Cabinet Decision No. 27 of 2021 Concerning the amendment of certain provisions of Cabinet Decision No. 37 of 2001 Regarding the Executive Regulations of Federal Decree-Law No. 24 of 1999 On the protection and development of the environmen

Status

In force

Issuing Authority

The UAE Cabinet

Effective date

17 May 2021

The Cabinet:

  • having reviewed the Constitution،
  • and Federal Decree-Law No. (1) of 1972 concerning the remit of Ministries and the powers of Ministers, as amended,
  • and Federal Decree-Law No. (24) of 1999 on the protection and development of the environment, as amended,
  • And pursuant to Cabinet Decision No. (37) of 2001 concerning the regulations for the Executive regulations for Federal Decree-Law No. (24) of 1999 on the protection and development of the environment,
  • Based on the proposal put forward by the Minister for Climate Change and the Environment, and with the approval of The Cabinet,

Has decided:

Article (1)

The Environmental Impact Assessment System for Installations annexed to the aforementioned Cabinet Decision No. (37) of 2001 shall be replaced by the system annexed to this Decision, which shall be known as: the Environmental Impact Assessment System for Projects, Installations and Activities.

Article (2)

The Minister for Climate Change and the Environment shall issue the necessary decisions to implement the provisions of this resolution.

Article (3)

Any provision that contravenes or conflicts with the provisions of this Decision shall be abrogated.

Article (4)

This Decision shall be published in the Official Gazette and shall come into force on the day following the date of its publication.

Mohammed bin Rashid Al Maktoum Prime Minister of The Cabinet

Issued by us:

Date: 3 Sha'ban 1442 AH

Corresponding to: 17 March 2021 AD

Environmental Impact Assessment System for Projects, Facilities and Activities

Article (1)

For the purposes of this Regulation, the following words and expressions shall have the meanings set out opposite each of them, unless the context otherwise requires:

  • State: United Arab Emirates.
  • Ministry: Ministry of Climate Change and the Environment.
  • Competent authority: The local authority in each emirate of the State, responsible for assessment, licence issuance, monitoring, inspection and environmental enforcement.
  • Licence application: the form drawn up in accordance with the templates set out in Annex 3 attached to this Decision, and submitted by the applicant.
  • Environmental Licence: A document issued by the Ministry or the competent authority – as the case may be – in response to an application for an environmental licence to establish, modify, operate or cease a project, facility or activity, setting out the conditions and procedures required to protect the environment and minimise environmental impact.
  • Facility: an industrial or tourism facility; an electricity generation facility; a facility engaged in the exploration, extraction, transport or use of oil; an infrastructure facility; or any other facility.
  • Project: a development project, infrastructure project or any other project that has an environmental impact.
  • Licence application: Any person or legal entity wishing to establish, amend, operate or terminate a project, facility or activity.
  • Environmental Impact Assessment: The process of assessing the potential environmental impacts of a project, facility or activity prior to its implementation, in accordance with an application for an environmental licence, with a view to the Ministry or the competent authority making an appropriate Decision, as the case may be.
  • Environmental Impact Assessment Study: A comprehensive study prepared in accordance with the procedures adopted by the Ministry or the competent authority – as the case may be – to assess the environmental impacts associated with the project, facility or activity at all its stages, whether prior to the commencement of implementation or upon the introduction of any modifications or extensions to the existing facility, taking into account the cumulative environmental impact of the new facility in conjunction with existing neighbouring facilities.

Article (2)

  1. The Ministry, in coordination with the relevant authorities, is responsible for carrying out environmental impact assessments and issuing licences for federal projects, facilities and activities, or those whose environmental impact extends to another emirate.
  2. The competent authority is responsible for issuing licences for projects, establishments or activities within the geographical jurisdiction of the emirate.

Article (3)

  1. The licence applicant must submit an application for an environmental licence to the Ministry or the competent authority, as the case may be- in accordance with the form approved by the Ministry or competent authority for this purpose, prior to the establishment or modification of any of the projects, facilities or activities set out in Annex 1 attached to this Decision.
  2. The Ministry or the competent authority shall specify the procedures to be followed in order to obtain an environmental licence for projects, installations or activities for which no environmental study is required.
  3. The competent authority may impose any further conditions or requirements for the granting of an environmental Licence, provided that these do not contravene the conditions and requirements set out in this Decision.

