Unified UAE Legislation Database
Checked by realLaw AI

Dubai Ports Authority Regulation PS - 8.0 Port Operations (On Shore)

Status

In force

Issuing Authority

DPA

PCFC- Entity (Business Unit) Name:   Dubai Ports Authority 

Department Name: Ports Services  

Document Reference Number: PCFC-DPA-PS-REG-08 

Revision Number: 01 

Revision Date: December 2023 

Classification: Public  

 

NOTE: 
Please be informed that as decreed in PCFC Circular 04 of 2024, the Ports & 
Maritime Section has been transferred from ‘Environment, Health & Safety (EHS)’ to the ‘Dubai Ports Authority (DPA)’ 

 

8.1 General Requirements 

1. All port operations shall be carried out in accordance with a safe system of work by port workers who are appropriately trained and supervised. The safe system of work shall enable a worker to stop an operation immediately when there is a risk to safety or health. 

 

2. All plant and equipment used in port operations shall be . 

a. of good design and construction; 

b. of adequate strength for the purpose for which it will be used; 

c. of sound material and free from obvious defects; 

d. inspected at appropriate intervals; 

e. Properly maintained in a safe and efficient condition. 

 

3. Routine fire/Safety Inspections shall be carried out. These shall include inspections during periods when work is not carried on, as many fires result from smouldering and can break out many hours after their initial cause. 

 

4. All means of escape in case of fire shall be kept free from obstruction at all times. Flammable materials shall never be kept under stairways. 

 

5. There shall be a clear policy on smoking. Smoking shall be prohibited throughout the port area and on ships, except in designated areas. Smoking and no-smoking areas shall be clearly identified. 

 

8.1.1   Weather conditions 

1. Operations shall only be carried out in weather conditions that are permitted in the relevant operating instructions. 

2. Adverse weather conditions in which lifting operations may need to stop include. 

a. high winds; 

b. lightning; 

c. dangerous impairment of visibility by rain, snow, fog, etc.; 

d. adverse sea states; 

e. Significant vessel movement from various factors. 

3. Warning of adverse weather shall not rely solely on anemometers on cranes. Weather forecasts shall be obtained from other sources so that appropriate steps can be taken before the arrival of the high winds or other adverse weather conditions. 

4. Even at lower wind speeds, it may be dangerous to continue lifting operations, particularly when the load on a crane has a large surface area (e.g. a container). Lifting operations shall stop if it is likely to become difficult to control the movement of the load. 

5. Operating instructions shall include the actions to be taken by specified persons in the event of adverse weather. 

6. When high wind speeds are expected, cranes shall be secured in their appropriate out-of-service condition. If this requires the raising or lowering of a jib, the planned procedure shall ensure that there is adequate time and space to do so. Rail-mounted cranes shall be secured. Cranes secured at picket points shall be travelled against the wind to the nearest picket position and the storm anchor inserted. 

7. Lifting operations shall be stopped and all persons withdrawn from the vicinity of the crane if there is a possibility of the crane being struck by lightning. 

8. A crane that has been struck by lightning shall be thoroughly examined before being returned to service. 

9. Ropes attached to the load (tag lines) may be used to help to control loads in light winds, but it is essential to ensure that workers holding tag lines are fully aware of the motions to be performed by the crane. Workers holding such lines shall never attach them to, or wrap them around, their bodies. The lines shall be held so that they can be instantly released if necessary. 

 

8.1.2 Access arrangements 

1. Safe means of access shall be provided to all places where persons have to work. 

2. Persons on foot shall be separated from vehicles, whenever this is practicable. 

3. Pedestrian walkways shall not be used for other purposes. 

4. Where access is needed through areas from which pedestrians are excluded, arrangements shall be made for them to travel in a suitable vehicle. Access by crew, pilots and other visitors to ships at a container terminal could be one example. Persons on ships shall be informed, by means of a gangway notice or otherwise, how to summon the transport. 

5. Mobile access equipment, such as mobile elevating work platforms (MEWPs or. cherry pickers.) shall generally be used in preference to portable ladders. However, such equipment shall always be used in accordance with the manufacturer’s instructions, particularly those relating to the locking or scotching wheels and the use of outriggers. 

6. When it is necessary to use a portable ladder: 

a. the top of the ladder shall rise at least 1 m above the landing place or the highest point to be reached by a person using the ladder, unless other adequate handholds are provided; 

b. the stiles of the ladder shall stand on a firm and level footing. Loose packing shall not be placed under a stile; 

c. the ladder shall be secured to prevent it slipping. This shall preferably be done by securing it at its upper resting place. If this is not practicable, it shall be secured at its base. If even this is not practicable, the ladder shall be footed by another worker; a ladder more than 6 m in length shall also be secured at a point about one-third of its length from the ground; 

d. the ratio of the height of the ladder and the distance of its foot from the vertical surface against which it rests shall be 4:1, i.e. 4 meters height, 1 meter out. 

