Unified UAE Legislation Database
Checked by realLaw AI

Cabinet Decision No. 42 of 2021 Regarding the UAE’s Hydrogen Vehicle Scheme

Status

In force

Issuing Authority

The UAE Cabinet

Effective date

17 May 2021

The Cabinet:

  • having reviewed the Constitution،
  • and Federal Decree-Law No. 1 of 1972 on the Competencies of Ministries and the powers of Ministers, as amended,
  • and Federal Decree-Law No. 21 of 1995 on Road Traffic, as amended,
  • and Federal Decree-Law No. 14 of 2016 on Administrative Violations and Penalties in the Federal Government,
  • and Federal Decree-Law No. 10 of 2018 on Product Safety, as amended,
  • Federal Decree-Law No. 15 of 2020 on Consumer Protection,
  • Federal Decree-Law No. 20 of 2020 on Specifications and Standards,
  • Cabinet Decision No. 35 of 2015 concerning the UAE System for the Supervision of Conformity Assessment Bodies,
  • Cabinet Decision No. 45 of 2016 concerning Mandatory Standards for the United Arab Emirates,
  • Cabinet Decision No. 30 of 2017 concerning the Regulation of Traffic and Road Safety Services, and its amendments,
  • Following the proposal put forward by the Minister for Industry and Advanced Technology, and with the approval of The Cabinet,

has decided:

 

Article 1 - Definitions

For the purposes of implementing the provisions of this Decision, the following words and expressions shall have the meanings set out opposite each of them, unless the context otherwise requires:

 

Competent Authority: the federal or local Government Entity in the State which has the power to enforce any of the provisions of this Decision.

 

Product: Any hydrogen-powered vehicle with a gross weight not exceeding 4,536 kilograms, including light vehicles and light buses with a speed exceeding 25 km/h, which use hydrogen as an alternative fuel to power them.

 

Standard: A document that specifies the characteristics of goods, articles, Products or services – or anything else that can be measured – including its descriptions, properties, quality level, dimensions and measurements, or its safety and security requirements; It also covers terminology, symbols, test methods, sampling procedures, packaging, data sheets and markings.

 

Standard Specification: The Standard adopted by the Ministry, referred to as the United Arab Emirates Standard and denoted by the symbol (M Q / Q M) or (UAES).

 

Certificate of Conformity: A certificate issued by the Ministry confirming that a Product, or any batch thereof, complies with the requirements of the approved Standard.

 

Certificate of Conformity: A certificate issued by an accredited body following a type examination, certifying that the technical design of the examined type complies with the relevant Gulf technical regulations.

 

Conformity Assessment Procedures: any activity used, directly or indirectly, to verify that a Product or service meets the relevant technical requirements.

 

Conformity Assessment Procedures Body: A body registered, accredited or recognised by the Ministry to carry out Conformity Assessment Procedures procedures in accordance with the relevant legislation in force, including testing and calibration laboratories, inspection bodies, proficiency testing bodies and bodies issuing certificates for systems, individuals or Products.

 

Supply Chain: All the stages a Product goes through, from initial Production to its arrival at the consumer, including Import, manufacturing, preparation, processing, filling, packaging, handling and distribution.

 

Supplier: the manufacturer, producer, processor, importer or stockist of the Product; any main or subsidiary distributor; any person whose activities affect the characteristics of the Product; or any commercial or legal representative responsible for Importing the Product.

 

Article 2 - Scope of Application

The provisions of this Decision apply to all Products placed on the market within the State, including Free Zones.

 

Article 3 - Responsibilities of the Competent Authorities

The competent authorities shall carry out the following:

  1. Ensure that the Product complies with the terms and conditions set out in this Decision before it is imported into and registered in the State.
  2. To carry out market surveillance tasks to ensure that the Product has obtained a certificate of conformity in accordance with the provisions of this Decision.
  3. Provision of facilities and requirements for periodic Product testing.
  4. To liaise with the Ministry to impose any further requirements or obligations on the Supplier.