Article (4)

  1. The applicant must submit an application for an environmental licence to the Ministry or the competent authority, as appropriate.
  2. The Ministry or the competent authority – as the case may be – shall review the application and verify the accuracy of the information provided, in preparation for taking the necessary measures.

Article (5)

Before ceasing operations at the premises, carrying out rehabilitation, removing equipment and vacating the land on which the premises are situated, the owner of the project, premises or activity must apply to the Ministry or the competent authority – as the case may be– with a request for assistance in ceasing operations and carrying out rehabilitation, to ensure that all necessary requirements for environmental protection and rehabilitation are met.

Article (6)

The Ministry or the competent authority – as the case may be – shall review the application for an environmental licence and recommend one of the following decisions:

  1. The project, facility or activity in question is not subject to environmental licences as it has no adverse environmental impacts.
  2. Submission of an environmental impact assessment or other environmental studies.
  3. Approval of the proposed project, facility, activity or amendment, by issuing an environmental licence setting out the environmental conditions; the licence applicant is obliged to implement the necessary environmental procedures or measures.
  4. Issuance of an environmental licence for the operation of existing facilities, subject to environmental conditions, provided that the licence applicant undertakes to implement the necessary environmental procedures or measures.
  5. Refusal to grant a licence.
  6. Any other decisions you deem necessary. The Ministry or the competent authority – as the case may be – must notify the licence applicant of the decision taken regarding their application within thirty (30) days of the date on which all the requirements for their application have been met.

Article (7)

An environmental impact assessment study must be submitted in accordance with the details set out in Annex 2 attached to this Decision.

Article (8)

The Ministry or the competent authority shall, as the case may be– review the environmental impact assessment or other environmental studies submitted by the licence applicant; in doing so, it may engage such persons as it deems appropriate; and, based on the findings of such a study, it may take any of the following decisions:

  1. Approval of the study and the issue of an environmental Licence.
  2. Approval of the study, subject to the submission of further environmental studies as specified in Annex 4 attached to this Decision.
  3. Return the study to the applicant for the licence so that they may complete the required details and information.
  4. Any other decisions it deems appropriate.

Accordingly, the project, establishment or activity shall be granted a licence or rejected, with the reasons for rejection clearly stated; the Ministry or the competent authority – as the case may be – shall notify the licence applicant of its decision within thirty (30) days of the date of receipt of the application.

Article (9)

The owner of the facility or project is required, during both the construction and operational phases, to carry out periodic analyses of environmental pollutants and waste and to maintain registers thereof, in accordance with the procedure set out in the environmental licence granted to them and the legislation in force in the State, provided that a copy of the analysis reports is sent to the competent authority.

Article (10)

The owner of the establishment or project shall be required to keep the registers referred to in Article (9) of this Decision for a period of (5) five years from the date of the analysis, and judicial enforcement officers from the Ministry or the competent authority shall be entitled to inspect these registers.

Article (11)

An applicant for a licence is required to provide accurate data and information about the establishment or project to the Ministry or the competent authority, as the case may be.

Article (12)

  1. Without prejudice to any more severe penalty provided for in any other legislation, the Ministry or the competent authority shall, as the case may be— shall impose Administrative Penalties on the owner of the project, establishment or activity for acts committed in contravention of the provisions of this Decision, as follows: A. (200,000) two hundred thousand dirhams in the event of a breach of any of Articles (3), (5) and (7) of this Decision. b. (150,000) one hundred and fifty thousand dirhams in the event of a breach of Article (4) of this Decision. c. (100,000) one hundred thousand dirhams in the event of a breach of Article 9 of this Decision.
  2. The fine referred to in Clause (1) of this Article shall be doubled to a maximum of (400,000) four hundred thousand dirhams, in the event of a repeat offence of the same nature within one year of the date on which the previous offence was committed.

Article (13)

In addition to the Administrative Penalties prescribed under Article 12 of this Decision, the competent authority may impose any of the following administrative measures and sanctions:

  1. An administrative closure for a period not exceeding three (3) months; it may issue decisions allowing the establishment or project to resume operations before the end of the administrative closure period, provided that the situation is rectified and the breach is remedied.
  2. Permanent closure and revocation of the Licence in the event of failure to rectify the breach following the expiry of the period of administrative closure referred to in Clause (1) of this Article.