7. Workers using a ladder shall; 

a. have both hands free for climbing up and down; face the ladder when climbing up and down; 

b. wear suitable footwear that is not likely to slip; use a belt or other suitable means to carry any object that is necessary. 

8. A portable metal ladder or other mobile access equipment shall not be used in any place where any part of it or a person on it is liable to come into contact with an overhead electric cable, trolley wires or any other electrical equipment with bare conductors, unless the power has been switched off and the system isolated. This shall generally be in accordance with a permit to work which ensures that power cannot be switched on during the work. 

 

8.1.3 Housekeeping and cleanliness 

1. All parts of port areas shall be kept in a clean and orderly condition. 

2. All access routes and working areas shall be kept free from objects and materials that are liable to cause a person to trip or slip. 

3. Loose gear, tools and similar equipment shall be kept safely or removed from working areas when not in use. 

4. All dunnage and other rubbish shall be collected as soon as possible and disposed of in an appropriate manner. 

5. Spillages of oil or other materials likely to be a hazard shall be cleaned up by trained personnel as soon as possible and reported to a supervisor. 

6. Appropriate arrangements for clearance and gritting shall be made to deal with snow and ice when necessary. Particular attention shall be paid to means of access to workplaces, including access to ships. 

7. All plant and equipment shall be parked in appropriate designated areas when not in use. 

 

8.1.4 Manual handling

1. Manual handling includes all forms of lifting, lowering, pulling and pushing of loads by port workers. 

2. Port workers shall not be required or permitted to manually handle loads that are likely to prejudice their health or safety owing to their weight, size or shape. 

3. The need to manually handle significant loads shall be avoided by the use of mechanical handling equipment, whenever this is practicable. 

4. Manual handling shall only be carried out by port workers who have been trained or instructed in manual handling techniques in accordance with good kinetic handling principles. Supervisors shall ensure that the correct techniques are used in practice. 

5. It is neither practicable nor desirable to prescribe the maximum weight that may be manually handled by a port worker. Factors that shall be considered include the weight of the load, the age, physique, posture, fitness and sex of the worker, the size and shape of the load, the working environment and frequency and duration of operations. 

6. Particular consideration shall be given to the loads that may be handled safely by workers under the age of 18 years and pregnant women. The employment of such persons may be restricted by national legal requirements. 

7. Where appropriate, port workers shall be medically examined for fitness before being regularly assigned to carry out manual handling of significant loads. 

8. Loads to be manually handled shall whenever possible be compact. They shall be clearly marked with their weight and provided with handles or other devices, as necessary. Handling aids shall be used when appropriate. 

9. The packaging of loads to be manually handled shall not be liable to cause injury to persons handling them. 

10. Appropriate personal protective equipment, including safety footwear and gloves, shall be worn by port workers engaged in manual handling. 

 

8.1.5 Signalers 

1. Signalers may be slingers or other persons responsible for giving directions to lifting appliance operators. They shall be trained and certified in the art of signaling and directing crane movements using the signaling system in use in the port. 

2. Only one person shall act as the signaler for each lifting appliance. The signaler shall be clearly identifiable to the operator and, unless responding to an emergency stop signal, the operator shall only act on the signaler’s instruction. Identification can be ensured by a distinctively coloured hat or clothing or by radio call sign. Wearing light-colored sleeves and gloves will enable signals to be more easily seen. 

3. More than one signaler may be required for a lifting operation if; 

a. one signaler will not have a clear view of the load throughout its path of travel; 

b. hand signals are used and the first signaler has to move out of view of the appliance operator. 

4. If signaling requires verbal communication, the signaler shall be able to give clear and precise instructions in the language understood by the appliance operator. 

5. Hand signals shall be clear and precise and given by wide movements that are unambiguous. 

6. The system of hand signals shall be agreed and clearly understood by all parties. This is particularly important if the signaler and the operator of a lifting appliance are of different nationalities. 

7. The signaling system shall fail safe. If radios are used, each crane shall have its own separate call sign and frequency, which shall be kept free from communications for other purposes in order to prevent operators reacting to signals intended for another crane. The signaler shall constantly repeat the required motion throughout the intended movement, such as .hoist, hoist... hoist., and the motion shall be stopped if the operator ceases to hear the instruction. 

8. The signaling system shall include a means for a signaler to inform the crane driver that he/she will no longer be giving the directions. A further signal shall indicate to the crane operator that a second signaler is taking over responsibility for directing the crane movements. 

9. Signalers shall not give an order before satisfying themselves that all measures have been taken to ensure that the operation can be carried out safely. The essential characteristics of signalers shall be ceaseless vigilance and awareness that appliance operators are totally dependent on them during operations outside the operator’s line of sight. 

