Unified UAE Legislation Database

Dubai Ports Authority Regulation PS - 6.0 Equipment and Machinery

Status

In force

Issuing Authority

DPA

Effective date

XX.XX.XXXX

Official Link

https://

 

PCFC- Entity (Business Unit) Name:Dubai Ports Authority
Department Name:Ports Services

 

6.1 General Requirements

All terminal plant and equipment shall be of good design and construction, of adequate strength, suitable for the purpose for which it is used, and maintained in a safe and efficient condition. The maintenance shall be carried out on a planned preventive basis.

 

6.2 Mobile Equipment

Mobile equipment used in ports, including various types of vehicles which are one of the most common elements in fatalities and serious injuries in ports, shall be properly maintained and kept in good order. Special attention shall be paid to the maintenance of brakes and braking systems.

 

6.2.1 Internal movement vehicles

1. Internal movement vehicles (vehicles that only work within a port or belong to the ship) including skeletal trailers shall comply with appropriate minimum standards for construction and maintenance, particularly with regard to such items as tyres, brakes, lights, steering, warning signals and general vehicle safety.

 

2. Cargo-handling vehicles shall have a high degree of stability under ...