Article (14)

  1. Appeals may be lodged against decisions issued pursuant to the provisions of Article 13 of this Resolution, provided that the following conditions are met: A. An appeal must be lodged with the authority that issued the decision imposing the administrative penalty, in accordance with the procedures and time limits specified in a Decision issued by that authority. b. Attach all necessary documents explaining the grounds for the appeal.
  2. The authority referred to in Clause (1) of this Article shall issue the Decision it deems appropriate regarding the appeal within the period it specifies, and the Decision issued in this regard shall be final.

Projects/activities/facilities requiring an environmental licence (or a licence based on environmental studies)

Projects/ActivitiesCategoryTV series
Projects involving the exploration (prospecting and extraction), processing, reprocessing, storage, transport, sale and collection of petroleum or gas, and all their derivatives (such as petrol, diesel, oils and greases, by way of example and not limited to these), including related facilities and equipment.Natural Resources projects1
Projects relating to the exploration, extraction, processing, storage and transport of sand, including associated facilities and equipment.Non-fossil Natural Resources projects2
Any industrial facilities expected to emit gases containing mercury and other heavy metals.18
Any industrial facilities that produce hazardous waste.19
Reverse osmosis desalination plants, in the event of discharge into the sea.and water43
Reverse osmosis desalination plants, in the event of pumping into the aquifer.44
Gas/oil pipelines.62
Irrigation networks.63
Projects that are expected to affect the heritage, historical, recreational, scientific, cultural and service-related character of the surrounding area.82
Hotels, hospitals and healthcare facilities, including laboratories.83
Table of Contents
List of abbreviations
5.1 Components of the environmentEnvironment, impacts, mitigation measures and monitoringChapter 5
5.1.1 Description of the environment  
5.12 Summary of Impacts, Mitigation Measures and Monitoring Programmes  
5.12.1 Selected monuments  

Note: The environmental impact assessment study must include at least the data set out in Annex 2 to this Decision; the Ministry or the competent authority may request the inclusion of any further information or data it deems appropriate for the type of project or activity for which a Licence is sought.

Table of Contents
List of Abbreviations
 5.1.3.3 Mitigation Measures to Address Cumulative Impacts
5.1.3.4 Residual Impacts
5.1.4 Monitoring Programme
5.1.4.1 Monitoring Programme for Compliance with Selected Mitigation Measures
5.1.4.2 Monitoring Programme for Cumulative Impacts
5.1.4.3 Monitoring Programme for Residual Impacts
* NOTE: Sections 5.2–5.11 should also include the subsections listed for
5.2 Air Quality
5.3 Marine Water
5.4 Waste Management
5.5 Geology, Seismicity, Soil, and Groundwater
5.6 Marine Ecology
5.7 Terrestrial Ecology
5.8 Noise
5.9 Traffic
5.10 Socio-economic
5.11 Other Environmental Component(s)
5.12 Summary of Impacts, Mitigation and Monitoring
5.12.1 Selected Impacts
5.12.2 Cumulative Impacts
5.12.3 Residual Impacts
5.13 Risk Assessments
5.13.1 Accidental Environmental Impacts
5.14 Environmental Management Framework
  5.14.1 Objectives of the Environmental Management Programme
5.14.2 Roles and Responsibilities
5.14.3 Training and Competence
5.14.4 Communication
5.14.5 Monitoring and Reporting
5.14.6 Audit and Inspection
5.15 Modelling and climate change
Chapter 6Project Alternatives 
# الملحق رقم (3) A المرفق بنظام تقييم الأثر البيئي للمشاريع والأنشطة والمنشآت

# المشاريع الصناعية
# SECTION 1: Provide a Brief Description of the Facility

القسم 1: وصف موجز عن المنشأة
Administrative Detailsتفاصيل إدارية
AFacility NameMain or Branchالموقع الرئيسي أو فرع
Branch ☐ فرع ☐
Main or Branch
Technical DetailsTechnical details
AFacility Activityنشاط المنشأة
Number of Production Linesعدد خطوط الإنتاج

Part 3: Answer the following questions. If the answer is ‘yes’, please provide details below the question.