10. Before work is started for the day, a signaler shall ensure that the workplace on the ship’s deck or on the deck cargo is clear. 

11. Signalers on ships shall place themselves where they can be seen both by the workers in the hold and by the operator of the appliance. 

12. Signalers shall do their utmost to protect persons against accidents. When necessary, they shall warn persons in cargo holds, on lighters and ashore. 

13. When cargo is being loaded or unloaded .by a fall at a hatchway, it shall be possible for the signaler to pass safely between the hatchway and the ship’s side; 

14. when more than one fall is being worked, a separate signaler shall be used for each fall, except in the case of union purchase. 

15. Before giving a signal to hoist, a signaler shall ensure that the load is properly slung and that hoisting can be started without risk to persons working in the hold or elsewhere. 

16. No signal to lower a load shall be given by a signaler unless all persons are clear in the hold and elsewhere. 

17. Before giving the signal to land, signalers shall satisfy themselves that the load can be safely landed. 

18. Signalers shall never. 

a. give an order to move a load if any person is under its path; the person shall be asked to move; agree to order operations that would violate safety rules, such as operations with defective slinging, dragging loads horizontally other than by bull roping, or with persons traveling on the load; 

b. give an instruction for operations if the light is insufficient or if there is thick fog, unless special precautions are taken. 

19. Signalers shall ensure that no persons are carried by lifting appliances except in properly constructed personnel carriers. 

20. If it is necessary to stop a load while it is being raised or lowered, the signal shall be precise but not abrupt, so that the operator of the lifting appliance does not jolt the load. 

21. Equipment used for giving sound, colour or light signals for hoisting, lowering or transporting loads shall be efficient, properly maintained and protected from accidental interference. 

 

8.1.6 Operational maintenance 

1. All plant and equipment in ports shall be regularly maintained in a safe and efficient condition, in accordance with the manufacturer’s or supplier’s recommendations, relevant national legal requirements and operational experience. This shall be done on a planned, preventative basis, and shall include periodic inspections and examinations, as well as physical maintenance. 

2. Inspection and maintenance shall be carried out on emergency equipment and personal protective equipment, as well as operational plant and equipment. 

3. Maintenance and inspections shall be carried out by engineering personnel, operators or users as appropriate. 

4. All persons carrying out maintenance and inspection duties shall be trained in the relevant procedures and the identification of potential defects that may be found. 

5. Safe means of access shall be provided to all places to which maintenance personnel have to go. This shall normally be permanent access. 

6. All plant shall be isolated before maintenance work is started. The isolation system shall include lock-off facilities if the plant can be started remotely. Where necessary, maintenance work shall be carried out in accordance with a permit to work system. 

 

8.1.7 Hot works on shore 

1. Hot work shall be carried out in accordance with national legal requirements and any port by-laws. These often require the permission of the port authority (DPA) to be obtained before hot work is carried out. Obtaining a hot work permit from a port authority does not absolve those carrying out hot work from their duty to ensure that appropriate precautions are taken. 

2. A hot work permit (yard permit) shall generally specify . 

a. the location and nature of the work; 

b. the proposed time and duration of the work; 

c. the period for which the permit is valid; 

d. any precautions to be taken before, during and after the work; 

e. the person in direct control of the work; 

f. the identity of the person authorizing the work. 

3. The precautions shall generally include ensuring that . 

a. the work area is free from any flammable materials or flammable material residues. 

b. This shall include the remote side and adjacent areas of any plates or other metal 

c. involved in the hot work and any area where hot particles may fall; 

d. no flammable or otherwise dangerous substances will enter the area during the work; 

e. the atmosphere in the work area is safe to breathe and remains so throughout the work; 

f. appropriate personal protective equipment, including overalls, gloves and eye protection is used; 

g. appropriate fire-fighting equipment is available at the site of the work, together with a person trained in its use; this may be a person carrying out the work; 

h. any cylinders of flammable gas and oxygen and hoses and torches attached to them are removed from any enclosed space when the work stops; 

i. periodic checks for smoldering are made after the work has finished. These shall include adjacent spaces that may have been subjected to heat or falling residues, as fires due to smoldering often break out several hours after completion of work. 

4. If hot work is carried out on sprinkler systems in warehouses or elsewhere, particular care shall be taken to ensure that other adequate fire-fighting facilities are available during the period the sprinkler system is inoperative. If it is not practicable to remove goods from the area below the work, they shall be covered by non-flammable sheets to protect them from falling hot particles. 

5. The permit shall include a facility for signing off when the work is completed. 

 

8.1.8 Use of personal protective equipment during port on shore operations 

1. Personal protective equipment shall never be used as a substitute for eliminating or controlling a hazard at source. However, if this is not possible, appropriate personal protective equipment shall be provided and used. 

2. Personal protective equipment shall generally be available in a range of sizes, as one...