 

Article 4 - Supplier’s Obligations

At any stage of the Supply Chain, the Supplier must comply with the following:

  1. No Product shall be imported into the State under the provisions of this Decision until it has obtained a Certificate of Conformity or a Gulf Certificate of Conformity.

  2. To cooperate with the Ministry and the Competent Authority and to provide them with all the documents and data they request, including Product inspection reports drawn up in accordance with the requirements set out in Annex 3 attached to this Decision.

  3. To ensure that the Product complies with the requirements set out in this Decision and the instructions for use specified for it throughout the Product’s period of use.

  4. Compliance with Product requirements, including Product performance requirements, the required data labels, safety equipment and Product storage requirements, in accordance with Annex 3 attached to this Decision.

  5. To provide the requirements, information and procedures for dealing with incidents affecting the Product, in accordance with Annex 3 attached to this Decision.

  6. To ensure the provision of a permanent infrastructure for the Product, including technical workshops, qualified personnel, and the machinery and equipment used in maintenance operations, in accordance with Annex 3 attached to this Decision.

  7. To ensure that the technical requirements for the apparatus and equipment used at hydrogen refuelling stations are met, in accordance with the specifications set out in Annex 2 attached to this Decision.

  8. To provide the technical specifications for the maintenance, replacement and re-installation of components relating to the Product’s hydrogen system, including safety requirements and the training of technical staff to handle these Products.

  9. The technical instructions and procedures in force in the State must be followed when storing, transporting, handling or disposing of used or damaged waste, in order to ensure the protection of the environment and the maintenance of public safety.

 

Article 5 - Certificate of Conformity

The following conditions must be met for a certificate of conformity to be issued:

  1. The Product must comply with all the requirements of this Decision, including the requirements of the Standard Specifications set out in Annex 1 and Annex 2, and the technical requirements set out in Annex 3, which are attached to this Decision.
  2. Submission of the required supporting documents and drawings demonstrating the Product’s conformity with the requirements set out in this Decision.
  3. The Product must be tested in laboratories that are registered with, accredited by, recognised by or accepted by the Ministry.

 

Article 6 - Conformity Assessment Procedures Procedures

1.The Supplier must apply for a certificate of conformity for the Product, in accordance with the following requirements:

a. Submit an application to the Ministry to register the Product.

b. A copy of an industrial or commercial licence valid in the State. 

c. Sign the declaration of conformity in accordance with the template approved by the Ministry. 

d. To submit all documents and data relating to the Product’s compliance with and conformity to the technical requirements set out in Annex 3 attached to this Decision.

e. Specifying the Product’s nominal characteristics, which must be recorded on the data sheet.

 

2. A certificate of conformity issued in accordance with the provisions of this Decision shall remain valid for one year from the date of issue and shall be renewed annually provided that the conditions set out in the provisions of this Decision are met.

 

3. The Supplier shall bear the costs of any inspection or testing of the Product requested by the Ministry during the Product conformity period.

 

4. If a Product has been awarded the Gulf Conformity Certificate, it is not necessary to obtain a certificate of conformity from the Ministry.

 

5. The Ministry shall be entitled to carry out factory inspections whenever necessary to review manufacturing processes and to attend the tests required in accordance with the Standard Specifications set out in Annex 1 attached to this Decision.

 

Article 7 - Market Surveillance and Surveys

1. Once placed on the market, the Product is subject to supervision, and the Ministry or the Competent Authority shall, as appropriate, take the necessary measures to monitor it to ensure that it continues to comply with the certificate of conformity at all stages of the Supply Chain, and may, to that end, take any of the following measures: 

a. Ensure that all outlets selling the Product within the State comply with the ban on its import or sale on the domestic market, unless it has obtained a certificate of conformity. 

b. To take samples of the Product from the market or from Suppliers’ warehouses, in order to carry out the necessary tests and verify that it complies with the requirements of this Decision.

c. Taking appropriate measures in respect of Products that contravene the provisions of this Decision, including suspending or abrogating the certificate of conformity for non-compliant Products and withdrawing and recalling non-compliant Products from the market.

d. The Supplier responsible for placing the non-compliant Product on the market shall be required to recall and withdraw it from local markets, and to rectify the situation where possible, or to return it to the country of origin or export, or to destroy it in accordance with the applicable legislation in this regard, within the timeframe specified by the Ministry or the Competent Authority, as the case may be.

e. Monitoring the implementation of the measures referred to in this Article.

