(For projects with building permit obtained prior to DBC implementation)
| PCFC- Entity (Business Unit) Name | : | Trakhees – Ports, Customs & Free Zone Corporation |
| Department Name | : | Civil Engineering Department (CED) |
(Prescriptive Compliance Sheet (for Built Up Areas ≤ 500 m²))
| Item | DESCRIPTION | TYPE | AIM / INTENT | REQUIREMENT / CRITERIA | COMPLIANCE REQUIREMENTS | EVIDENCE REQUIRED AT DESIGN STAGE NOC-BP | EVIDENCE REQUIRED AT POST-CONSTRUCTION STAGE NOC-BCC |
|---|---|---|---|---|---|---|---|
| A: GENERAL REQUIREMENTS | |||||||
| 1 | Integrated Design Approach for achieving energy savings | MANDATORY | To encourage a collaborative and integrative process for designing, constructing and operating the warehouse building. | Where evidence demonstrates that ALL the key stakeholders comprising ALL of but not limited to developer / client, designers contractors and suppliers have effectively participated in the design process. | KEY stakeholders comprising all of but not limited to designers and builders should be part of integrated design development process wherein important aspects are ... | ||