QuestionYes / نعمNo / لاThe question 
1. Does the project involve marine activities (e.g. dredging, land reclamation, etc.)?☐☐هل سيتطلب المشروع عمليات بحرية (حفر، دفن، إلخ)؟1.
2. Will seawater or groundwater be extracted and used on-site?☐☐هل سيتم سحب واستخدام مياه البحر أو المياه الجوفية في الموقع؟2.
9.Will the generated wastewater be treated on site? If yes, specify method.☐☐هل سيتم معالجة المياه العادمة في الموقع؟ اذكر الطريقة
10.Will the generated wastewater be discharged directly into the marine environment?☐☐هل سيتم تصريف المياه العادمة مباشرة إلى البحر؟
SECTION 4: List all Raw Materials and Consumable Items to be Used During all Primary and Secondary Process at the Facility

القسم 4: قائمة المواد الأولية والاستهلاكية المستخدمة خلال مراحل التشغيل الأولية والثانوية للمنشأة
Note: MSDSs must be uploaded for all chemicals used

ملاحظة: يجب إرفاق جميع لوائح السلامة العامة للمواد الكيميائية المستخدمة
المادةالتركيبة الكيميائية (إن وجدت)الغرض من الاستخدامالوضع الفيزيائي للمادة (صلب، سائل، غاز، شبه صلب)معدل الاستهلاك السنويوحدة القياسطريقة التخزين
MaterialChemical Composition (if applicable)Purpose of UsePhysical State (Solid, Liquid, Gas, or Semi-Solid)Annual Consumption RateMeasurement UnitStorage Method
1.      
2.      
# SECTION 5: List all Primary and Secondary Products of the Facility

# القسم 5: قائمة المنتجات الأولية والثانوية للمنشأة
طريقة التخزينطريقة النقلوحدة القياسمعدل الإنتاج السنويالمنتج
ProductAnnual Production RateMeasurement UnitTransportation MethodStorage Methods
      
      
# SECTION 6: List All the Equipment and Machinery Used in the Facility Processes

# القسم 6: قائمة جميع المعدات والآلات المستخدمة في العمليات الأولية والثانوية للمنشأة
وحدة القياسمعدل استهلاك الطاقة السنوينوع مصدر الطاقة (الكهرباء، الغازولين، الديزل، الغاز الطبيعي، غاز البترول المسال)العددالوظيفةدورية الصيانةالمعدات / الآلات
Equipment / MachinesFunctionQuantityType of Power Supply (Electricity, Diesel, Natural Gas, LPG)Annual Power Consumption RateMeasurement Unit
       
       
4. 
# **SECTION 7: Usage of Fuel in the Facility Operations**

# **القسم 7: استخدام الوقود في العمليات التشغيلية للمنشأة**
نوع الوقود (الغازولين، الديزل، الغاز الطبيعي، غاز، البترول المسال)المصدرالمعدات / الآلات التي تستخدم هذا الوقودطريقة النقلطريقة التخزينكمية التخزين المتوقعة (سنويا)وحدة القياسكمية الاستهلاك اليوميوحدة القياس
Fuel Type (Gasoline, Diesel, Natural Gas, LPG, Coal, Petcoke)SourceEquipment / Machines Utilizing this FuelTransportation MethodStorage MethodAnnual Expected Storage QuantityMeasurement UnitDaily Consumption RateMeasurement Unit
1.        
2.        
# **SECTION 8: Usage of Water in the Facility Processes**

# **القسم 8: استخدام المياه في العمليات التشغيلية للمنشأة**
نوع المياهالمصدرالاستعمالمعدل الاستهلاك الشهريوحدة القياس
Type of WaterSourceUsageMonthly Consumption RateMeasurement Unit
1.    
2. 
3. 

Part 9: List of hazardous and non-hazardous solid waste generated by the facility

Type of wasteMSDSSourceRisk category (high risk, low risk)Monthly production rateStorage instructionsTreatment (if any)Final disposal siteName of waste disposal service provider
Name of Waste Service Provider
Waste TypeSourceHazard Category (Hazardous, Non-Hazardous)Monthly Generation RateStorage MethodTreatment Methods (if applicable)Final Disposal PointName of Waste Service Provider 
1.        
2.        

Part 10: List of hazardous and non-hazardous liquid waste generated by the facility

Type of wasteSourceRisk category (high risk, low risk)Monthly discharge rateStorage instructionsTreatment (if any)Final disposal siteName of waste disposal service provider
Name of Waste Service Provider
Waste TypeSourceHazard Category (Hazardous, Non-Hazardous)Monthly Discharge RateStorage MethodTreatment Methods (if applicable)Final Disposal Point 
        
1.       
2.       

Part 11: List of emissions generated by the facility

Type of emissionSourcePeriodic measurementMonthly production rateUnit of measurementA means of controlling these emissionsSurveillance system (if any)