1. Title
This Law may be cited as the “DIFC Laws Amendment Law, DIFC Law No.1 of 2026”.
2. Legislative authority
This Law is made by the Ruler of Dubai.
3. Date of enactment
This Law is enacted on the date specified in the Enactment Notice in respect of this Law.
4. Commencement
This Law comes into force on the date specified in the Enactment Notice in respect of this Law.
1. The Real Property Law 2018 is amended as prescribed in this Part.
2. The following Articles of the Real Property Law 2018 are to be amended by inserting the underlined text and deleting the struck through text as shown below:
……
……
(1) A Lessor shall, in respect of any Lease required to be Registered under Article 48(3), within thirty (30) forty five (45) days of the date on which the Lease is entered into, Register the Instrument in respect of such Lease.
(2) If the Lessor fails to comply with Article 49(1), then the Lessor commits a contravention of this Law.
(3) A Lessor complies with Article 49(1) if the Instrument for Registration of the Lease is lodged for Registration within thirty (30) forty five (45) days of the date on which the Lease was entered into by the Lessor and Lessee.
……
……
(1) A Developer is responsible liable to the Registered Owner for repairing, rectifying or replacing all defective building works, materials, equipment and installations (including mechanical, electrical, sanitary and drainage works and the like) in the Off Plan Development of a non-structural nature for a period of one (1) year from the date of Building Completion including all non-structural defective building works, materials, equipment and installations in the Lots and the Common Property where applicable.
(2) The Developer is responsible liable to the Registered Owner for repairing, rectifying or replacing all defective building works, materials, equipment and installations (including mechanical, electrical, sanitary and drainage works and the like) in the Off Plan Development of a structural nature for a period of ten (10) years from the date of Building Completion including all structural defective building works, materials, equipment and installations in the Lots and the Common Property where applicable.
……
(1) The Contractor is liable to the Developer for repairing, rectifying or replacing all defective building works, materials, equipment and installations (including mechanical, electrical, sanitary and drainage works and the like) in the Off Plan Development of a structural nature for a period of ten (10) years from the date of Building Completion including all...