Unified UAE Legislation Database
Checked by realLaw AI

Fujairah Municipality List of Required Points For Different Type of Tests

Status

In force

Issuing Authority

Fujirah Municipality

GOVT. OF FUJAIRAH
FUJAIRAH MUNICIPALITY
BUILDING MATERIALS & TESTING LAB.

Doc. No. LO-02 /FMBL/2019
Rev 01
Effective from 01.08.2019

 

 

LIST OF REQUIRED POINTS FOR DIFFERENT TYPE OF TESTS

 

SL.

NO.

NAME OF TEST

PROJECTS

B

E

L

O

W

 

F

O

U

N

D

A

T

I

O

N

 

AREA (m2)

NO. OF POINTS

1

DENSITY

COMPACTION

TEST

VILLA,KITCHEN BLOCK, SHOP, 
BUILDING GAMGE, STORE, SHOWROOM

0-200

2 POINTS

 

 

 

SL.

NO.

NAME OF TEST

PROJECTS

B

E

L

O

W

 

G

R

A

D

E

 

S

L

A

B

AREA (m2)

NO. OF POINTS

2

DENSITY

COMPACTION

TEST

SHOP

FOR EACH

2 POINTS

 

 

SL.

NO.

NAME OF TEST

PROJECTS

D

E

C

O

R

E

 

C

O

L

U

M

N

FOUNDATION LEVEL OF COLUMN

COMPACTION REQUIRE AREA

NO. OF POINTS

3

DENSITY

COMPACTION

TEST

ALL KIND OF PROJECTS

0,00 LEVEL

ONLY NATURAL SURFACE

EACH COLUMN = 1 POINTS

 

 

SL.

NO.

NAME OF TEST

PROJECTS

A

L

L

 

M

A

T

E

R

I

A

L

S

TYPE OF MATERIALS

REQUIR TEST

4

PROCTOR TEST

VILLA, KITCHEN BLOCK SHOP, BUILDING GAMGE, STORE, SHOWROOM

NATURAL SOIL

MORE THAN 02 YEARS DO AGAIN

 

 

SL. NO.

NAME OF TEST

STRUCTURAL ITEMS

PROJECT

A

L

L

 

S

T

R

U

C

T

U

R

E

AMOUNT OF STRUCTURE

NO. OF POINTS

OLD CONSTRUCTION FOR SHOP

OLD CONSTRUCTION

FOR VILLA

5

SCHMIDT
HAMMER

FOOTING

VILLA, KITCHEN

BLOCK, SHOP,

BUILDING GAMGE,

STORE

25 % NUMBER OF
FOOTING

DEPENDS NUMBER
OF FOOTING

3 POINTS

5 POINTS

 

 

SL. NO.

NAME OF TEST

STRUCTURAL ITEMS

PROJECT

A

L

L

 

S

T

R

U

C

T

U

R

E

 

AMOUNT OF STRUCTURE

NO. OF POINTSOLD CONSTRUCTION FOR SHOP

OLD CONSTRUCTION FOR VILLA

6CORE TESTFOOTINGVILLA, KITCHEN BLOCK, SHOP, BUILDING GARAGE, STORE,25 % NUMBER OF FOOTINGDEPENDS NUMBER OF FOOTING3 POINTS5 POINTS

 

 

SL. NO.

NAME OF TEST

STRUCTURAL ITEMS

A

L

L

 

S

T

R

U

C

T

U

R

E

QUANTITY OF CONCRETE (m3)

NO. OF CUBES (07 DAYS)

NO. OF CUBES (28 DAYS)

7

CUBES

FOOTING

0-100

3 CUBES

3 CUBES

 

Note:

Municipality Technicians may provide any additional points on the site as per the site conditions. Next...