 

2.The Supplier from whom a sample of the Product in their possession was taken shall be held responsible for its non-compliance with the requirements of this Decision, unless they can prove otherwise, within the period specified by the Ministry or the Competent Authority, as the case may be.

 

Article 8 - Violations and Penalties

1. Without prejudice to any penalty or measure provided for in any legislation in force in the State, in the event of a breach of any of the provisions of this Decision, the Ministry or the Competent Authority, as the case may be, may impose one or more of the following administrative penalties:

a. Coordinate with the licensing authority to have the trading licence of the Supplier responsible for the breach abrogated.

b. Abrogation of the certificate of conformity granted to the non-compliant Product.

c. To charge the violator the costs and expenses of removing and remedying the damage resulting from the violation, should the violator fail to remove or remedy it.

 

2. Where the Ministry or the Competent Authority, as the case may be, is unable to identify the person responsible for the Product’s non-compliance with the requirements of this Decision, the person in whose possession the breach was detected shall be deemed responsible for such non-compliance, unless proven otherwise.

 

Article 9 - Grievance

1. Grievance may be submitted against decisions issued pursuant to the provisions of Article 8 of this Decision, provided that the following conditions are met: 

a. Grievance shall be submitted with the Minister, the head of the Competent Authority, or their authorised representatives, in accordance with the procedures laid down by the Ministry or the Competent Authority, as the case may be, within a period not exceeding 14 working days from the date on which the violator is notified of the Decision against which they wish to submit a grievance. 

b. Attach the necessary documents explaining the grounds for the grievance.

 

2. The Minister, the head of the Competent Authority, or their authorised representatives shall issue the decision they deem appropriate regarding an grievance submitted in accordance with the provisions of this Article within a period not exceeding (25) working days from the date of its submission; the decision issued in this regard shall be final, and the grievance shall be deemed to have been rejected if no action is taken within the period specified in this Clause.

 

Article 10 - General Provisions

1. The Ministry shall be responsible for implementing the provisions of this Decision and, to that end, may take such measures as it deems appropriate; it may delegate some of its powers to recognised Conformity Assessment Bodies.

 

2. The Ministry is responsible for receiving and examining applications for Product registration and for issuing certificates of conformity in accordance with the provisions of this Decision; it is authorised to delegate this responsibility to any of the competent authorities or to appoint an approved Conformity Assessment Procedures Body to assess Product conformity, in accordance with the Cabinet Decision on the UAE System for the Supervision of Conformity Assessment Bodies.

 

3. The Supplier and relevant parties must cooperate fully with the Ministry and the competent authorities and provide the necessary information required to implement the provisions of this Decision.

 

4. The Standards set out in Annex 1 and Annex 2 to this Decision are mandatory Standards for the purposes of its implementation, and no Product may be placed on the market unless it complies with or meets the provisions of this Decision.

 

5. The Minister may amend any of the Standard Specifications or requirements set out in the Annex attached to this Decision, or adopt any other Standard specification required for the implementation of this Decision, in accordance with the legislation in force in this regard.

 

Article 11 - Transitional Provisions

A Supplier who has placed a Product on the market prior to the publication of this Decision shall be granted a period not exceeding one calendar year from the date of publication of this Decision in the Official Gazette to bring that Product into compliance with the provisions of this Decision.

 

Article 12 - Abrogations

Any provision that contradicts the provisions of this Decision shall be abrogated.

 

Article 13 - Publication and Enforcement

This Decision shall be published in the Official Gazette and shall come into force on the day following the date of its publication.

