tyre, the inner tube must be fitted correctly; even in the case of a tubeless tyre, the inner tube must be fitted correctly, with the correct size inner tube, and a non-radial tyre inner tube can be used with this type of tyre.

Metal frame rings:

  • Only tyres labelled ‘tubeless’ may be fitted with tubeless tyres.
  • This type of tubeless tyre is not suitable for wheels without inner tubes.

Internal pipes : Do not fit tubed tyres and tubeless tyres together. The inner tube is a sensitive component in tubed tyres.

Filling the tank with oil:

  • Always replace the inner parts of the tube, and take care when fitting the new rim to the metal frame, which requires an inner tube.
  • The new inner tube must be fitted at the same time.
  • The old inner tube becomes stretched; even if the old inner tube is fitted to a new tyre, it will fail due to the weakness of the inner tube.

Tubeless valves:

  • When fitting the new tyre without the inner tube, you must fit a new valve that is suitable for the central service pressure at...