 

 

Mohammed bin Rashid Al Maktoum
Prime Minister

Published by us:
Date: 9 Ramadan 1442 AH
Corresponding to: April  21, 2021 

 

 

Annex 1 - Concerning the Standard Specifications for vehicles Attached to Cabinet Decision No. 42 of 2021 Concerning the UAE Hydrogen Vehicle System

 

No.Standard No.Standards Title
1UAE.S GSO 36Motor Vehicles - Methods of Test for Impact Strength - Part 1: Frontal Impact

 

Annex 2 - Concerning the Standard Specifications for Hydrogen Vehicles Attached to Cabinet Decision No. 42 of 2021 Concerning the UAE Hydrogen Vehicle System

 

Standard No.Standards Title
Vehicle Fuel System

Note: FMVSS specifications are accepted as equivalent to approved specifications.

 

Annex 3 - On UAE Technical Requirements for Hydrogen Vehicles Attached to Cabinet Decision No. 42 of 2021 Concerning the UAE Hydrogen Vehicle System

Technical regulation on hydrogen fueled vehicles

1. Scope

This regulation applies to all hydrogen fuelled vehicles with a gross vehicle mass (GVM) of 4,500 kilograms or less and a speed not less than 25 Km/h.

2. Definitions

For the purpose of this regulation, the following definitions shall apply:

 

2.1. "Active driving possible mode" is the vehicle mode where application of pressure to the accelerator pedal (or activation of an equivalent control) or release of the brake system causes the electric power train to move the vehicle

 

3.2. "Automatic disconnect" is a device that, when triggered, conductively separates the electrical energy sources from the rest of the high voltage circuit of the electrical power train.

 

3.3. "Burst-disc" is the non-reclosing operating part of a pressure relief device which, when installed in the device, is designed to burst at a predetermined pressure to permit the discharge of compressed hydrogen.

 

3.4. "Check valve" is a non-return valve that prevents reverse flow in the vehicle fuel line.

 

3.5. "Concentration of hydrogen" is the percentage of the hydrogen moles (or molecules) within the mixture of hydrogen and air (Equivalent to the partial volume of hydrogen gas).

 

3.6. "Container" (for hydrogen storage) is the component within the hydrogen storage system that stores the primary volume of hydrogen fuel.

 

3.7. "Conductive connection" is the connection using contactors to an external power supply when the rechargeable energy storage system (REESS) is charged.

 

3.8. "Coupling system" for charging the rechargeable energy storage system (REESS) is the electrical circuit used for charging the REESS from an external electric power supply including the vehicle inlet.

 

3.9. "Date of removal from service" is the date (month and year) specified for removal from service.

 

3.10. "Date of manufacture" (of a compressed hydrogen container) is the date (month and year) of the proof pressure test carried out during manufacture.

 

3.11. "Direct contact" indicates the contact of persons with high-voltage live parts.

 

3.12. "Enclosed or semi-enclosed spaces" indicates the special volumes within the vehicle (or the vehicle outline across openings), that are external to the hydrogen system (storage system, fuel cell system and fuel flow management system) and its housings (if any) where hydrogen may accumulate (and thereby pose a hazard), as it may occur in the passenger compartment, luggage compartment, cargo compartment and space under the hood.

 

3.13. "Enclosure" is the part enclosing the internal units and providing protection against any direct contact.

 

3.14. "Electric energy conversion system" is a system (e.g. fuel cell) that generates and provides electrical power for vehicle propulsion.

 

3.15. "Electric power train" is the electrical circuit which may include the traction motor(s), and may also include the REESS, the electrical power conversion system, the electronic converters, the traction motors, the associated wiring harness and connectors and the coupling system for charging the REESS.

 

3.16. "Electrical chassis" is a set of conductive parts electrically linked together, whose electrical potential is taken as reference.

 

3.17. "Electrical circuit" is an assembly of connected high voltage live parts that is designed to be electrically energized in normal operation.

 

3.18. "Electrical isolation" is the electrical resistance between a vehicle high voltage bus source and any vehicle conductive structure.

 

3.19. "Electrical protection barrier" is the part providing protection against direct contact with live parts from any direction of access.

 

3.20. "Electronic converter" is a device capable of controlling and/or converting electric power for propulsion.

 

3.21. "Exhaust point of discharge" is the geometric centre of the area where fuel cell purged gas...